Show Job Controls
Bid Cobra

BELL IH0035 (6450-13-001)

Items: 207

County: BELL
Length: N/A
Highway: IH0035
District: WACO
Control Number: 6450-13-001
DBE Goal: N/A
Project: RMC - 645013001
Guaranty: N/A
Time: 1096 CALENDAR DAYS
Engineer's Estimate: $38,574,454.00
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: TOTAL MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$38,574,454.00
$37,852,916.69
Over/Under Est: -1.87% -$721,537.31
Over/Under Est: 21.79% $8,403,932.30
Amt Left: 24.11% $9,125,469.61
Subcontractor Percentage Amount
BK FIELD OPERATIONS LLC 1.98% $769,106.20
A.N.E. CONCRETE CUTTING LLC 0.39% $151,490.61
TEXAS MATERIALS GROUP, INC. 0.37% $143,721.87
HOLLINGSWORTH CONCRETE CORING 0.19% $73,803.12
WACO DRILLING CO., INC. 0.13% $50,496.87
BATTERSON, LLP 0.05% $19,421.87
GRONES ENVIRONMENTAL SERVICES, LTD., L.L.P. 0.03% $11,653.12
YES AMERICA NOW, INC. 0.00% $0.00
T&L CLEANING SERVICES LLC 0.00% $0.00
CEN-TEX IRRIGATION SYSTEMS, INC. 0.00% $0.00
ORTEGA'S LAWN AND LANDSCAPING, LLC 0.00% $0.00
Total: 3.14% $1,219,693.66

Bid Items & Bid Tabulations

207 Total 0 of 207
BELL  |  IH0035  |  WACO  |  6450-13-001  |  08/03/2023  |  $38,574,454.00  |  RMC - 645013001  |  TOTAL MAINT  |  1096 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
WEBBER INFRASTRUCTURE MANAGEMENT, INC.
REMOVING CONC (CTB)
LF 600.000 $32.000 $50.000 $60.000
REMOVE CONC (RAIL)
LF 150.000 $72.000 $150.000 $175.000
EXCAVATION (CHANNEL)
CY 6,000.000 $27.000 $30.000 $30.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 500.000 $42.000 $50.000 $50.000
BACKFILL (TY A)
STA 350.000 $300.000 $75.000 $200.000
BACKFILL (TY B)
STA 400.000 $275.000 $50.000 $200.000
BLADING
HR 400.000 $170.000 $250.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 3,000.000 $75.000 $140.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 4,000.000 $125.000 $210.000 $200.000
PLANE ASPH CONC PAV(0" TO 2")
SY 20,000.000 $6.000 $0.950 $11.000
HALF-DEPTH REPAIR CRCP (VAR DEPTH)
SY 600.000 $750.000 $450.000 $500.000
FULL-DEPTH REPAIR CRCP (8"-10")
SY 1,500.000 $322.000 $300.000 $375.000
FULL-DEPTH REPAIR CRCP (13"-15")
SY 2,500.000 $450.000 $650.000 $700.000
FLOWABLE BACKFILL
CY 200.000 $355.000 $225.000 $300.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,000.000 $230.000 $180.000 $200.000
CONC STR REPAIR (STANDARD)
SF 1,000.000 $234.000 $150.000 $200.000
RIPRAP (CONC)(CL B)
CY 500.000 $765.000 $475.000 $750.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 600.000 $196.000 $200.000 $225.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 500.000 $185.000 $200.000 $325.000
CLEANING AND SEALING JOINTS
LF 20,000.000 $50.000 $25.000 $6.100
MOBILIZATION (CALLOUT)
EA 216.000 $500.000 $950.000 $3,250.000
MOBILIZATION (EMERGENCY)
EA 1,080.000 $500.000 $1.000 $500.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 900.000 $100.000 $200.000 $200.000
MTL W-BEAM GD FEN (STEEL POST)
LF 6,000.000 $23.000 $32.000 $40.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 15.000 $2,310.000 $2,000.000 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 30.000 $1,540.000 $1,500.000 $2,000.000
MTL BM GD FEN TRANS (NON - SYM)
EA 15.000 $1,175.000 $750.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 5,000.000 $4.000 $3.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 20.000 $290.000 $250.000 $105.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 25.000 $200.000 $250.000 $3,600.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 12.000 $270.000 $400.000 $3,600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 75.000 $3,290.000 $3,400.000 $5,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 75.000 $310.000 $250.000 $360.000
CRASH CUSH ATTEN (REMOVE)
EA 30.000 $1,175.000 $1,250.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 30.000 $25,000.000 $26,000.000 $30,000.000
ALUMINUM SIGNS (TY A)
SF 1,000.000 $42.000 $25.000 $33.000
ALUMINUM SIGNS (TY G)
SF 2,000.000 $34.000 $28.000 $33.000
ALUMINUM SIGNS (TY O)
SF 1,000.000 $32.000 $35.000 $33.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 2,000.000 $57.000 $30.000 $33.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 2,000.000 $60.000 $35.000 $33.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 200.000 $865.000 $400.000 $1,425.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 100.000 $865.000 $400.000 $1,525.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 200.000 $1,235.000 $500.000 $1,625.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 200.000 $1,400.000 $400.000 $1,650.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 200.000 $770.000 $400.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 100.000 $770.000 $400.000 $1,600.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 200.000 $2,100.000 $400.000 $2,650.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 50.000 $2,600.000 $2,000.000 $3,800.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 50.000 $2,730.000 $2,000.000 $3,800.000
INSTALL LRSS (STRUCT STEEL)
LB 4,000.000 $7.000 $10.000 $8.500
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 2,000.000 $46.000 $30.000 $35.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 2,000.000 $23.000 $4.780 $50.000
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
EA 2,000.000 $55.000 $30.000 $35.000
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
EA 2,000.000 $61.000 $30.000 $35.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 3,000.000 $27.000 $10.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 2,000.000 $34.000 $25.000 $35.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,000.000 $2.000 $1.250 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 2,000.000 $2.000 $1.250 $2.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 10,000.000 $2.000 $2.370 $2.350
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
LF 10,000.000 $1.000 $2.370 $2.350
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 10,000.000 $2.000 $1.320 $1.380
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 10,000.000 $3.000 $3.680 $3.270
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 10,000.000 $4.000 $4.730 $5.110
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 200.000 $9.000 $9.450 $10.220
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 100.000 $180.000 $299.250 $170.740
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 100.000 $410.000 $577.500 $429.410
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 100.000 $525.000 $693.000 $869.050
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 100.000 $60.000 $46.200 $76.680
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 10,000.000 $1.000 $1.000 $1.380
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 30,000.000 $1.000 $0.820 $0.900
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 30,000.000 $1.000 $0.820 $0.850
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 30,000.000 $1.000 $0.820 $0.900
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 30,000.000 $1.000 $0.820 $0.850
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 100,000.000 $1.000 $1.320 $1.430
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 100,000.000 $1.000 $1.320 $1.430
REFL PAV MRKR TY I-C
EA 7,500.000 $6.000 $3.750 $5.370
REFL PAV MRKR TY I-R
EA 7,500.000 $7.000 $10.000 $10.220
REFL PAV MRKR TY II-A-A
EA 75,000.000 $7.000 $3.750 $5.370
REFL PAV MRKR TY II-C-R
EA 75,000.000 $6.000 $6.250 $5.370
POTHOLE REPAIR (STANDARD)
SY 1,500.000 $185.000 $110.000 $375.000
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 15,000.000 $130.000 $65.000 $95.000
SPOT MOWING
AC 1,700.000 $50.000 $50.000 $265.000
FULL - WIDTH MOWING - TRACT (1)
AC 22,848.000 $55.000 $58.000 $70.000
FULL - WIDTH MOWING - TRACT (2)
AC 16,332.000 $55.000 $58.000 $70.000
FULL - WIDTH MOWING - TRACT (3)
AC 16,968.000 $55.000 $58.000 $70.000
LITTER REMOVAL (SPOT)
AC 2,800.000 $23.000 $20.000 $200.000
LITTER REMOVAL - TRACT (1)
CYC 12.000 $66,640.000 $36,176.000 $110,000.000
LITTER REMOVAL - TRACT (2)
CYC 12.000 $47,635.000 $25,859.000 $85,000.000
LITTER REMOVAL - TRACT (3)
CYC 12.000 $49,350.000 $26,866.000 $90,000.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 2,300.000 $100.000 $1.000 $100.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
CYC 72.000 $3,394.000 $11,250.000 $9,000.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
CYC 72.000 $2,334.000 $7,750.000 $5,000.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
CYC 72.000 $2,052.000 $7,000.000 $4,500.000
DEBRIS - FRONTAGE ROADS - AREA (1)
CYC 72.000 $3,840.000 $11,250.000 $6,000.000
DEBRIS - FRONTAGE ROADS - AREA (2)
CYC 72.000 $2,758.000 $7,750.000 $5,000.000
DEBRIS - FRONTAGE ROADS - AREA (3)
CYC 72.000 $1,102.000 $7,000.000 $2,000.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (1)
CYC 72.000 $1,609.000 $10,750.000 $3,000.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (2)
CYC 72.000 $844.000 $7,750.000 $2,000.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (3)
CYC 72.000 $342.000 $3,500.000 $600.000
DEBRIS-DIRECT CONNECTOR - AREA (1)
CYC 72.000 $720.000 $5,500.000 $800.000
DEBRIS-DIRECT CONNECTOR - AREA (2)
CYC 72.000 $489.000 $3,250.000 $525.000
DEBRIS-DIRECT CONNECTOR - AREA (3)
CYC 72.000 $227.000 $1,750.000 $300.000
CLEANING / SWEEPING (SPOT)
MI 660.000 $190.000 $1.000 $250.000
CLEANING / SWEEPING (HANDWORK)
SY 347,313.000 $1.000 $0.250 $1.100
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
CYC 72.000 $12,956.000 $22,570.740 $16,500.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
CYC 72.000 $8,910.000 $16,879.740 $12,500.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
CYC 72.000 $7,837.000 $15,371.680 $9,500.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
CYC 72.000 $13,573.000 $22,570.740 $16,500.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
CYC 72.000 $9,334.000 $16,879.740 $12,500.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
CYC 72.000 $8,210.000 $15,371.680 $9,500.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
CYC 72.000 $13,586.000 $8,722.220 $12,000.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
CYC 72.000 $9,758.000 $6,264.570 $9,000.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
CYC 72.000 $3,900.000 $2,504.250 $4,500.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
CYC 72.000 $6,935.000 $4,096.320 $6,500.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
CYC 72.000 $3,638.000 $2,148.570 $3,500.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
CYC 72.000 $1,474.000 $870.190 $1,200.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
CYC 72.000 $1,800.000 $1,063.790 $1,500.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
CYC 72.000 $1,223.000 $72.190 $1,000.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(3)
CYC 72.000 $568.000 $361.600 $500.000
GRAFFITI REMOVAL (BLAST CLEANING)
SF 5,000.000 $2.000 $2.000 $15.000
GRAFFITI REMOVAL (PAINTING)
SF 5,000.000 $3.000 $1.250 $15.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 5,000.000 $2.000 $2.000 $15.500
TREE TRIMMING / BRUSH REMOVAL
MI 15.000 $3,200.000 $1,500.000 $2,750.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 100.000 $2,500.000 $1,250.000 $2,200.000
TREE REMOVAL (4" - 12" DIA)
EA 250.000 $85.000 $90.000 $250.000
TREE REMOVAL (12" - 18" DIA)
EA 50.000 $100.000 $90.000 $350.000
TREE REMOVAL (18" - 24" DIA)
EA 50.000 $165.000 $100.000 $400.000
TREE REMOVAL (24" - 30" DIA)
EA 50.000 $290.000 $150.000 $600.000
TREE REMOVAL (30" - 36" DIA)
EA 50.000 $350.000 $250.000 $750.000
TREE REMOVAL (36" - 42" DIA)
EA 50.000 $400.000 $350.000 $1,000.000
TREE REMOVAL (42" - 48" DIA)
EA 50.000 $500.000 $500.000 $1,500.000
STUMP REMOVAL
EA 50.000 $100.000 $150.000 $250.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 25,000.000 $8.000 $3.000 $9.000
DRAIN INLET CLEANING
EA 250.000 $370.000 $125.000 $200.000
STORM SEWER CLEANING (PIPE) (<12" DIA)
LF 1,000.000 $4.000 $10.000 $25.000
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 1,000.000 $11.000 $5.000 $35.000
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 1,000.000 $9.000 $7.000 $50.000
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 1,000.000 $7.000 $9.000 $50.000
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 1,000.000 $15.000 $11.000 $60.000
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 1,000.000 $11.000 $12.000 $70.000
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
LF 1,000.000 $17.000 $16.000 $75.000
STORM SEWER CLEANING (PIPE)(55"-74"DIA)
LF 1,000.000 $22.000 $18.000 $80.000
STORM SEWER CLEANING (PIPE)(75"-96"DIA)
LF 1,000.000 $30.000 $19.000 $100.000
STORM SEWER CLEAN (BOX CULV) (<6 SF)
LF 1,000.000 $11.000 $9.000 $40.000
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
LF 1,000.000 $13.000 $12.000 $45.000
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
LF 1,000.000 $15.000 $20.500 $50.000
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 1,000.000 $21.000 $21.000 $70.000
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
LF 3,000.000 $18.000 $24.000 $80.000
STORM SEWER CLEAN (BOX CULV) (>96 SF)
LF 3,000.000 $38.000 $27.000 $100.000
SLOTTED DRAIN CLEANING
LF 1,000.000 $25.000 $25.000 $20.000
REPLACE POSTS (TL-3)
EA 100.000 $80.000 $280.000 $310.000
REPLACE POSTS (TL-4)
EA 500.000 $180.000 $315.000 $310.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 20.000 $125.000 $300.000 $20.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 100.000 $180.000 $300.000 $20.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 200.000 $75.000 $250.000 $55.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 1,000.000 $125.000 $150.000 $55.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 10.000 $1,100.000 $1,200.000 $3,100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 50.000 $1,700.000 $1,200.000 $3,100.000
REPLACE CABLE (TL-3)
LF 1,000.000 $6.000 $1.000 $5.000
REPLACE CABLE (TL-4)
LF 5,000.000 $15.000 $1.000 $5.000
CHECK / RE-TENSION CABLE
EA 200.000 $200.000 $250.000 $255.000
REPLACE POST HARDWARE (TL-4)
EA 1,000.000 $27.000 $35.000 $25.000
REPLACE POSTS (TL-3)(FURN)
EA 200.000 $100.000 $75.000 $150.000
REPLACE POSTS (TL-4)(FURN)
EA 1,000.000 $100.000 $75.000 $150.000
REP OR REPLC CAB BAR TM SEC TL-3(FURN)
EA 20.000 $300.000 $500.000 $1,300.000
REP OR REPLC CAB BAR TM SEC TL-4(FURN)
EA 100.000 $300.000 $500.000 $1,300.000
REPLACE POST HARDWARE (TL-3)
EA 200.000 $15.000 $32.000 $25.000
REPLACE CCT POST (5 FT 3 IN)
EA 20.000 $175.000 $270.000 $350.000
REPLACE CCT POST (5 FT 11 IN)
EA 100.000 $175.000 $300.000 $350.000
REMOVE AND REPLACE (WIDE TRACC)
EA 25.000 $13,000.000 $1.000 $25.000
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 20.000 $500.000 $650.000 $500.000
REPAIR (ALUMINUM RAIL)
LF 1,500.000 $225.000 $205.000 $250.000
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
LF 1,000.000 $2,650.000 $425.000 $150.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 25,000.000 $6.000 $5.250 $5.000
REMOVE ROADWAY ILLUM ASSEMBLY (HPS)
EA 50.000 $400.000 $250.000 $1,000.000
INSTALL ROADWAY ILLUM ASSEMBLY (LED)
EA 50.000 $810.000 $2,500.000 $1,500.000
REPLACE ROADWAY ILLUM ASSEMBLY (LED)
EA 30.000 $2,270.000 $1,250.000 $1,900.000
TROUBLESHOOT FOR REPAIRS
HR 50.000 $120.000 $175.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 300.000 $115.000 $125.000 $800.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 100,000.000 $1.000 $1.000 $0.830
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 50,000.000 $1.000 $1.000 $0.900
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 10,000.000 $2.000 $2.100 $2.560
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 100,000.000 $1.000 $1.000 $0.830
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 30.000 $2,000.000 $850.000 $2,100.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 30.000 $1,240.000 $1,000.000 $3,100.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 100.000 $560.000 $1.000 $2,600.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 1,000.000 $370.000 $350.000 $200.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 1,000.000 $265.000 $200.000 $500.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 1,000.000 $145.000 $1.000 $500.000
TMA (STATIONARY)
DAY 3,000.000 $230.000 $1.000 $250.000
TMA (MOBILE OPERATION)
HR 10,000.000 $85.000 $160.000 $75.000
INCIDENT MANAGEMENT (TYPE A)
HR 100.000 $100.000 $250.000 $350.000
INCIDENT MANAGEMENT (TYPE B)
HR 100.000 $140.000 $250.000 $500.000
INCIDENT MANAGEMENT (TYPE C)
HR 100.000 $50.000 $100.000 $750.000
INCIDENT MANAGEMENT (TYPE D)
HR 100.000 $50.000 $1.000 $1,000.000
INCIDENT MANAGEMENT (TYPE E)
HR 100.000 $140.000 $400.000 $1,500.000
INCIDENT MANAGEMENT (TYPE F)
HR 100.000 $90.000 $150.000 $1,000.000
INCIDENT MANAGEMENT (TYPE G)
HR 100.000 $90.000 $100.000 $1,500.000
INCIDENT MANAGEMENT (TYPE H)
HR 100.000 $95.000 $100.000 $1,000.000
INCIDENT MANAGEMENT (TYPE I)
HR 100.000 $75.000 $150.000 $1,500.000
INCIDENT MANAGEMENT (TYPE J)
HR 100.000 $40.000 $50.000 $150.000
MOBILE RETROREFLECTIVITY DATA COLLECT
MI 1,000.000 $250.000 $50.000 $18.500
REML & DISPL DRIFTWOOD & DEBRIS
CY 2,000.000 $190.000 $65.000 $150.000
SNOW AND ICE CONTROL (TRUCK)
HR 3,000.000 $100.000 $110.000 $275.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 3,000.000 $50.000 $105.000 $150.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 3,000.000 $100.000 $65.000 $150.000
SNOW AND ICE CONTROL (BLADE)
HR 200.000 $175.000 $500.000 $150.000
Totals: $38,574,454.000 $37,852,916.690 $46,978,386.300