Show Job Controls
Bid Cobra

BELL FM 2115 (2038-01-031)

Items: 101

County: BELL
Length: N/A
Highway: FM 2115
District: WACO
Control Number: 2038-01-031
DBE Goal: N/A
Project: C 2038-1-31
Guaranty: N/A
Time: 105 WORKING DAYS
Engineer's Estimate: $6,908,139.15
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: REHABILITATE AND WIDEN SHOULDERS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$6,908,139.15
$7,148,926.48
Over/Under Est: 3.49% $240,787.33
Over/Under Est: 12.73% $879,205.96
Amt Left: 8.93% $638,418.63
Over/Under Est: 15.37% $1,062,069.19
Amt Left: 11.49% $821,281.86
Delta: -2.35% -$182,863.23
$8,530,401.80
Over/Under Est: 23.48% $1,622,262.65
Amt Left: 19.32% $1,381,475.32
Delta: -7.03% -$560,193.46

Bid Items & Bid Tabulations

101 Total 0 of 101
BELL  |  FM 2115  |  WACO  |  2038-01-031  |  02/04/2022  |  $6,908,139.15  |  C 2038-1-31  |  REHAB AND WIDEN SHOULDERS  |  105 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
MP HEAVY CONSTRUCTION INC
DAN WILLIAMS COMPANY
PREPARING ROW
STA 15.000 $3,000.000 $5,000.000 $5,000.000 $4,447.940 $22,000.000
REMOVING CONCRETE(MOW STRIP)
LF 753.000 $13.000 $9.000 $10.000 $8.290 $5.000
EXCAVATION (ROADWAY)
CY 7,472.000 $10.000 $8.200 $10.000 $11.410 $16.000
SUBGRADE WIDENING (ORD COMP)
STA 305.000 $380.000 $350.000 $500.000 $424.270 $175.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 18,351.000 $9.000 $10.000 $15.000 $13.180 $25.000
FURNISHING AND PLACING TOPSOIL (4")
SY 180,418.000 $0.900 $0.010 $0.500 $0.930 $0.850
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 180,418.000 $0.150 $0.010 $0.150 $0.140 $0.110
DRILL SEED (TEMP)(WARM OR COOL)
SY 180,418.000 $0.120 $0.010 $0.100 $0.110 $0.090
VEGETATIVE WATERING
MG 2,937.000 $20.000 $0.010 $10.000 $35.820 $10.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 2,500.000 $1.000 $1.100 $1.500 $1.370 $2.000
PROOF ROLLING
HR 48.000 $100.000 $120.000 $120.000 $119.120 $50.000
FL BS (RDWY DEL)(TY D GR 5)(FNAL POS)
CY 13,656.000 $41.000 $25.000 $45.000 $42.880 $32.000
REWORK BS MTL (TY C)(12")(ORD COMP)
SY 74,050.000 $2.500 $1.200 $2.000 $1.840 $1.950
FOG SEAL (SS-1)
GAL 10,835.000 $3.000 $3.500 $4.500 $3.010 $3.000
CEM STABIL BKFL
CY 451.000 $130.000 $175.000 $130.000 $131.170 $175.000
CUT & RESTORING PAV
SY 336.000 $84.000 $120.000 $75.000 $101.960 $100.000
TRENCH EXCAVATION PROTECTION
LF 221.000 $2.000 $1.000 $15.000 $5.620 $1.000
TEMPORARY SPL SHORING
SF 5,782.000 $20.000 $45.000 $25.000 $28.950 $20.000
RIPRAP (CONC)(5 IN)
CY 275.000 $420.000 $535.000 $500.000 $500.400 $430.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 446.000 $120.000 $160.000 $200.000 $237.030 $105.000
RIPRAP (MOW STRIP)(4 IN)
CY 198.000 $450.000 $510.000 $550.000 $579.410 $575.000
CONC BOX CULV (5 FT X 3 FT)
LF 104.000 $300.000 $540.000 $400.000 $453.440 $450.000
CONC BOX CULV (6 FT X 3 FT)
LF 136.000 $375.000 $710.000 $460.000 $427.750 $435.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 60.000 $650.000 $725.000 $520.000 $840.060 $925.000
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
LF 39.000 $750.000 $1,070.000 $680.000 $1,404.620 $1,150.000
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
LF 94.000 $900.000 $1,050.000 $700.000 $1,191.070 $1,300.000
CONC BOX CULV (10 FT X 9 FT)(EXTEND)
LF 28.000 $800.000 $1,900.000 $1,800.000 $3,275.770 $1,750.000
RC PIPE (CL III)(18 IN)
LF 968.000 $60.000 $0.000 $0.000 $0.000 $0.000
RC PIPE (CL III)(24 IN)
LF 310.000 $84.000 $61.000 $110.000 $84.350 $78.000
RC PIPE (CL III)(30 IN)
LF 300.000 $108.000 $85.000 $120.000 $103.180 $92.000
RC PIPE (CL III)(36 IN)
LF 261.000 $108.000 $125.000 $140.000 $140.530 $115.000
RC PIPE (CL III) (24 IN) (ALT)
LF 280.000 $84.000 $0.000 $0.000 $0.000 $0.000
RC PIPE (CL III) (30 IN) (ALT)
LF 168.000 $108.000 $0.000 $0.000 $0.000 $0.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 3.000 $4,750.000 $4,400.000 $3,500.000 $5,947.490 $3,000.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $7,100.000 $6,050.000 $4,000.000 $8,855.800 $3,500.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $7,500.000 $8,600.000 $7,000.000 $7,988.870 $6,000.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $43,000.000 $41,000.000 $53,000.000 $49,754.880 $50,000.000
WINGWALL (PW - 1) (HW=11 FT)
EA 1.000 $58,000.000 $37,000.000 $47,000.000 $56,374.840 $40,000.000
WINGWALL (PW - 1) (HW=13 FT)
EA 2.000 $90,000.000 $65,000.000 $84,000.000 $59,928.840 $85,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $8,500.000 $7,000.000 $8,100.000 $11,774.630 $7,250.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $12,500.000 $10,500.000 $12,000.000 $17,113.890 $11,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $15,000.000 $19,000.000 $23,000.000 $21,558.430 $22,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $15,000.000 $21,000.000 $25,000.000 $23,577.550 $22,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 3.000 $24,000.000 $31,000.000 $37,000.000 $45,148.500 $35,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 4.000 $9,000.000 $6,150.000 $7,500.000 $10,117.680 $12,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 60.000 $900.000 $945.000 $1,000.000 $1,139.850 $1,350.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 6.000 $1,300.000 $960.000 $1,100.000 $1,583.360 $1,450.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 16.000 $1,450.000 $1,200.000 $1,200.000 $1,980.510 $1,650.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 9.000 $1,700.000 $1,875.000 $1,700.000 $2,391.370 $2,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 1.000 $2,500.000 $1,975.000 $1,800.000 $3,265.740 $2,400.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 14.000 $2,250.000 $2,275.000 $2,100.000 $3,260.010 $3,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 7.000 $2,700.000 $3,000.000 $2,300.000 $4,602.870 $3,400.000
REMOV STR (PIPE)
LF 2,310.000 $15.000 $8.000 $10.000 $23.170 $18.000
MOBILIZATION
LS 1.000 $595,703.150 $647,500.000 $772,000.000 $659,168.100 $850,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $7,500.000 $35,000.000 $4,000.000 $9,198.710 $35,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 810.000 $30.000 $28.000 $25.000 $36.150 $35.000
ROCK FILTER DAMS (REMOVE)
LF 810.000 $9.500 $9.000 $5.000 $11.060 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 1,780.000 $30.000 $25.000 $25.000 $28.960 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 1,780.000 $10.000 $12.000 $5.000 $26.890 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,687.000 $3.000 $2.850 $3.000 $2.790 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,687.000 $0.700 $0.750 $0.500 $0.840 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 7.000 $4,500.000 $3,247.500 $5,000.000 $3,963.040 $4,000.000
INTERSECTIONS (ACP)
SY 2,404.000 $45.000 $39.000 $30.000 $67.430 $30.000
DRIVEWAYS (CONC)
SY 397.000 $85.000 $94.000 $100.000 $95.040 $80.000
DRIVEWAYS (ACP)
SY 4,994.000 $45.000 $34.000 $25.000 $28.970 $36.000
RUMBLE STRIPS (CENTERLINE)
LF 30,292.000 $0.250 $0.230 $0.300 $0.210 $0.200
MTL W-BEAM GD FEN (STEEL POST)
LF 2,287.500 $27.000 $27.750 $35.000 $29.230 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,200.000 $1,200.000 $1,500.000 $1,264.160 $1,250.000
REMOVE METAL BEAM GUARD FENCE
LF 612.500 $2.800 $2.500 $5.000 $2.630 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 19.000 $2,600.000 $2,750.000 $3,500.000 $2,897.030 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $280.000 $250.000 $500.000 $263.370 $255.000
WIRE FENCE (TY A)
LF 201.000 $15.000 $30.000 $25.000 $25.080 $20.000
WIRE FENCE (TY C)
LF 133.000 $8.500 $30.000 $35.000 $18.640 $26.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 18.000 $200.000 $250.000 $250.000 $242.300 $250.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 6.000 $210.000 $300.000 $300.000 $263.370 $260.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 5.000 $375.000 $500.000 $550.000 $521.470 $500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 37.000 $375.000 $400.000 $450.000 $461.420 $410.000
REMOVE SM RD SN SUP&AM
EA 37.000 $135.000 $150.000 $150.000 $105.350 $150.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 37.000 $200.000 $200.000 $250.000 $254.330 $240.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 31.000 $26.000 $18.750 $50.000 $19.750 $20.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 20.000 $100.000 $40.000 $100.000 $94.810 $40.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 4,457.000 $0.300 $0.230 $0.250 $0.420 $0.230
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 39,323.000 $0.250 $0.220 $0.240 $0.260 $0.220
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,310.000 $1.000 $1.030 $1.500 $0.730 $2.250
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 72.000 $6.800 $20.000 $25.000 $6.320 $20.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 60,783.000 $0.380 $0.360 $0.380 $0.530 $0.360
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,457.000 $0.400 $0.360 $0.380 $0.530 $0.360
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 39,323.000 $0.350 $0.360 $0.380 $0.530 $0.360
REFL PAV MRKR TY II-A-A
EA 724.000 $3.000 $4.600 $5.000 $3.580 $4.600
D-GR HMA TY-C SAC-B PG64-22
TON 13,962.000 $65.000 $95.000 $84.000 $75.550 $93.000
UNDERSEAL COURSE
GAL 25,389.000 $3.050 $0.010 $3.200 $3.230 $3.000
CEMENT
TON 1,017.000 $185.000 $176.000 $245.000 $165.390 $190.000
ASPHALT BINDER (PG 64-22)
TON 1,689.000 $470.000 $560.000 $650.000 $601.980 $625.000
FOAMED ASPHALT TREAT (10")(DC)
SY 108,271.000 $4.250 $3.250 $3.500 $4.010 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $75.000 $120.000 $150.000 $91.650 $110.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,000.000 $4,500.000 $10,000.000 $10,113.040 $8,500.000
TMA (STATIONARY)
DAY 24.000 $170.000 $275.000 $250.000 $266.530 $225.000
TMA (MOBILE OPERATION)
HR 312.000 $30.000 $25.000 $50.000 $137.870 $55.000
1
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 968.000 $60.000 $30.000 $50.000 $40.580 $43.000
2
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 280.000 $84.000 $41.000 $60.000 $64.550 $53.000
3
THERMOPLASTIC PIPE(30 IN)(PP)(TYPE III)
LF 168.000 $108.000 $60.000 $80.000 $86.940 $67.000
Totals: $7,007,883.150 $7,148,926.485 $7,787,345.110 $7,970,208.330 $8,530,401.800