Show Job Controls
Bid Cobra

BELL SH 95 (0320-01-079)

Items: 81

County: BELL
Length: N/A
Highway: SH 95
District: WACO
Control Number: 0320-01-079
DBE Goal: N/A
Project: F 2B23(076)
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $1,685,969.86
Date: 08/02/2023 (2 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,685,969.86
$2,163,604.22
Over/Under Est: 28.33% $477,634.36
Over/Under Est: 42.82% $721,879.74
Amt Left: 11.29% $244,245.38
Subcontractor Percentage Amount
RUCOBA & MAYA CONSTRUCTION, LLC 13.69% $297,757.29
HJC FARMS, INC. 9.49% $206,407.35
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 2.75% $59,812.46
CEN TEX HYDROSEED, INC. 1.47% $31,972.48
D. I. J. CONSTRUCTION, INC. 0.87% $18,922.49
CEN-TREE SOLUTIONS LLC 0.45% $9,787.49
AWP SAFETY 0.43% $9,352.49
SUPERIOR TRAFFIC CONTROL, LLC 0.28% $6,090.00
MG DRILLING FOUNDATION, LLC 0.14% $3,045.00
KRL CONSTRUCTION INC. 0.00% $0.00
Total: 29.57% $643,147.05

Bid Items & Bid Tabulations

81 Total 0 of 81
BELL  |  SH 95  |  WACO  |  0320-01-079  |  08/02/2023  |  $1,685,969.86  |  F 2B23(076)  |  INTERS IMPRVS WITH RIGHT AND/OR LEFT...  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
PREPARING ROW
STA 30.400 $250.000 $500.000 $1,000.000
REMOVING CONC (DRIVEWAYS)
SY 117.000 $15.250 $21.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 49.000 $6.250 $18.000 $20.000
EXCAVATION (ROADWAY)
CY 4,438.000 $8.750 $15.500 $25.000
EXCAVATION (CHANNEL)
CY 3,966.000 $8.000 $17.980 $25.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,855.000 $8.250 $19.470 $28.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 7,523.000 $0.250 $1.000 $0.250
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 7,523.000 $0.200 $0.750 $0.200
VEGETATIVE WATERING
MG 122.200 $6.500 $40.000 $20.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 3,476.000 $48.000 $65.000 $85.000
REWORK BS MTL (TY C) (6") (DENS CONT)
SY 2,381.000 $2.000 $0.010 $5.000
REWORK BS MTL (TY C) (8") (DENS CONT)
SY 9,658.000 $2.250 $0.010 $5.000
SALV, HAUL & STKPL RCL APH PV (6 TO 8")
SY 492.000 $2.390 $10.000 $10.000
PRIME COAT(MC-30 OR AE-P)
GAL 1,826.000 $4.000 $4.700 $5.500
ASPH (CRS-2)
GAL 3,998.000 $3.210 $3.500 $4.500
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 60.000 $125.000 $283.000 $250.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
SY 100.000 $130.000 $205.000 $200.000
PLANE ASPH CONC PAV (0"- 2 1/2")
SY 15,223.000 $6.000 $3.000 $3.000
CURB (TYPE II)
LF 787.000 $25.000 $19.940 $30.000
CEM STABIL BKFL
CY 40.000 $100.000 $349.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 365.000 $4.000 $12.290 $20.000
TEMPORARY SPL SHORING
SF 638.000 $25.000 $26.640 $50.000
DRILL SHAFT (30 IN)
LF 24.000 $300.000 $265.000 $300.000
RIPRAP (CONC)(4 IN)
CY 115.000 $450.000 $547.800 $450.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 82.000 $135.000 $229.900 $200.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 10.000 $500.000 $899.000 $1,100.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 18.000 $19.000 $999.000 $1,400.000
RC PIPE (CL III)(18 IN)
LF 302.000 $70.000 $99.290 $80.000
RC PIPE (CL III)(24 IN)
LF 68.000 $93.000 $125.000 $125.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $7,500.000 $8,499.000 $8,500.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (C)
EA 2.000 $9,000.000 $15,990.000 $14,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 14.000 $1,100.000 $1,285.000 $1,900.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,300.000 $1,699.000 $2,500.000
MOBILIZATION
LS 1.000 $100,000.000 $216,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $10,000.000 $5,900.000 $3,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 69.000 $35.000 $38.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 69.000 $10.500 $15.000 $30.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,171.000 $3.250 $3.750 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,171.000 $0.750 $1.000 $0.750
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 3,060.000 $9.750 $20.000 $15.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,060.000 $5.000 $15.000 $10.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 3,060.000 $8.500 $20.000 $15.000
DRIVEWAYS (ACP)
SY 492.000 $50.000 $80.000 $100.000
DRIVEWAYS (CONC) (HES)
SY 117.000 $81.000 $143.000 $150.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $2,750.000 $3,500.000 $2,750.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,350.000 $2,500.000 $3,500.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,400.000 $2,000.000 $1,500.000
RELOCATE EXISTING MAILBOX
EA 6.000 $500.000 $90.000 $500.000
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 3.000 $4,650.000 $5,500.000 $6,500.000
CONDT (PVC) (SCH 40) (3")
LF 20.000 $21.000 $45.000 $50.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 275.000 $55.000 $76.000 $80.000
ELEC CONDR (NO.6) BARE
LF 290.000 $2.000 $2.000 $2.250
ELEC CONDR (NO.6) INSULATED
LF 580.000 $2.250 $3.000 $3.250
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,300.000 $1,600.000 $2,000.000
ELC SRV TY A 120/240 060(NS)SS(T)TP(O)
EA 1.000 $3,800.000 $6,300.000 $6,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $650.000 $850.000 $850.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $77.500 $110.000 $50.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 32.000 $1.000 $1.100 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 76.000 $1.000 $1.100 $2.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,805.000 $1.000 $1.160 $1.250
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 24.000 $7.000 $15.000 $20.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,011.000 $0.750 $0.190 $0.250
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 5,898.000 $0.550 $0.840 $0.900
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 4,289.000 $0.550 $1.140 $1.200
PREFAB PAV MRK TY C (W) (ARROW)
EA 5.000 $220.000 $32.000 $350.000
PREFAB PAV MRK TY C (W) (WORD)
EA 5.000 $270.000 $415.000 $450.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 4.000 $32.000 $70.000 $80.000
REFL PAV MRKR TY I-C
EA 79.000 $4.000 $7.800 $10.000
REFL PAV MRKR TY II-A-A
EA 348.000 $5.750 $5.000 $7.500
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 4.000 $2,000.000 $500.000 $500.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 3,409.000 $102.000 $110.000 $120.000
D-GR HMA TY-D PG64-22
TON 252.000 $205.000 $145.000 $150.000
TACK COAT
GAL 1,166.000 $4.250 $2.900 $8.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 1,309.000 $155.000 $170.000 $160.000
TACK COAT
GAL 2,218.000 $4.000 $2.900 $6.000
UNDERSEAL COURSE
GAL 5,938.000 $5.000 $4.000 $6.250
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 90.000 $64.300 $95.000 $125.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,750.000 $12,500.000 $10,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $10,200.000 $13,500.000 $15,000.000
TMA (STATIONARY)
DAY 8.000 $175.800 $280.000 $275.000
TMA (MOBILE OPERATION)
HR 64.000 $71.500 $40.000 $95.000
Totals: $1,685,969.860 $2,163,604.220 $2,407,849.600