Show Job Controls
Bid Cobra

BELL US0190 (6312-45-001)

Items: 62

County: BELL
Length: N/A
Highway: US0190
District: WACO
Control Number: 6312-45-001
DBE Goal: N/A
Project: RMC - 631245001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $555,670.00
Date: 01/05/2017 (9 years ago)
Contract Number: N/A
Type: MBGF,CABLE BARRIER & BRIDGE RAIL REP/INT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$555,670.00
$469,792.50
Over/Under Est: -15.45% -$85,877.50
$813,221.04
Over/Under Est: 46.35% $257,551.04
Amt Left: 73.1% $343,428.54

Bid Items & Bid Tabulations

62 Total 0 of 62
BELL  |  US0190  |  WACO  |  6312-45-001  |  01/05/2017  |  $555,670.00  |  RMC - 631245001  |  MBGF,CABLE BARRIER & BRIDGE RAIL REP...  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T & L CLEANING SERVICES
DBI SERVICES, LLC
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 150.000 $25.000 $10.000 $63.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 45.000 $90.000 $50.000 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 100.000 $350.000 $50.000 $694.510
RAIL (HANDRAIL)(DECORATIVE)
LF 30.000 $150.000 $100.000 $63.000
MOBILIZATION (CALLOUT)
EA 24.000 $1,684.000 $100.000 $250.000
MOBILIZATION (EMERGENCY)
EA 4.000 $2,526.000 $100.000 $1,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $20.000 $16.000 $25.690
MTL W-BEAM GD FEN (STEEL POST)
LF 2,500.000 $23.000 $23.000 $28.210
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,500.000 $1,500.000 $2,100.920
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,000.000 $900.000 $1,926.540
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $20.000 $20.000 $30.770
MTL BM GD FEN TRANS (NON - SYM)
EA 20.000 $600.000 $500.000 $595.480
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $2.500 $2.000 $4.930
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $180.000 $100.000 $985.820
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $180.000 $100.000 $739.370
GDRAIL END TRT(INSTALL)(HBA POST)
EA 55.000 $2,300.000 $2,400.000 $3,173.440
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $700.000 $1,000.000 $1,478.740
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $11,000.000 $10,050.000 $15,809.470
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 5.000 $40.000 $1.000 $84.290
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 40.000 $17.500 $20.000 $29.360
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 40.000 $25.000 $20.000 $31.880
REPAIR RAIL ELEMENT (W - BEAM)
LF 660.000 $15.000 $16.000 $25.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $20.000 $20.000 $62.710
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 5.000 $20.000 $1.000 $121.970
RAISE RAIL ELEMENT
LF 300.000 $3.000 $2.000 $9.860
REM / REPL TIMBER/STL POST W/O CONC FND
EA 120.000 $40.000 $50.000 $102.310
REM / REPL TIMBER / STL POST W/CONC FND
EA 5.000 $50.000 $100.000 $441.760
REALIGN POSTS
EA 200.000 $20.000 $10.000 $41.080
REMOVE & REPLACE BLOCKOUT
EA 235.000 $10.000 $10.000 $30.620
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 800.000 $12.000 $20.000 $29.660
REPLACE SINGLE GDRAIL TERMINAL POST
EA 20.000 $50.000 $60.000 $152.210
REPLACE HINGED TOP SGT STEEL POST
EA 75.000 $60.000 $60.000 $182.450
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 35.000 $2,500.000 $2,400.000 $3,173.440
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $800.000 $800.000 $954.580
REM & RESET SGT IMPACT HEAD
EA 25.000 $100.000 $100.000 $739.370
REPLACE SGT CABLE ASSEMBLY
EA 15.000 $65.000 $1.000 $273.040
REPLACE SGT CABLE ANCHOR
EA 15.000 $85.000 $1.000 $250.360
REPLACE SGT STRUT
EA 2.000 $70.000 $1.000 $254.270
REPLACE SGT OBJECT MARKER
EA 1.000 $25.000 $50.000 $45.740
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 1,000.000 $8.000 $8.000 $9.860
REPLACE POSTS (TL-4)
EA 305.000 $75.000 $90.000 $106.600
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $90.000 $1.000 $126.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 1.000 $250.000 $1.000 $630.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $400.000 $500.000 $756.000
REPLACE CABLE (TL-4)
LF 1,000.000 $3.000 $0.500 $4.420
CHECK / RE-TENSION CABLE
EA 30.000 $150.000 $1.000 $133.810
POST AND CABLE FENCE (REMOVAL)
LF 100.000 $3.000 $1.000 $61.610
POST AND CABLE FENCE (NEW INSTALLATION)
LF 165.000 $10.000 $5.000 $25.200
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 5.000 $80.000 $10.000 $25.200
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 15.000 $40.000 $20.000 $123.230
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 525.000 $4.000 $0.500 $31.500
REMOVE AND REPLACE (TRACC)
EA 2.000 $10,000.000 $11,000.000 $15,987.640
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 1.000 $50.000 $200.000 $138.600
REP METAL POST W/ BASE PLATE(T4(A)RAIL
EA 1.000 $40.000 $200.000 $275.690
REP METAL POST W/ BASE PLATE (T6 RAIL)
EA 1.000 $150.000 $500.000 $275.690
REPAIR (TY T101RC)
LF 1.000 $40.000 $50.000 $25.200
REPAIR (TY T1 - 101R)
LF 1.000 $100.000 $50.000 $63.000
REP METAL PST W/ BASE PLATE (TY T101RC)
EA 1.000 $100.000 $200.000 $63.000
REP METAL PST W/ BASE PLATE(TY T1-101R)
EA 2.000 $100.000 $200.000 $63.000
REPAIR (ALUMINUM RAIL)
LF 10.000 $50.000 $100.000 $630.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 100.000 $40.000 $30.000 $56.700
REPAIR (W-BEAM - T101 RAIL)
LF 2.000 $20.000 $60.000 $25.200
Totals: $555,670.000 $469,792.500 $813,221.040