MCLENNAN SH0031 (6479-86-001)

Items: 66

County: MCLENNAN
Length: 0.0100 MILES
Highway: SH0031
District: WACO
Control Number: 6479-86-001
DBE Goal: 0.0%
Project: RMC - A00213955
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,696,076.27
Date: 09/04/2025 (9 months ago) Changed
Contract Number: 9254006
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00213955
Project Description: METAL BEAM GUARD FENCE REPAIR ACROSS BELL COUNTY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$1,696,076.27
$1,102,226.50
Over/Under Est: -35.01% -$593,849.77
Over/Under Est: -33.39% -$566,327.27
Amt Left: 2.5% $27,522.50
Over/Under Est: -30.73% -$521,267.97
Amt Left: 6.59% $72,581.80
Delta: -3.99% -$45,059.30
$1,180,158.00
Over/Under Est: -30.42% -$515,918.27
Amt Left: 7.07% $77,931.50
Delta: -0.46% -$5,349.70
$1,219,379.00
Over/Under Est: -28.11% -$476,697.27
Amt Left: 10.63% $117,152.50
Delta: -3.32% -$39,221.00
Over/Under Est: 35.74% $606,183.73
Amt Left: 108.87% $1,200,033.50
Delta: -88.81% -$1,082,881.00

Bid Items & Bid Tabulations

66 Total 0 of 66
MCLENNAN  |  SH0031  |  WACO  |  6479-86-001  |  09/04/2025  |  $1,696,076.27  |  RMC - A00213955  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RHINO EQUITY, LLC
BK FIELD OPERATIONS LLC
T&L CLEANING SERVICES LLC
SHORT-LINE CORPORATION
ROSS SA ENTERPRISE LLC
ABOVE ALL CONTRACTING LLC
EMBANK (VEH)(OC)(TY B)
CY 20.000 $57.750 $25.000 $80.000 $100.000 $25.000 $25.000 $250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 100.000 $262.500 $35.000 $30.000 $50.000 $100.000 $50.000 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 100.000 $761.250 $200.000 $300.000 $400.000 $200.000 $100.000 $500.000
MOBILIZATION (CALLOUT)
EA 55.000 $525.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000
MOBILIZATION (EMERGENCY)
EA 20.000 $1,050.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 21.000 $111.300 $1.000 $1.000 $200.000 $1.000 $100.000 $300.000
TMA (STATIONARY)
DAY 120.000 $262.500 $1.000 $1.000 $500.000 $1.000 $1.000 $1,000.000
MTL W-BEAM GD FEN (STEEL POST)
LF 400.000 $36.750 $28.000 $30.000 $30.000 $30.000 $35.000 $60.000
MTL THRIE-BEAM GD FEN (STEEL POST)
LF 100.000 $84.000 $35.000 $10.000 $25.000 $30.000 $50.000 $3,000.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,526.830 $2,000.000 $1,800.000 $1,800.000 $3,000.000 $1,750.000 $700.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,603.850 $1,200.000 $1.000 $1,500.000 $1,000.000 $1,350.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $3.220 $1.000 $10.000 $0.010 $1.000 $8.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 9.000 $262.500 $1.000 $1.000 $1.000 $1.000 $1.000 $100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $315.000 $1.000 $1.000 $1.000 $1.000 $100.000 $100.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 4.000 $2,100.000 $2,000.000 $1.000 $1,000.000 $3,000.000 $2,500.000 $3,500.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $2,100.000 $1,500.000 $5.000 $1,000.000 $2,500.000 $1,500.000 $5,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,136.000 $1.000 $1.000 $1.000 $100.000 $850.000 $200.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $15,000.000 $2,500.000 $1.000 $1.000 $25,000.000 $2,500.000 $30,000.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 2.000 $13,650.000 $2,500.000 $1.000 $1.000 $35,000.000 $2,500.000 $35,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 30.000 $36.750 $15.000 $10.000 $10.000 $50.000 $20.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $38.850 $15.000 $10.000 $10.000 $50.000 $20.000 $25.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 4,400.000 $26.250 $12.000 $9.000 $17.000 $12.000 $20.000 $35.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 175.000 $36.750 $20.000 $60.000 $25.000 $50.000 $35.000 $75.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 10.000 $52.500 $300.000 $400.000 $250.000 $500.000 $150.000 $500.000
REPLACE STEEL POST W/O CONC FND
EA 170.000 $68.250 $240.000 $55.000 $1.000 $50.000 $60.000 $80.000
REPLACE STEEL POST W/ CONC FND
EA 295.000 $78.750 $240.000 $55.000 $1.000 $50.000 $110.000 $100.000
REALIGN POSTS
EA 80.000 $23.630 $110.000 $200.000 $1.000 $100.000 $100.000 $35.000
REM OBSOLETE GET & REPL W/ SGT
EA 100.000 $4,000.000 $3,000.000 $2,900.000 $2,500.000 $2,000.000 $2,900.000 $3,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,050.000 $2,000.000 $2,000.000 $1,500.000 $2,500.000 $2,000.000 $1,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 200.000 $42.000 $130.000 $60.000 $200.000 $100.000 $100.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 80.000 $105.000 $190.000 $200.000 $100.000 $100.000 $150.000 $150.000
REPLACE BLOCKOUT
EA 375.000 $31.500 $20.000 $100.000 $1.000 $5.000 $8.000 $50.000
RESET SGT IMPACT HEAD
EA 20.000 $210.000 $5.000 $25.000 $50.000 $1.000 $10.000 $200.000
REPLACE SGT OBJECT MARKER
EA 50.000 $31.500 $1.000 $1.000 $30.000 $1.000 $5.000 $50.000
REPLACE SGT CABLE ANCHOR
EA 20.000 $73.500 $85.000 $400.000 $70.000 $100.000 $10.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 20.000 $81.900 $85.000 $400.000 $70.000 $100.000 $10.000 $100.000
REPLACE SGT STRUT
EA 10.000 $70.880 $85.000 $300.000 $100.000 $100.000 $11.000 $100.000
RAISE RAIL
LF 220.000 $8.400 $0.500 $1.000 $1.000 $1.000 $5.000 $5.000
REALIGN EXISTING RAIL
LF 120.000 $9.450 $10.000 $1.000 $1.000 $1.000 $5.000 $10.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 675.000 $200.000 $180.000 $329.000 $150.000 $250.000 $400.000 $200.000
REPLACE POSTS (TL-4)(TRINITY)
EA 500.000 $200.000 $220.000 $358.000 $220.000 $250.000 $400.000 $220.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $105.000 $100.000 $2,369.000 $300.000 $500.000 $100.000 $300.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $52.500 $1.000 $1.000 $1.000 $1.000 $50.000 $1,000.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 40.000 $1,575.000 $1,500.000 $2,000.000 $1,000.000 $1,500.000 $950.000 $2,500.000
REPLACE CABLE (TL-4)
LF 1,230.000 $4.200 $1.000 $0.100 $0.010 $5.000 $4.000 $10.000
CHECK / RE-TENSION CABLE (TL-4)
EA 30.000 $105.000 $2,000.000 $1.000 $1.000 $500.000 $52.000 $500.000
POST AND CABLE FENCE (REMOVAL)
LF 530.000 $5.240 $0.050 $0.100 $1.000 $1.000 $2.000 $2.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 70.000 $18.000 $10.000 $3.000 $10.000 $50.000 $20.000 $25.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 3.000 $105.000 $50.000 $1.000 $100.000 $100.000 $50.000 $500.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 45.000 $105.000 $65.000 $10.000 $30.000 $100.000 $50.000 $50.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 220.000 $10.500 $3.000 $0.100 $4.000 $5.000 $5.000 $10.000
REPAIR (SMTC) NARROW
LF 50.000 $200.000 $250.000 $100.000 $200.000 $250.000 $220.000 $200.000
REPAIR (QUAD - ELITE) NARROW
LF 25.000 $150.000 $200.000 $100.000 $200.000 $200.000 $220.000 $500.000
REPAIR (TAU-M) NARROW
LF 25.000 $550.000 $200.000 $400.000 $1.000 $200.000 $220.000 $500.000
REPLACE (BEAT - SSCC)
EA 1.000 $3,300.000 $5,000.000 $10,000.000 $5,000.000 $10,000.000 $6,250.000 $10,000.000
REPAIR (QUAD)(N)(M)
LF 25.000 $250.000 $200.000 $450.000 $200.000 $200.000 $260.000 $500.000
REPLACE CRASH CUSH ATTEN (L)(N)(TL3)
EA 8.000 $20,000.000 $2,500.000 $1.000 $20,000.000 $10,000.000 $2,500.000 $27,000.000
REPLACE CRASH CUSH ATTEN (R)(N)(TL3)
EA 5.000 $15,000.000 $2,500.000 $1.000 $20,000.000 $100.000 $2,500.000 $30,000.000
REPLACE CRASH CUSH ATTEN (R)(N)(TL2)
EA 2.000 $10,000.000 $2,500.000 $1.000 $15,000.000 $10,000.000 $2,500.000 $25,000.000
REPAIR (STEEL RAIL)
LF 420.000 $150.000 $6.500 $1.000 $1.000 $100.000 $40.000 $50.000
REPAIR (STEEL PED. RAIL)
LF 200.000 $183.750 $25.000 $170.000 $100.000 $100.000 $100.000 $200.000
REPAIR (STEEL POST W/ BASE PLATE)(T101)
EA 5.000 $500.000 $20.000 $1.000 $100.000 $200.000 $100.000 $300.000
REPAIR (STL POST W/ BASE PLATE)(T101RC)
EA 5.000 $500.000 $20.000 $200.000 $800.000 $200.000 $100.000 $300.000
REPAIR (ALUM POST W/ BASE PLATE)(T4(A))
EA 5.000 $105.000 $100.000 $1.000 $1,500.000 $200.000 $150.000 $500.000
REPAIR (STEEL POST W/CHANNEL IRON RAIL)
LF 200.000 $250.000 $150.000 $1.000 $100.000 $100.000 $50.000 $100.000
MAINTENANCE SPEED LIMIT SIGNING
DAY 65.000 $157.500 $100.000 $1.000 $1.000 $100.000 $50.000 $500.000
Totals: $1,696,076.270 $1,102,226.500 $1,129,749.000 $1,174,808.300 $1,180,158.000 $1,219,379.000 $2,302,260.000