|
|
PREPARING ROW
|
STA
|
30.400
|
$250.000
|
$500.000
|
$1,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
117.000
|
$15.250
|
$21.000
|
$20.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
49.000
|
$6.250
|
$18.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,438.000
|
$8.750
|
$15.500
|
$25.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
3,966.000
|
$8.000
|
$17.980
|
$25.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
2,855.000
|
$8.250
|
$19.470
|
$28.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
7,523.000
|
$0.250
|
$1.000
|
$0.250
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
7,523.000
|
$0.200
|
$0.750
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
122.200
|
$6.500
|
$40.000
|
$20.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
3,476.000
|
$48.000
|
$65.000
|
$85.000
|
|
|
REWORK BS MTL (TY C) (6") (DENS CONT)
|
SY
|
2,381.000
|
$2.000
|
$0.010
|
$5.000
|
|
|
REWORK BS MTL (TY C) (8") (DENS CONT)
|
SY
|
9,658.000
|
$2.250
|
$0.010
|
$5.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (6 TO 8")
|
SY
|
492.000
|
$2.390
|
$10.000
|
$10.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
1,826.000
|
$4.000
|
$4.700
|
$5.500
|
|
|
ASPH (CRS-2)
|
GAL
|
3,998.000
|
$3.210
|
$3.500
|
$4.500
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
60.000
|
$125.000
|
$283.000
|
$250.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
|
SY
|
100.000
|
$130.000
|
$205.000
|
$200.000
|
|
|
PLANE ASPH CONC PAV (0"- 2 1/2")
|
SY
|
15,223.000
|
$6.000
|
$3.000
|
$3.000
|
|
|
CURB (TYPE II)
|
LF
|
787.000
|
$25.000
|
$19.940
|
$30.000
|
|
|
CEM STABIL BKFL
|
CY
|
40.000
|
$100.000
|
$349.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
365.000
|
$4.000
|
$12.290
|
$20.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
638.000
|
$25.000
|
$26.640
|
$50.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
24.000
|
$300.000
|
$265.000
|
$300.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
115.000
|
$450.000
|
$547.800
|
$450.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
82.000
|
$135.000
|
$229.900
|
$200.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
10.000
|
$500.000
|
$899.000
|
$1,100.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
18.000
|
$19.000
|
$999.000
|
$1,400.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
302.000
|
$70.000
|
$99.290
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
68.000
|
$93.000
|
$125.000
|
$125.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$7,500.000
|
$8,499.000
|
$8,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
2.000
|
$9,000.000
|
$15,990.000
|
$14,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,100.000
|
$1,285.000
|
$1,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,300.000
|
$1,699.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$100,000.000
|
$216,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$10,000.000
|
$5,900.000
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
69.000
|
$35.000
|
$38.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
69.000
|
$10.500
|
$15.000
|
$30.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,171.000
|
$3.250
|
$3.750
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,171.000
|
$0.750
|
$1.000
|
$0.750
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
3,060.000
|
$9.750
|
$20.000
|
$15.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,060.000
|
$5.000
|
$15.000
|
$10.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
3,060.000
|
$8.500
|
$20.000
|
$15.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
492.000
|
$50.000
|
$80.000
|
$100.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
117.000
|
$81.000
|
$143.000
|
$150.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$2,750.000
|
$3,500.000
|
$2,750.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,350.000
|
$2,500.000
|
$3,500.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$1,400.000
|
$2,000.000
|
$1,500.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
6.000
|
$500.000
|
$90.000
|
$500.000
|
|
|
IN RD IL (TY SA) 40T-12 (250W EQ) LED
|
EA
|
3.000
|
$4,650.000
|
$5,500.000
|
$6,500.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
20.000
|
$21.000
|
$45.000
|
$50.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
275.000
|
$55.000
|
$76.000
|
$80.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
290.000
|
$2.000
|
$2.000
|
$2.250
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
580.000
|
$2.250
|
$3.000
|
$3.250
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$1,300.000
|
$1,600.000
|
$2,000.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(T)TP(O)
|
EA
|
1.000
|
$3,800.000
|
$6,300.000
|
$6,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$650.000
|
$850.000
|
$850.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$77.500
|
$110.000
|
$50.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
32.000
|
$1.000
|
$1.100
|
$2.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
76.000
|
$1.000
|
$1.100
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,805.000
|
$1.000
|
$1.160
|
$1.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
24.000
|
$7.000
|
$15.000
|
$20.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
2,011.000
|
$0.750
|
$0.190
|
$0.250
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
5,898.000
|
$0.550
|
$0.840
|
$0.900
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,289.000
|
$0.550
|
$1.140
|
$1.200
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$220.000
|
$32.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$270.000
|
$415.000
|
$450.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
4.000
|
$32.000
|
$70.000
|
$80.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
79.000
|
$4.000
|
$7.800
|
$10.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
348.000
|
$5.750
|
$5.000
|
$7.500
|
|
|
CLEANING / SWEEPING (AGGREGATE REMOVAL)
|
MI
|
4.000
|
$2,000.000
|
$500.000
|
$500.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
3,409.000
|
$102.000
|
$110.000
|
$120.000
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
252.000
|
$205.000
|
$145.000
|
$150.000
|
|
|
TACK COAT
|
GAL
|
1,166.000
|
$4.250
|
$2.900
|
$8.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
1,309.000
|
$155.000
|
$170.000
|
$160.000
|
|
|
TACK COAT
|
GAL
|
2,218.000
|
$4.000
|
$2.900
|
$6.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
5,938.000
|
$5.000
|
$4.000
|
$6.250
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
90.000
|
$64.300
|
$95.000
|
$125.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,750.000
|
$12,500.000
|
$10,000.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$10,200.000
|
$13,500.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
8.000
|
$175.800
|
$280.000
|
$275.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
64.000
|
$71.500
|
$40.000
|
$95.000
|
|
Totals: |
$1,685,969.860
|
$2,163,604.220
|
$2,407,849.600
|