BELL SH 201 (3534-01-012)

Items: 54

County: BELL
Length: N/A
Highway: SH 201
District: WACO
Control Number: 3534-01-012
DBE Goal: N/A
Project: F 2022(434)
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $2,433,698.66
Date: 04/06/2022 (4 years ago)
Contract Number: N/A
Type: MILL AND INLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$2,433,698.66
$1,874,463.14
Over/Under Est: -22.98% -$559,235.52
Over/Under Est: -11.65% -$283,451.67
Amt Left: 14.71% $275,783.85
Over/Under Est: -10.61% -$258,134.21
Amt Left: 16.06% $301,101.31
Delta: -1.18% -$25,317.46
Over/Under Est: -1.8% -$43,697.70
Amt Left: 27.5% $515,537.82
Delta: -9.86% -$214,436.51

Bid Items & Bid Tabulations

54 Total 0 of 54
BELL  |  SH 201  |  WACO  |  3534-01-012  |  04/06/2022  |  $2,433,698.66  |  F 2022(434)  |  MILL AND INLAY  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONE STAR PAVING COMPANY
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
REMOVING CONC (MEDIANS)
SY 9.000 $30.000 $50.000 $220.000 $250.000 $59.500
REMOVING CONC (CURB AND GUTTER)
LF 100.000 $10.000 $25.000 $55.000 $25.000 $29.750
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,200.000 $55.000 $95.000 $68.000 $82.000 $110.000
PLANE ASPH CONC PAV(1.5" MICRO-MILLING)
SY 85,447.000 $9.500 $0.650 $2.100 $2.000 $2.250
CL C CONC (RAIL FOUNDATION)
CY 13.800 $400.000 $2,500.000 $1,900.000 $1,200.000 $2,976.000
RIPRAP (MOW STRIP)(4 IN)
CY 83.000 $500.000 $750.000 $700.000 $550.000 $892.800
RETROFIT RAIL (TY T551)
LF 148.000 $180.000 $450.000 $273.000 $200.000 $535.700
MOBILIZATION
LS 1.000 $120,000.000 $109,000.000 $199,360.000 $210,000.000 $239,120.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $10,500.000 $3,600.000 $14,000.000 $3,500.000 $6,620.000
CONC CURB & GUTTER (TY I)
LF 100.000 $35.000 $100.000 $90.000 $100.000 $119.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,350.000 $26.250 $34.600 $34.620 $45.000 $36.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,900.000 $2,790.000 $3,190.590 $3,400.000 $4,208.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $1,200.000 $1,465.000 $1,462.390 $1,500.000 $1,260.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,250.000 $1,570.000 $1,570.220 $1,700.000 $1,506.000
REMOVE METAL BEAM GUARD FENCE
LF 1,288.000 $2.600 $1.750 $1.750 $2.500 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $190.000 $300.000 $300.000 $330.000 $240.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,800.000 $3,620.000 $3,620.910 $4,000.000 $3,720.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $260.000 $215.000 $213.160 $250.000 $240.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 30.000 $28.000 $42.000 $41.630 $50.000 $47.000
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 28.000 $0.520 $45.000 $45.000 $10.000 $59.500
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 28.000 $1.400 $45.000 $45.000 $10.000 $59.500
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 5.000 $10.250 $75.000 $75.000 $120.000 $240.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,826.000 $1.010 $1.000 $1.000 $1.500 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,702.000 $1.010 $1.000 $1.000 $1.500 $1.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 84.000 $0.990 $1.000 $1.000 $1.100 $3.200
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 90.000 $1.020 $1.000 $1.000 $1.100 $3.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,410.000 $0.810 $0.900 $0.900 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,602.000 $6.600 $7.750 $7.770 $9.000 $8.350
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 2.000 $430.000 $300.000 $300.000 $330.000 $595.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,710.000 $0.400 $0.400 $0.370 $0.400 $0.710
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,833.000 $0.530 $0.350 $0.350 $0.400 $0.830
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,240.000 $0.200 $0.360 $0.360 $0.400 $0.710
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 23,802.000 $0.300 $0.360 $0.360 $0.400 $0.560
PREFAB PAV MRK TY C (W) (ARROW)
EA 24.000 $210.000 $240.000 $240.000 $265.000 $251.000
PREFAB PAV MRK TY C (W) (WORD)
EA 24.000 $265.000 $300.000 $300.000 $330.000 $278.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 20.000 $35.000 $36.000 $36.000 $40.000 $68.000
REFL PAV MRKR TY I-C
EA 452.000 $3.800 $3.650 $3.650 $4.000 $5.950
REFL PAV MRKR TY II-A-A
EA 750.000 $3.300 $3.550 $3.550 $4.000 $5.950
ELIM EXT PAV MRK & MRKS (4")
LF 28.000 $1.020 $10.000 $20.000 $20.000 $60.000
PAV SURF PREP FOR MRK (4")
LF 6,089.000 $0.080 $0.020 $0.020 $0.050 $0.300
PAV SURF PREP FOR MRK (8")
LF 1,062.000 $0.120 $0.020 $0.020 $0.050 $0.600
PAV SURF PREP FOR MRK (24")
LF 270.000 $0.950 $0.050 $0.050 $0.050 $2.400
PAV SURF PREP FOR MRK (ARROW)
EA 9.000 $18.000 $15.000 $15.000 $17.000 $60.000
PAV SURF PREP FOR MRK (WORD)
EA 9.000 $22.500 $15.000 $15.000 $17.000 $60.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 10.000 $9.000 $15.000 $15.000 $17.000 $30.000
PAV SURF PREP FOR MRK (MED NOSE)
EA 1.000 $75.000 $15.000 $15.000 $17.000 $180.000
STONE-MTRX-ASPH SMA-F SAC-A PG76-22
TON 7,050.000 $152.000 $160.000 $180.000 $170.000 $165.650
UNDERSEAL COURSE
GAL 21,362.000 $3.050 $3.300 $0.010 $4.500 $5.800
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 42.000 $120.000 $350.000 $110.000 $125.000 $297.600
TMA (STATIONARY)
DAY 76.000 $160.000 $140.000 $300.000 $150.000 $623.550
TMA (MOBILE OPERATION)
HR 300.000 $30.000 $50.000 $25.000 $175.000 $97.500
VIVDS PROSR SYS
EA 1.000 $7,000.000 $9,500.000 $9,500.000 $17,000.000 $14,500.000
VIVDS CAM ASSY FXD LNS
EA 4.000 $2,500.000 $2,900.000 $2,900.000 $5,000.000 $3,455.000
VIVDS CABLING
LF 1,542.000 $4.700 $4.000 $4.000 $7.000 $4.750
Totals: $2,433,698.660 $1,874,463.140 $2,150,246.990 $2,175,564.450 $2,390,000.960