REMOVING CONC (CTB)
|
LF
|
600.000
|
$32.000
|
$123.620
|
|
|
REMOVE CONC (RAIL)
|
LF
|
150.000
|
$72.000
|
$188.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
6,000.000
|
$27.000
|
$35.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
500.000
|
$42.000
|
$20.000
|
|
|
BACKFILL (TY A)
|
STA
|
350.000
|
$300.000
|
$275.000
|
|
|
BACKFILL (TY B)
|
STA
|
400.000
|
$275.000
|
$350.000
|
|
|
BLADING
|
HR
|
400.000
|
$170.000
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
3,000.000
|
$75.000
|
$143.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
4,000.000
|
$125.000
|
$218.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
20,000.000
|
$6.000
|
$9.200
|
|
|
HALF-DEPTH REPAIR CRCP (VAR DEPTH)
|
SY
|
600.000
|
$750.000
|
$565.000
|
|
|
FULL-DEPTH REPAIR CRCP (8"-10")
|
SY
|
1,500.000
|
$322.000
|
$325.000
|
|
|
FULL-DEPTH REPAIR CRCP (13"-15")
|
SY
|
2,500.000
|
$450.000
|
$675.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
200.000
|
$355.000
|
$200.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
1,000.000
|
$230.000
|
$200.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
1,000.000
|
$234.000
|
$200.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
500.000
|
$765.000
|
$375.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
600.000
|
$196.000
|
$200.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
500.000
|
$185.000
|
$200.000
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
20,000.000
|
$50.000
|
$20.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
216.000
|
$500.000
|
$6,000.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
1,080.000
|
$500.000
|
$2,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
500.000
|
$30.000
|
$1.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
500.000
|
$10.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$4.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$1.000
|
$1.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
900.000
|
$100.000
|
$256.170
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
6,000.000
|
$23.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
15.000
|
$2,310.000
|
$1,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
30.000
|
$1,540.000
|
$1,000.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
15.000
|
$1,175.000
|
$1,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,000.000
|
$4.000
|
$14.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
20.000
|
$290.000
|
$100.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
25.000
|
$200.000
|
$100.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$270.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
75.000
|
$3,290.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
75.000
|
$310.000
|
$269.240
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
30.000
|
$1,175.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
30.000
|
$25,000.000
|
$20,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
1,000.000
|
$42.000
|
$19.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
2,000.000
|
$34.000
|
$25.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,000.000
|
$32.000
|
$25.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
2,000.000
|
$57.000
|
$30.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
2,000.000
|
$60.000
|
$40.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
200.000
|
$865.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
100.000
|
$865.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
200.000
|
$1,235.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
200.000
|
$1,400.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P)
|
EA
|
200.000
|
$770.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
100.000
|
$770.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
200.000
|
$2,100.000
|
$2,500.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
50.000
|
$2,600.000
|
$800.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
50.000
|
$2,730.000
|
$800.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
4,000.000
|
$7.000
|
$8.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
2,000.000
|
$46.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
2,000.000
|
$23.000
|
$5.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
|
EA
|
2,000.000
|
$55.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
|
EA
|
2,000.000
|
$61.000
|
$40.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
3,000.000
|
$27.000
|
$4.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
2,000.000
|
$34.000
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,000.000
|
$2.000
|
$2.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,000.000
|
$2.000
|
$2.500
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
10,000.000
|
$2.000
|
$2.530
|
|
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
|
LF
|
10,000.000
|
$1.000
|
$2.530
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
10,000.000
|
$2.000
|
$1.150
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
10,000.000
|
$3.000
|
$3.620
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
10,000.000
|
$4.000
|
$3.740
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
200.000
|
$9.000
|
$8.050
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
100.000
|
$180.000
|
$132.250
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
100.000
|
$410.000
|
$460.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
100.000
|
$525.000
|
$776.250
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
100.000
|
$60.000
|
$78.200
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
10,000.000
|
$1.000
|
$0.780
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
30,000.000
|
$1.000
|
$0.700
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
30,000.000
|
$1.000
|
$0.620
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
30,000.000
|
$1.000
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
30,000.000
|
$1.000
|
$0.620
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
100,000.000
|
$1.000
|
$1.150
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
100,000.000
|
$1.000
|
$1.150
|
|
REFL PAV MRKR TY I-C
|
EA
|
7,500.000
|
$6.000
|
$3.400
|
|
REFL PAV MRKR TY I-R
|
EA
|
7,500.000
|
$7.000
|
$15.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
75,000.000
|
$7.000
|
$3.400
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
75,000.000
|
$6.000
|
$3.400
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
1,500.000
|
$185.000
|
$200.000
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
15,000.000
|
$130.000
|
$55.000
|
|
|
SPOT MOWING
|
AC
|
1,700.000
|
$50.000
|
$5.000
|
|
|
FULL - WIDTH MOWING - TRACT (1)
|
AC
|
22,848.000
|
$55.000
|
$39.950
|
|
|
FULL - WIDTH MOWING - TRACT (2)
|
AC
|
16,332.000
|
$55.000
|
$39.950
|
|
|
FULL - WIDTH MOWING - TRACT (3)
|
AC
|
16,968.000
|
$55.000
|
$39.950
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
2,800.000
|
$23.000
|
$100.000
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
12.000
|
$66,640.000
|
$30,000.000
|
|
|
LITTER REMOVAL - TRACT (2)
|
CYC
|
12.000
|
$47,635.000
|
$18,365.090
|
|
|
LITTER REMOVAL - TRACT (3)
|
CYC
|
12.000
|
$49,350.000
|
$18,677.840
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
2,300.000
|
$100.000
|
$70.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
|
CYC
|
72.000
|
$3,394.000
|
$13,573.120
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
|
CYC
|
72.000
|
$2,334.000
|
$9,334.160
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
|
CYC
|
72.000
|
$2,052.000
|
$8,209.960
|
|
|
DEBRIS - FRONTAGE ROADS - AREA (1)
|
CYC
|
72.000
|
$3,840.000
|
$6,497.920
|
|
|
DEBRIS - FRONTAGE ROADS - AREA (2)
|
CYC
|
72.000
|
$2,758.000
|
$4,667.080
|
|
|
DEBRIS - FRONTAGE ROADS - AREA (3)
|
CYC
|
72.000
|
$1,102.000
|
$1,865.380
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (1)
|
CYC
|
72.000
|
$1,609.000
|
$3,051.620
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (2)
|
CYC
|
72.000
|
$844.000
|
$1,600.830
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (3)
|
CYC
|
72.000
|
$342.000
|
$648.340
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (1)
|
CYC
|
72.000
|
$720.000
|
$792.330
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (2)
|
CYC
|
72.000
|
$489.000
|
$538.010
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (3)
|
CYC
|
72.000
|
$227.000
|
$249.700
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
660.000
|
$190.000
|
$250.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
347,313.000
|
$1.000
|
$1.060
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
|
CYC
|
72.000
|
$12,956.000
|
$17,000.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
|
CYC
|
72.000
|
$8,910.000
|
$12,000.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
|
CYC
|
72.000
|
$7,837.000
|
$11,000.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
|
CYC
|
72.000
|
$13,573.000
|
$15,000.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
|
CYC
|
72.000
|
$9,334.000
|
$10,000.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
|
CYC
|
72.000
|
$8,210.000
|
$8,500.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
|
CYC
|
72.000
|
$13,586.000
|
$10,000.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
|
CYC
|
72.000
|
$9,758.000
|
$8,000.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
|
CYC
|
72.000
|
$3,900.000
|
$3,391.600
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
72.000
|
$6,935.000
|
$8,000.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
|
CYC
|
72.000
|
$3,638.000
|
$4,000.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
|
CYC
|
72.000
|
$1,474.000
|
$1,838.930
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
72.000
|
$1,800.000
|
$2,679.520
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
|
CYC
|
72.000
|
$1,223.000
|
$1,819.450
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(3)
|
CYC
|
72.000
|
$568.000
|
$844.440
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
5,000.000
|
$2.000
|
$1.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
5,000.000
|
$3.000
|
$1.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
5,000.000
|
$2.000
|
$1.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
15.000
|
$3,200.000
|
$1,500.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
100.000
|
$2,500.000
|
$1,000.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
250.000
|
$85.000
|
$200.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
50.000
|
$100.000
|
$200.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
50.000
|
$165.000
|
$200.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
50.000
|
$290.000
|
$200.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
50.000
|
$350.000
|
$200.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
50.000
|
$400.000
|
$200.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
50.000
|
$500.000
|
$200.000
|
|
|
STUMP REMOVAL
|
EA
|
50.000
|
$100.000
|
$50.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
25,000.000
|
$8.000
|
$6.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
250.000
|
$370.000
|
$200.000
|
|
|
STORM SEWER CLEANING (PIPE) (<12" DIA)
|
LF
|
1,000.000
|
$4.000
|
$15.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
1,000.000
|
$11.000
|
$15.000
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
1,000.000
|
$9.000
|
$15.000
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
1,000.000
|
$7.000
|
$15.000
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
1,000.000
|
$15.000
|
$15.000
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
1,000.000
|
$11.000
|
$15.000
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
1,000.000
|
$17.000
|
$15.000
|
|
|
STORM SEWER CLEANING (PIPE)(55"-74"DIA)
|
LF
|
1,000.000
|
$22.000
|
$15.000
|
|
|
STORM SEWER CLEANING (PIPE)(75"-96"DIA)
|
LF
|
1,000.000
|
$30.000
|
$15.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (<6 SF)
|
LF
|
1,000.000
|
$11.000
|
$90.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
1,000.000
|
$13.000
|
$90.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
1,000.000
|
$15.000
|
$90.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
1,000.000
|
$21.000
|
$90.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
|
LF
|
3,000.000
|
$18.000
|
$90.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (>96 SF)
|
LF
|
3,000.000
|
$38.000
|
$90.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
1,000.000
|
$25.000
|
$90.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
100.000
|
$80.000
|
$90.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
500.000
|
$180.000
|
$150.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
20.000
|
$125.000
|
$133.670
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
100.000
|
$180.000
|
$216.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
200.000
|
$75.000
|
$5.500
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
1,000.000
|
$125.000
|
$1.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
10.000
|
$1,100.000
|
$1,500.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
50.000
|
$1,700.000
|
$2,500.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
1,000.000
|
$6.000
|
$4.000
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
5,000.000
|
$15.000
|
$5.380
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
200.000
|
$200.000
|
$1.000
|
|
|
REPLACE POST HARDWARE (TL-4)
|
EA
|
1,000.000
|
$27.000
|
$37.500
|
|
|
REPLACE POSTS (TL-3)(FURN)
|
EA
|
200.000
|
$100.000
|
$80.000
|
|
|
REPLACE POSTS (TL-4)(FURN)
|
EA
|
1,000.000
|
$100.000
|
$100.000
|
|
|
REP OR REPLC CAB BAR TM SEC TL-3(FURN)
|
EA
|
20.000
|
$300.000
|
$40.000
|
|
|
REP OR REPLC CAB BAR TM SEC TL-4(FURN)
|
EA
|
100.000
|
$300.000
|
$100.000
|
|
|
REPLACE POST HARDWARE (TL-3)
|
EA
|
200.000
|
$15.000
|
$40.000
|
|
|
REPLACE CCT POST (5 FT 3 IN)
|
EA
|
20.000
|
$175.000
|
$202.000
|
|
|
REPLACE CCT POST (5 FT 11 IN)
|
EA
|
100.000
|
$175.000
|
$202.000
|
|
|
REMOVE AND REPLACE (WIDE TRACC)
|
EA
|
25.000
|
$13,000.000
|
$1.000
|
|
|
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
|
EA
|
20.000
|
$500.000
|
$20.000
|
|
|
REPAIR (ALUMINUM RAIL)
|
LF
|
1,500.000
|
$225.000
|
$300.000
|
|
|
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
|
LF
|
1,000.000
|
$2,650.000
|
$125.000
|
|
|
RAISING AND UNDERSEALING CONCRETE SLAB
|
LB
|
25,000.000
|
$6.000
|
$5.000
|
|
|
REMOVE ROADWAY ILLUM ASSEMBLY (HPS)
|
EA
|
50.000
|
$400.000
|
$500.000
|
|
|
INSTALL ROADWAY ILLUM ASSEMBLY (LED)
|
EA
|
50.000
|
$810.000
|
$6,000.000
|
|
|
REPLACE ROADWAY ILLUM ASSEMBLY (LED)
|
EA
|
30.000
|
$2,270.000
|
$3,000.000
|
|
|
TROUBLESHOOT FOR REPAIRS
|
HR
|
50.000
|
$120.000
|
$175.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
300.000
|
$115.000
|
$50.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
100,000.000
|
$1.000
|
$0.710
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
50,000.000
|
$1.000
|
$0.770
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
10,000.000
|
$2.000
|
$1.380
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
100,000.000
|
$1.000
|
$0.710
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
30.000
|
$2,000.000
|
$2,500.000
|
|
|
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
30.000
|
$1,240.000
|
$2,500.000
|
|
|
REMV LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
100.000
|
$560.000
|
$300.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
1,000.000
|
$370.000
|
$800.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
1,000.000
|
$265.000
|
$800.000
|
|
|
REMV SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
1,000.000
|
$145.000
|
$800.000
|
|
|
TMA (STATIONARY)
|
DAY
|
3,000.000
|
$230.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
10,000.000
|
$85.000
|
$1.000
|
|
|
INCIDENT MANAGEMENT (TYPE A)
|
HR
|
100.000
|
$100.000
|
$300.000
|
|
|
INCIDENT MANAGEMENT (TYPE B)
|
HR
|
100.000
|
$140.000
|
$300.000
|
|
|
INCIDENT MANAGEMENT (TYPE C)
|
HR
|
100.000
|
$50.000
|
$300.000
|
|
|
INCIDENT MANAGEMENT (TYPE D)
|
HR
|
100.000
|
$50.000
|
$300.000
|
|
|
INCIDENT MANAGEMENT (TYPE E)
|
HR
|
100.000
|
$140.000
|
$500.000
|
|
|
INCIDENT MANAGEMENT (TYPE F)
|
HR
|
100.000
|
$90.000
|
$200.000
|
|
|
INCIDENT MANAGEMENT (TYPE G)
|
HR
|
100.000
|
$90.000
|
$300.000
|
|
|
INCIDENT MANAGEMENT (TYPE H)
|
HR
|
100.000
|
$95.000
|
$300.000
|
|
|
INCIDENT MANAGEMENT (TYPE I)
|
HR
|
100.000
|
$75.000
|
$300.000
|
|
|
INCIDENT MANAGEMENT (TYPE J)
|
HR
|
100.000
|
$40.000
|
$300.000
|
|
|
MOBILE RETROREFLECTIVITY DATA COLLECT
|
MI
|
1,000.000
|
$250.000
|
$17.250
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
CY
|
2,000.000
|
$190.000
|
$49.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
3,000.000
|
$100.000
|
$150.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
3,000.000
|
$50.000
|
$50.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
3,000.000
|
$100.000
|
$100.000
|
|
|
SNOW AND ICE CONTROL (BLADE)
|
HR
|
200.000
|
$175.000
|
$100.000
|
|
Totals: |
$38,599,454.000
|
$39,982,738.020
|