BELL US0190 (6492-19-001)

Items: 25

County: BELL
Length: 0.0100 MILES
Highway: US0190
District: WACO
Control Number: 6492-19-001
DBE Goal: 0.0%
Project: RMC - A00218027
Guaranty: $13,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $671,013.75
Date: 01/14/2026 (4 months ago) Changed
Contract Number: 1260901
Type: BASE FAILURE PAVEMENT REPAIR
Project ID: A00218027
Project Description: BASE FAILURE REPAIR VARIOUS ROADWAYS ACROSS BELL COUNTY.
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$671,013.75
$527,000.00
Over/Under Est: -21.46% -$144,013.75
Over/Under Est: -17.28% -$115,967.50
Amt Left: 5.32% $28,046.25
Over/Under Est: 28.4% $190,577.34
Amt Left: 63.49% $334,591.09
Delta: -55.23% -$306,544.84

Bid Items & Bid Tabulations

25 Total 0 of 25
BELL  |  US0190  |  WACO  |  6492-19-001  |  01/14/2026  |  $671,013.75  |  RMC - A00218027  |  BASE FAILURE PAVMT REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
D-GR HMA TY-C PG70-22
TON 1,200.000 $265.000 $128.000 $132.300 $181.000
D-GR HMA TY-D PG70-22
TON 600.000 $122.000 $133.000 $135.250 $184.000
TACK COAT
GAL 600.000 $4.000 $4.000 $2.750 $8.250
SP MIXES SP-C PG70-22
TON 900.000 $142.250 $128.000 $145.200 $200.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 800.000 $35.000 $36.000 $53.800 $101.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,000.000 $70.000 $72.000 $67.900 $115.000
PLANE ASPH CONC PAV(2")
SY 5,000.000 $3.250 $3.250 $3.650 $6.700
MOBILIZATION (CALLOUT)
EA 5.000 $1.000 $250.000 $10.000 $4,550.000
MOBILIZATION (EMERGENCY)
EA 3.000 $220.000 $400.000 $4,990.000 $2,453.030
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 25.000 $90.000 $105.000 $62.850 $305.000
TMA (STATIONARY)
DAY 50.000 $150.000 $210.000 $85.000 $720.000
TMA (MOBILE OPERATION)
HR 25.000 $75.000 $100.000 $50.000 $105.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 500.000 $1.000 $1.500 $0.950 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 500.000 $1.000 $1.500 $0.950 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 50.000 $7.500 $10.500 $15.000 $17.740
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 1,000.000 $0.700 $1.300 $1.250 $1.480
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 5,000.000 $0.620 $1.300 $1.250 $1.480
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 1,000.000 $0.680 $1.300 $1.250 $1.480
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 5,000.000 $0.600 $1.300 $1.250 $1.480
PREFAB PM TY C (W)(ARROW)
EA 5.000 $225.000 $350.000 $335.000 $400.000
PREFAB PM TY C (W)(WORD)
EA 5.000 $263.750 $600.000 $500.000 $590.000
REFL PAV MRKR TY I-C
EA 200.000 $5.000 $7.500 $7.000 $8.300
REFL PAV MRKR TY II-A-A
EA 500.000 $5.000 $7.000 $6.450 $7.650
UNDERSEAL COURSE
GAL 1,500.000 $3.700 $4.000 $4.000 $6.950
MAINTENANCE SPEED LIMIT SIGNING
DAY 25.000 $100.000 $300.000 $1.000 $115.000
Totals: $671,013.750 $527,000.000 $555,046.250 $861,591.090