Show Job Controls
Bid Cobra

BELL FM 1741 (1835-02-056)

Items: 82

County: BELL
Length: N/A
Highway: FM 1741
District: WACO
Control Number: 1835-02-056
DBE Goal: N/A
Project: STP 1902(272)
Guaranty: N/A
Time: 105 WORKING DAYS
Engineer's Estimate: $2,996,783.69
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: MILL/OVLY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,996,783.69
$3,284,016.20
Over/Under Est: 9.58% $287,232.51
Over/Under Est: 15.64% $468,696.71
Amt Left: 5.53% $181,464.20
Over/Under Est: 34.31% $1,028,127.41
Amt Left: 22.56% $740,894.90
Delta: -16.14% -$559,430.70

Bid Items & Bid Tabulations

82 Total 0 of 82
BELL  |  FM 1741  |  WACO  |  1835-02-056  |  08/07/2019  |  $2,996,783.69  |  STP 1902(272)  |  MILL/OVLY  |  105 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONE STAR PAVING COMPANY
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
REMOVING CONC (PAV)
SY 12.000 $5.460 $32.500 $175.000 $100.000
REMOVING CONC (RIPRAP)
SY 97.000 $18.000 $23.000 $16.000 $35.000
REMOVING CONC (RIPRAP)
CY 3.700 $96.000 $105.000 $413.000 $450.000
REMOVING CONC (DRIVEWAYS)
SY 294.000 $15.000 $29.500 $37.000 $50.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 91.000 $10.000 $8.000 $26.000 $30.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 25.000 $12.000 $25.000 $22.000 $50.000
EXCAVATION (SPECIAL)
CY 50.000 $10.000 $44.000 $40.000 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 50.000 $15.000 $55.000 $65.000 $40.000
FURNISHING AND PLACING TOPSOIL (4")
SY 672.000 $3.700 $11.500 $7.050 $2.000
BLOCK SODDING
SY 672.000 $4.200 $10.000 $5.000 $10.000
VEGETATIVE WATERING
MG 5.500 $12.000 $50.000 $250.000 $20.000
D-GR HMA(SQ) TY-C PG76-22
TON 12.000 $162.000 $195.000 $260.000 $200.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 13,882.000 $110.000 $128.000 $140.000 $135.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 10,800.000 $40.000 $57.000 $45.000 $65.000
PLANE ASPH CONC PAV(0" TO 4")
SY 62.000 $12.000 $3.000 $14.000 $6.500
PLANE ASPH CONC PAV(2" TO 4")
SY 126,166.000 $2.000 $1.250 $1.550 $3.250
CONC PAV (JOINT REINF) (10")
SY 12.000 $61.000 $262.000 $150.000 $1,000.000
CL A CONC (MISC)
CY 5.000 $666.000 $820.000 $750.000 $700.000
CL B CONC (FLUME)
CY 4.100 $475.000 $795.000 $750.000 $700.000
CL C CONC (MISC)
CY 1.400 $992.000 $920.000 $750.000 $700.000
RIPRAP (CONC)(4 IN)
CY 1.600 $445.000 $582.000 $750.000 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 62.000 $490.000 $485.000 $475.000 $525.000
CLEANING AND SEALING EXISTING JOINTS
LF 106.000 $75.580 $99.000 $148.000 $200.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 1.000 $5,886.000 $15,670.000 $5,500.000 $20,000.000
GRATE & FRAME
EA 6.000 $1,460.000 $950.000 $850.000 $1,750.000
ADJUSTING MANHOLES
EA 2.000 $960.000 $450.000 $1,000.000 $2,000.000
ADJUSTING MANHOLES (WATER METER)
EA 1.000 $600.000 $420.000 $1,000.000 $750.000
MOBILIZATION
LS 1.000 $300,000.000 $120,000.000 $304,600.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $5,000.000 $20,150.000 $7,500.000 $5,000.000
SANDBAGS FOR EROSION CONTROL
EA 500.000 $13.000 $8.000 $7.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 500.000 $2.850 $5.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 500.000 $0.630 $2.000 $1.000 $2.000
CONC CURB (TY II)
LF 24.000 $25.000 $25.000 $66.000 $40.000
CONC CURB & GUTTER (TY II)
LF 80.000 $17.000 $31.000 $45.000 $50.000
DRIVEWAYS (CONC)
SY 329.000 $75.000 $154.000 $87.810 $115.000
CONC SIDEWALKS (4")
SY 1,162.000 $50.000 $77.000 $62.630 $40.000
CONC SIDEWALKS (5")
SY 75.000 $51.000 $80.000 $81.030 $50.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,175.000 $29.000 $22.000 $22.060 $30.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,100.000 $1,086.000 $1,086.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,175.000 $2.600 $1.500 $1.500 $7.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $217.000 $150.000 $150.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,724.000 $2,883.000 $2,883.000 $3,500.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 2.000 $284.000 $250.000 $256.000 $300.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $464.000 $500.000 $603.000 $750.000
RELOCATE SM RD SN SUP&AM TY S80
EA 5.000 $523.000 $600.000 $671.000 $800.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 55.000 $37.000 $26.000 $25.950 $40.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,001.000 $0.980 $0.500 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,718.000 $0.740 $0.500 $1.000 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,570.000 $1.650 $0.800 $1.000 $0.800
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,816.000 $0.770 $0.800 $0.800 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,118.000 $5.630 $6.000 $5.500 $6.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 235.000 $5.510 $6.000 $5.500 $6.000
PAVEMENT SEALER 4"
LF 8,316.000 $0.180 $0.150 $0.200 $0.150
PAVEMENT SEALER 8"
LF 2,377.000 $0.620 $0.300 $0.300 $0.300
PAVEMENT SEALER 24"
LF 330.000 $1.910 $2.500 $2.000 $2.500
PAVEMENT SEALER (ARROW)
EA 7.000 $33.060 $55.000 $40.000 $55.000
PAVEMENT SEALER (WORD)
EA 7.000 $39.450 $65.000 $80.000 $65.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 38,997.000 $0.300 $0.350 $0.440 $0.340
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 15,828.000 $0.300 $0.350 $0.440 $0.340
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 33,135.000 $0.300 $0.350 $0.400 $0.340
PREFAB PAV MRK TY C (W) (ARROW)
EA 43.000 $210.130 $225.000 $185.000 $225.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 16.000 $344.980 $400.000 $320.000 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 43.000 $275.000 $275.000 $235.000 $275.000
REFL PAV MRKR TY I-C
EA 869.000 $3.870 $3.200 $3.800 $3.200
REFL PAV MRKR TY II-A-A
EA 810.000 $3.750 $3.200 $3.800 $3.200
ELIM EXT PAV MRK & MRKS (4")
LF 8,316.000 $0.570 $1.000 $0.500 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 2,377.000 $0.960 $1.000 $0.750 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 330.000 $6.360 $3.000 $3.000 $3.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 7.000 $150.000 $28.000 $100.000 $28.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 7.000 $150.000 $29.000 $150.000 $29.000
PED DETECT PUSH BUTTON (STANDARD)
EA 1.000 $314.000 $400.000 $400.000 $500.000
INSTALL OF VEHICLE DETECTORS
LF 125.000 $0.780 $28.000 $28.000 $30.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 1.000 $105.000 $150.000 $150.000 $250.000
MEMBRANE UNDERSEAL
GAL 31,546.000 $2.780 $2.400 $2.800 $3.850
RETROFIT DET WARN SURF(SURF APPLIED)
EA 2.000 $291.000 $200.000 $500.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,000.000 $5,000.000 $5,000.000 $10,000.000
VIVDS PROCESSOR SYSTEM
EA 1.000 $8,300.000 $4,500.000 $4,500.000 $6,500.000
VIVDS CAMERA ASSEMBLY
EA 2.000 $2,400.000 $1,800.000 $1,800.000 $2,000.000
VIVDS SET-UP SYSTEM
EA 1.000 $595.570 $300.000 $300.000 $500.000
VIVDS COMMUNICATION CABLE (COAXIAL)
LF 350.000 $7.000 $8.000 $8.000 $12.000
TMA (STATIONARY)
DAY 10.000 $150.000 $185.000 $310.000 $250.000
TMA (MOBILE OPERATION)
HR 240.000 $45.000 $35.000 $20.000 $100.000
Totals: $2,996,783.690 $3,284,016.200 $3,465,480.400 $4,024,911.100