Show Job Controls
Bid Cobra

BELL US0190 (6350-96-001)

Items: 68

County: BELL
Length: N/A
Highway: US0190
District: WACO
Control Number: 6350-96-001
DBE Goal: N/A
Project: RMC - 635096001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $851,073.00
Date: 11/06/2019 (6 years ago)
Contract Number: N/A
Type: MBGF,CABLE BARRIER & BRDG RAIL REPR/INST
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$851,073.00
$849,325.00
Over/Under Est: -0.21% -$1,748.00

Bid Items & Bid Tabulations

68 Total 0 of 68
BELL  |  US0190  |  WACO  |  6350-96-001  |  11/06/2019  |  $851,073.00  |  RMC - 635096001  |  MBGF,CABLE BARRIER & BRDG RAIL REPR/...  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 75.000 $20.000 $20.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 25.000 $130.000 $50.000
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $300.000 $400.000
RAIL (HANDRAIL)(DECORATIVE)
LF 30.000 $150.000 $100.000
MOBILIZATION (CALLOUT)
EA 12.000 $5,149.000 $100.000
MOBILIZATION (EMERGENCY)
EA 60.000 $258.000 $100.000
CONC CURB (TY II)
LF 100.000 $15.000 $25.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $23.000 $24.000
MTL W-BEAM GD FEN (STEEL POST)
LF 5,000.000 $24.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,600.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,100.000 $1,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $25.000 $25.000
MTL BM GD FEN TRANS (NON - SYM)
EA 20.000 $600.000 $25.000
REMOVE METAL BEAM GUARD FENCE
LF 1,500.000 $2.500 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $200.000 $100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $200.000 $100.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 50.000 $3,500.000 $3,300.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $100.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $11,000.000 $11,000.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 5.000 $60.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 20.000 $20.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $35.000 $30.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,000.000 $20.000 $24.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $22.000 $20.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $24.000 $20.000
RAISE RAIL ELEMENT
LF 150.000 $3.000 $4.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 75.000 $50.000 $60.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 25.000 $60.000 $60.000
REALIGN POSTS
EA 200.000 $10.000 $10.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $10.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 400.000 $25.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 10.000 $50.000 $70.000
REPLACE HINGED TOP SGT STEEL POST
EA 50.000 $70.000 $70.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 35.000 $3,500.000 $3,300.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,000.000 $900.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $70.000 $50.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $65.000 $1.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $50.000 $1.000
REPLACE SGT STRUT
EA 2.000 $60.000 $1.000
REPLACE SGT OBJECT MARKER
EA 1.000 $40.000 $50.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 500.000 $10.000 $24.000
REPLACE POSTS (TL-4)
EA 310.000 $145.000 $160.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $200.000 $1.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 1.000 $50.000 $1.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $700.000 $1,500.000
REPLACE CABLE (TL-4)
LF 500.000 $1.000 $1.000
CHECK / RE-TENSION CABLE
EA 20.000 $100.000 $100.000
POST AND CABLE FENCE (REMOVAL)
LF 100.000 $1.000 $1.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 400.000 $6.000 $10.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 5.000 $10.000 $10.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 10.000 $25.000 $400.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 250.000 $1.000 $4.000
REMOVE AND REPLACE (FASTRACC)
EA 3.000 $15,000.000 $20,000.000
REMOVE AND REPLACE (SHORTRACC)
EA 1.000 $12,000.000 $12,000.000
REPAIR (FASTRACC) (BAY)
EA 14.000 $700.000 $300.000
REPAIR (SHORTRACC) (BAY)
EA 4.000 $700.000 $300.000
REMOVE & REPLACE TRACC (TXDOT FURNISHD)
EA 10.000 $2,200.000 $4,000.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 20.000 $65.000 $100.000
REP METAL POST W/ BASE PLATE(T4(A)RAIL
EA 20.000 $80.000 $200.000
REP METAL POST W/ BASE PLATE (T6 RAIL)
EA 4.000 $80.000 $50.000
REPAIR (TY T101RC)
LF 20.000 $40.000 $20.000
REPAIR (TY T1 - 101R)
LF 40.000 $100.000 $20.000
REP METAL PST W/ BASE PLATE (TY T101RC)
EA 2.000 $80.000 $100.000
REP METAL PST W/ BASE PLATE(TY T1-101R)
EA 2.000 $80.000 $100.000
REPAIR (ALUMINUM RAIL)
LF 10.000 $50.000 $100.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 50.000 $40.000 $100.000
REPAIR (W-BEAM - T101 RAIL)
LF 2.000 $40.000 $50.000
TMA (STATIONARY)
DAY 120.000 $150.000 $200.000
Totals: $851,073.000 $849,325.000