Show Job Controls
Bid Cobra

BELL FM 436 (0909-36-201)

Items: 72

County: BELL
Length: 0.0000 MILES
Highway: FM 436
District: WACO
Control Number: 0909-36-201
DBE Goal: 0.0%
Project: STP 2025(763)TAPS
Guaranty: $51,000.00
Time: 161 WORKING DAYS
Engineer's Estimate: $2,647,294.75
Date: 11/06/2025 (7 months ago)
Contract Number: 11253217
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00206360
Contract Type: Federal
Project Description: CONSTRUCT MORE THAN A MILE OF 8FT WIDE SIDEWALK ALONG NORTH SIDE OF FM 436 (W. MAIN ST) BETWEEN LAMAR ST AND SH 95. ADD MULTIPLE NEW CROSSWALKS, ADA RAMPS AND NEW SIGNAGE.
Mail/Deliver Bids To: N/A
MICHAEL YATES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$2,647,294.75
$2,132,110.60
Over/Under Est: -19.46% -$515,184.15
$2,149,742.25
Over/Under Est: -18.79% -$497,552.50
Amt Left: 0.83% $17,631.65
$2,150,647.20
Over/Under Est: -18.76% -$496,647.55
Amt Left: 0.87% $18,536.60
Delta: -0.04% -$904.95
$2,189,615.01
Over/Under Est: -17.29% -$457,679.74
Amt Left: 2.7% $57,504.41
Delta: -1.81% -$38,967.81
$2,197,197.00
Over/Under Est: -17% -$450,097.75
Amt Left: 3.05% $65,086.40
Delta: -0.35% -$7,581.99
Over/Under Est: -14.41% -$381,548.01
Amt Left: 6.27% $133,636.14
Delta: -3.12% -$68,549.74
$2,303,350.52
Over/Under Est: -12.99% -$343,944.23
Amt Left: 8.03% $171,239.92
Delta: -1.66% -$37,603.78
Subcontractor Percentage Amount
LINEAR TRAFFIC MARKINGS LLC 0.47% $10,020.92
Total: 0.47% $10,020.92

Bid Items & Bid Tabulations

72 Total 0 of 72
BELL  |  FM 436  |  WACO  |  0909-36-201  |  11/06/2025  |  $2,647,294.75  |  STP 2025(763)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  161 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
STX CIVIL
WELLCRAFT BUILDERS
TI-ZACK CONCRETE, LLC
TTG UTILITIES, INC.
TEXAS STEEL INDUSTRIAL PLACING, LLC
3LW CIVIL LLC
PREPARING ROW
STA 76.900 $900.000 $500.000 $600.000 $1,056.550 $110.000 $500.000 $1,000.000 $150.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 1.000 $2,500.000 $1,500.000 $1,000.000 $1,243.000 $1,650.000 $2,500.000 $2,500.000 $1,000.000
REMOV CONC (RIPRAP)
SY 338.000 $35.000 $40.000 $20.000 $15.750 $28.330 $22.000 $25.000 $30.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 43.000 $35.000 $40.000 $20.000 $15.620 $44.540 $22.000 $40.000 $30.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 247.000 $15.000 $40.000 $10.000 $10.000 $19.380 $9.000 $10.000 $10.500
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 1,081.000 $20.000 $10.000 $13.000 $24.860 $26.580 $10.000 $30.000 $15.000
EXCAV (CHANNEL)
CY 1,654.000 $40.000 $30.000 $40.000 $24.860 $51.280 $25.000 $25.000 $35.000
EMBANK (FNL)(OC)(TY B)
CY 573.000 $60.000 $30.000 $40.000 $43.500 $44.760 $25.000 $30.000 $35.000
FURN & PLACE TOPSOIL (4")
SY 17,163.000 $5.000 $4.000 $4.000 $3.400 $2.470 $3.000 $3.000 $4.250
BLOCK SODDING
SY 17,163.000 $10.000 $8.000 $6.000 $9.100 $5.500 $7.650 $3.000 $4.380
DRILL SEED (TEMP_WARM_COOL)
SY 17,163.000 $0.250 $0.200 $2.000 $0.320 $1.100 $0.450 $1.000 $0.100
VEGETATIVE WATERING
TGL 281.400 $60.000 $20.000 $50.000 $18.650 $1.100 $90.000 $30.000 $0.100
RDSIDE AMENITY (REMOV)
EA 1.000 $500.000 $500.000 $1.000 $186.450 $2,750.000 $500.000 $200.000 $50.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 441.000 $220.000 $100.000 $250.000 $167.800 $137.500 $153.000 $250.000 $159.600
CL A CONC (MISC)
CY 14.000 $1,750.000 $1,000.000 $700.000 $621.500 $815.740 $840.000 $800.000 $850.000
CL C CONC (COLLAR)
EA 5.000 $1,500.000 $1,000.000 $650.000 $621.500 $3,155.520 $1,030.000 $1,250.000 $1,250.000
CL C CONC (MISC)
CY 18.000 $1,250.000 $1,500.000 $800.000 $870.100 $815.740 $1,000.000 $1,000.000 $850.000
RIPRAP (CONC)(6 IN)
CY 195.000 $1,000.000 $600.000 $600.000 $621.500 $815.740 $750.000 $700.000 $702.550
RAIL (HANDRAIL)(TY F)
LF 429.000 $200.000 $150.000 $170.000 $155.370 $169.400 $170.000 $175.000 $220.620
CONC BOX CULV (4 FT X 2 FT)
LF 50.000 $400.000 $400.000 $430.000 $466.100 $635.390 $398.000 $800.000 $652.860
RC PIPE (CL III)(12 IN)
LF 160.000 $75.000 $80.000 $105.000 $87.000 $119.560 $106.000 $80.000 $106.630
RC PIPE (CL III)(18 IN)
LF 91.000 $120.000 $80.000 $130.000 $93.250 $122.900 $106.000 $85.000 $127.620
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 3.000 $8,000.000 $6,000.000 $5,800.000 $6,339.260 $12,808.130 $5,700.000 $6,500.000 $7,332.980
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $10,000.000 $8,000.000 $6,500.000 $7,457.950 $14,100.120 $6,600.000 $12,500.000 $9,557.930
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1)(C)
EA 6.000 $10,000.000 $3,000.000 $6,000.000 $9,726.400 $11,354.570 $4,625.000 $15,000.000 $10,324.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 7.000 $2,000.000 $1,000.000 $1,000.000 $745.800 $1,475.990 $1,043.000 $1,300.000 $2,411.040
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 2.000 $4,000.000 $1,500.000 $2,000.000 $932.250 $1,789.330 $1,440.000 $1,500.000 $2,529.000
GRATE & FRAME
EA 71.000 $2,000.000 $1,500.000 $1,600.000 $1,734.000 $1,278.920 $1,955.000 $2,500.000 $2,591.520
ADJUSTING MANHOLES
EA 3.000 $1,000.000 $1,000.000 $1,300.000 $2,486.000 $282.720 $560.000 $1,000.000 $1,250.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 3.000 $500.000 $600.000 $300.000 $621.500 $282.720 $470.000 $600.000 $750.000
ADJUSTING MANHOLES (WATER METER)
EA 1.000 $500.000 $500.000 $300.000 $932.000 $424.080 $1,560.000 $850.000 $750.000
CLEAN EXIST CULVERTS
EA 1.000 $1,000.000 $2,000.000 $3,000.000 $621.500 $2,032.110 $3,500.000 $500.000 $2,500.000
REMOV STR (INLET)
EA 1.000 $1,500.000 $1,000.000 $1,000.000 $1,243.000 $2,016.070 $800.000 $1,200.000 $1,500.000
REMOV STR (SET)
EA 10.000 $700.000 $100.000 $350.000 $435.000 $430.860 $350.000 $500.000 $550.000
REMOV STR (PIPE)
LF 268.000 $50.000 $10.000 $15.000 $18.900 $54.950 $30.000 $25.000 $25.000
REMOV STR (WOOD STR)
LF 35.000 $700.000 $10.000 $80.000 $25.000 $1.100 $50.000 $25.000 $50.000
MOBILIZATION
LS 1.000 $224,900.000 $200,000.000 $195,000.000 $149,408.000 $221,940.000 $230,000.000 $226,370.740 $35,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $5,000.000 $3,800.000 $6,215.000 $2,750.000 $5,000.000 $3,000.000 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $10,000.000 $10,000.000 $22,933.000 $1.100 $18,000.000 $20,000.000 $500.000
TMA (STATIONARY)
DAY 151.000 $200.000 $300.000 $145.000 $372.900 $1.100 $330.000 $150.000 $0.100
TMA (MOBILE OPERATION)
HR 40.000 $250.000 $50.000 $75.000 $124.300 $1.100 $85.000 $150.000 $0.100
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 93.000 $60.000 $30.000 $60.000 $62.700 $1.100 $52.000 $40.000 $0.100
ROCK FILTER DAMS (REMOVE)
LF 93.000 $15.000 $10.000 $20.000 $17.910 $1.100 $11.000 $15.000 $0.100
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,632.000 $6.000 $5.000 $4.000 $4.350 $1.100 $6.900 $4.000 $0.100
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,632.000 $2.000 $1.000 $1.000 $1.250 $1.100 $2.000 $2.000 $0.100
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 261.000 $8.000 $5.000 $5.000 $6.600 $1.100 $10.000 $10.000 $0.100
BIODEG EROSN CONT LOGS (REMOVE)
LF 261.000 $3.000 $1.000 $5.000 $2.200 $1.100 $1.800 $1.000 $0.100
CONC CURB (TY II)
LF 422.000 $40.000 $40.000 $18.000 $20.600 $59.530 $20.000 $40.000 $42.500
CONC CURB & GUTTER (TY II)
LF 188.000 $50.000 $40.000 $50.000 $38.000 $59.530 $30.000 $50.000 $75.000
CONC CURB & GUTTER (SLOTTED)
LF 41.000 $60.000 $40.000 $80.000 $58.000 $59.530 $43.000 $100.000 $110.000
DRIVEWAYS (CONC) (HES)
SY 766.000 $150.000 $120.000 $125.000 $124.700 $117.740 $125.000 $120.000 $102.760
DRIVEWAYS (ACP)
SY 599.000 $100.000 $120.000 $160.000 $155.400 $132.000 $155.000 $180.000 $146.400
CONC SIDEWALKS (4")
SY 6,215.000 $100.000 $90.000 $87.000 $76.700 $101.370 $81.500 $80.000 $83.090
CURB RAMPS (TY 1)
SY 248.000 $250.000 $400.000 $150.000 $169.200 $133.500 $160.000 $150.000 $139.860
CURB RAMPS (TY 2)
SY 29.000 $250.000 $400.000 $150.000 $201.500 $133.500 $160.000 $150.000 $153.650
CURB RAMPS (TY 6)
SY 25.000 $250.000 $400.000 $180.000 $243.750 $133.500 $160.000 $150.000 $153.650
CURB RAMPS (TY 7)
SY 26.000 $250.000 $400.000 $180.000 $224.750 $133.500 $160.000 $150.000 $153.650
CURB RAMPS (TY 20)
SY 22.000 $250.000 $400.000 $180.000 $265.600 $0.140 $160.000 $150.000 $153.650
CONC SIDEWALKS (SPECIAL)
SY 68.000 $225.000 $120.000 $160.000 $219.350 $257.220 $185.000 $190.000 $194.110
REMOVE METAL BEAM GUARD FENCE
LF 236.000 $40.000 $5.000 $30.000 $12.640 $27.500 $17.000 $10.000 $5.700
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $850.000 $800.000 $800.000 $683.650 $495.000 $1,100.000 $750.000 $802.800
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 12.000 $700.000 $100.000 $600.000 $714.720 $495.000 $580.000 $500.000 $738.000
REMOVE SM RD SN SUP&AM
EA 5.000 $150.000 $100.000 $100.000 $372.900 $495.000 $165.000 $150.000 $118.800
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 63.000 $5.000 $7.000 $2.550 $3.750 $5.500 $13.000 $5.000 $6.000
PAVEMENT SLER 6"
LF 63.000 $1.000 $3.000 $1.800 $0.950 $2.200 $3.700 $2.000 $2.400
PAVEMENT SLER 24"
LF 832.000 $5.000 $3.000 $5.300 $3.750 $7.700 $7.500 $2.000 $2.400
PREFAB PM TY C (W)(24")(SLD)
LF 832.000 $18.000 $20.000 $18.000 $18.650 $19.800 $22.000 $14.000 $16.800
ELIM EXT PM & MRKS (24")
LF 387.000 $10.000 $4.000 $3.800 $4.350 $27.500 $8.000 $20.000 $3.300
PAV SURF PREP FOR MRK (6")
LF 63.000 $1.000 $2.000 $0.800 $1.250 $1.100 $2.500 $1.000 $1.200
PAV SURF PREP FOR MRK (24")
LF 832.000 $3.000 $3.000 $0.800 $1.250 $1.100 $4.250 $2.000 $2.400
PED DETECT PUSH BUTTON (STANDARD)
EA 4.000 $1,000.000 $2,000.000 $4,000.000 $2,921.000 $1,375.000 $4,400.000 $1,500.000 $1,500.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 4.000 $500.000 $500.000 $150.000 $186.000 $275.000 $490.000 $1,500.000 $250.000
Totals: $2,647,294.750 $2,132,110.600 $2,149,742.250 $2,150,647.195 $2,189,615.010 $2,197,197.000 $2,265,746.740 $2,303,350.520