Show Job Controls
Bid Cobra

BELL US 190 (0231-03-143)

Items: 130

County: BELL
Length: N/A
Highway: US 190
District: WACO
Control Number: 0231-03-143
DBE Goal: N/A
Project: NH 2018(347)
Guaranty: N/A
Time: 276 WORKING DAYS
Engineer's Estimate: $7,986,415.49
Date: 12/06/2017 (8 years ago)
Contract Number: N/A
Type: WDN, BS, STR, SURF
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$7,986,415.49
$7,287,694.48
Over/Under Est: -8.75% -$698,721.01
Over/Under Est: -4.26% -$340,038.56
Amt Left: 4.92% $358,682.45
Over/Under Est: 2.56% $204,065.61
Amt Left: 12.39% $902,786.62
Delta: -7.12% -$544,104.17
Over/Under Est: 2.95% $235,867.04
Amt Left: 12.82% $934,588.05
Delta: -0.39% -$31,801.43
Over/Under Est: 6.41% $511,644.81
Amt Left: 16.61% $1,210,365.82
Delta: -3.35% -$275,777.77
$8,992,514.35
Over/Under Est: 12.6% $1,006,098.86
Amt Left: 23.39% $1,704,819.87
Delta: -5.82% -$494,454.05

Bid Items & Bid Tabulations

130 Total 0 of 130
BELL  |  US 190  |  WACO  |  0231-03-143  |  12/06/2017  |  $7,986,415.49  |  NH 2018(347)  |  WDN, BS, STR, SURF  |  276 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
OLDCASTLE MATERIALS TEXAS, INC.
ANGEL BROTHERS HOLDINGS CORP.
JAMES CONSTRUCTION GROUP, L.L.C.
KNIFE RIVER CORPORATION - SOUTH
TTG UTILITIES, LP
REMOVING CONCRETE(MOW STRIP)
LF 9,880.000 $6.500 $5.000 $2.250 $8.500 $2.350 $3.050 $4.500
REMOV STAB BASE & ASPH PAV (8"-20")
SY 17,740.000 $7.000 $5.000 $8.100 $4.000 $8.400 $3.400 $4.500
EXCAVATION (ROADWAY)
CY 5,869.000 $8.500 $5.000 $11.350 $13.500 $3.000 $5.500 $10.500
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 24,335.000 $9.500 $10.000 $12.400 $11.000 $16.000 $15.000 $13.000
BACKFILL (TY A OR B)
STA 170.500 $250.000 $150.000 $140.000 $80.000 $55.000 $65.000 $350.000
FURNISHING AND PLACING TOPSOIL (4")
SY 61,722.000 $1.000 $1.000 $1.900 $1.850 $1.600 $0.300 $1.650
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 61,722.000 $0.250 $0.100 $0.090 $0.170 $0.090 $0.090 $0.170
DRILL SEEDING (TEMP) (WARM)
SY 30,862.000 $0.100 $0.100 $0.100 $0.140 $0.100 $0.110 $0.140
DRILL SEEDING (TEMP) (COOL)
SY 30,862.000 $0.100 $0.100 $0.100 $0.140 $0.100 $0.110 $0.140
VEGETATIVE WATERING
MG 1,002.400 $13.000 $10.000 $21.000 $10.000 $19.700 $18.300 $25.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 40,696.000 $1.500 $1.000 $0.800 $1.250 $0.880 $0.840 $1.300
PROOF ROLLING
HR 16.000 $95.000 $90.000 $92.000 $75.000 $120.000 $85.000 $150.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 10,228.000 $37.000 $33.000 $31.250 $32.000 $37.000 $30.000 $31.500
PRIME COAT(MC-30 OR AE-P)
GAL 10,286.000 $3.250 $3.250 $2.750 $3.500 $2.640 $2.800 $2.850
ASPH (CRS-2)
GAL 22,672.000 $2.000 $2.250 $1.900 $2.750 $1.930 $1.800 $2.600
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 401.000 $140.000 $80.000 $89.500 $125.000 $91.530 $124.000 $125.000
D-GR HMA(SQ) TY-C SAC-B PG64-22
TON 2,945.000 $105.000 $70.000 $55.300 $65.000 $57.460 $62.300 $75.000
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
TON 901.000 $120.000 $70.000 $66.650 $84.000 $69.150 $68.050 $79.000
D-GR HMA TY-B PG64-22
TON 22,336.000 $60.000 $55.000 $50.600 $61.000 $52.880 $59.300 $59.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 16,005.000 $100.000 $88.000 $92.750 $92.000 $97.630 $89.000 $95.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 500.000 $40.000 $50.000 $38.000 $95.000 $38.640 $36.000 $52.000
PLANE ASPH CONC PAV(0" TO 3")
SY 17,836.000 $2.500 $1.750 $0.800 $2.500 $0.860 $1.250 $3.250
PLANE ASPH CONC PAV (2")
SY 16,619.000 $1.500 $1.750 $0.850 $1.850 $0.860 $1.450 $2.550
TRENCH EXCAVATION PROTECTION
LF 134.000 $20.000 $8.000 $12.000 $12.500 $1.000 $20.000 $2.600
DRILL SHAFT (42 IN)
LF 22.000 $320.000 $470.000 $470.000 $500.000 $472.550 $495.000 $370.000
DRILL SHAFT (48 IN)
LF 330.000 $250.000 $480.000 $480.000 $510.000 $482.290 $515.000 $500.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 12.000 $180.000 $300.000 $280.000 $300.000 $280.000 $295.000 $700.000
CL C CONC (SIGN COLUMN)
CY 220.400 $760.000 $900.000 $1,443.000 $600.000 $900.000 $1,130.000 $545.000
CL C CONC (MISC)
CY 16.200 $700.000 $1,500.000 $470.000 $600.000 $3,300.000 $3,900.000 $580.000
CONCRETE PAINT FINISH
SF 4,430.000 $0.500 $2.000 $2.950 $1.800 $0.450 $3.950 $2.850
RIPRAP (CONC)(4 IN)
CY 38.550 $410.000 $400.000 $425.000 $585.000 $400.000 $410.500 $365.000
RIPRAP (MOW STRIP)(4 IN)
CY 155.000 $480.000 $400.000 $485.000 $510.000 $410.000 $457.000 $350.000
RC PIPE (CL III)(24 IN)
LF 749.000 $68.000 $55.000 $80.000 $70.000 $90.000 $133.000 $74.000
RC PIPE (CL III)(36 IN)
LF 8.000 $125.000 $150.000 $350.000 $210.000 $520.000 $325.000 $130.000
MANH (COMPL)(PRM)(48IN)
EA 1.000 $3,500.000 $5,000.000 $3,200.000 $3,000.000 $3,900.000 $4,660.000 $5,375.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 12.000 $3,800.000 $3,800.000 $3,500.000 $3,500.000 $3,200.000 $5,050.000 $3,900.000
INLET (COMPL)(TY H)(MOD)
EA 3.000 $3,900.000 $3,800.000 $3,500.000 $4,000.000 $4,800.000 $5,895.000 $2,265.000
ADJUSTING INLET (CAP)
EA 7.000 $1,500.000 $1,500.000 $1,500.000 $2,000.000 $3,400.000 $5,635.000 $1,025.000
CLEAN EXIST CULVERTS
EA 6.000 $1,450.000 $1,500.000 $1,500.000 $1,000.000 $3,000.000 $12,730.000 $3,500.000
REMOV STR (INLET)
EA 5.000 $1,000.000 $850.000 $800.000 $850.000 $660.000 $1,435.000 $1,275.000
REMOV STR (PIPE)
LF 219.000 $17.000 $10.000 $30.000 $15.000 $15.000 $15.800 $11.650
REMOV STR (PIPE UNDERDRAIN)
LF 2,300.000 $5.000 $7.000 $10.600 $6.500 $3.600 $10.550 $8.300
MOBILIZATION
LS 1.000 $713,998.670 $508,000.000 $575,045.000 $475,000.000 $800,000.000 $491,085.000 $510,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $9,000.000 $3,400.000 $8,300.000 $2,500.000 $45,500.000 $14,230.000 $6,900.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,180.000 $27.000 $25.000 $21.100 $22.500 $26.000 $22.000 $22.650
ROCK FILTER DAMS (REMOVE)
LF 1,180.000 $7.500 $5.000 $6.000 $6.000 $8.380 $6.300 $6.450
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,319.000 $2.800 $3.500 $2.650 $2.650 $3.500 $4.150 $2.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,319.000 $0.600 $0.500 $0.250 $0.300 $0.950 $0.250 $0.270
CONSTRUCTING DETOURS
SY 3,913.000 $70.000 $50.000 $38.550 $43.000 $56.000 $41.350 $52.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 22,530.000 $7.000 $5.000 $5.350 $20.000 $4.990 $8.900 $22.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 260.000 $19.700 $20.000 $7.400 $20.000 $16.640 $26.600 $22.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 20.000 $21.900 $20.000 $35.250 $20.000 $43.470 $82.800 $22.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 9,120.000 $5.800 $5.000 $5.500 $6.000 $4.140 $3.900 $12.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 22,530.000 $5.000 $5.000 $4.150 $18.000 $4.420 $6.750 $16.500
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 260.000 $17.000 $20.000 $7.400 $15.000 $14.440 $22.750 $16.500
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 20.000 $20.000 $20.000 $35.250 $15.000 $41.270 $29.600 $18.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,775.000 $6.000 $15.000 $5.900 $18.000 $6.000 $8.200 $18.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 11,121.000 $45.000 $65.000 $75.100 $56.000 $54.000 $118.850 $93.500
RUMBLE STRIPS (SHOULDER)
LF 41,141.000 $0.150 $0.200 $0.280 $0.300 $0.170 $0.350 $0.150
MTL W-BEAM GD FEN (STEEL POST)
LF 2,125.000 $23.000 $19.000 $18.300 $19.500 $18.300 $19.250 $19.650
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,000.000 $1,100.000 $1,039.000 $1,100.000 $1,039.000 $1,095.000 $1,115.000
REMOVE METAL BEAM GUARD FENCE
LF 654.000 $2.250 $1.000 $1.000 $1.500 $1.000 $1.050 $1.080
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $190.000 $150.000 $125.000 $135.000 $125.000 $132.000 $134.000
REMOVE CABLE BARRIER
LF 9,880.000 $3.250 $3.000 $3.000 $3.250 $3.000 $3.150 $3.250
REMOVE CABLE BARRIER TERMINAL SECTION
EA 8.000 $300.000 $700.000 $700.000 $750.000 $700.000 $737.000 $750.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,500.000 $2,400.000 $2,361.000 $2,500.000 $2,361.000 $2,485.000 $2,535.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $275.000 $150.000 $150.000 $160.000 $150.000 $158.000 $161.000
CRASH CUSH ATTEN (INSTL)
EA 6.000 $10,500.000 $15,700.000 $15,625.000 $16,500.000 $15,625.000 $16,450.000 $16,775.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,900.000 $2,000.000 $1,750.000 $1,850.000 $1,750.000 $1,845.000 $1,880.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $700.000 $1,500.000 $1,500.000 $1,600.000 $1,500.000 $1,580.000 $1,880.000
PIPE UNDERDRAINS (TY 6) (6")
LF 2,300.000 $18.000 $24.000 $25.000 $25.000 $25.000 $45.250 $12.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $2,250.000 $1,700.000 $1,700.000 $1,800.000 $1,700.000 $1,790.000 $1,610.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 16.000 $1,302.000 $1,200.000 $1,200.000 $1,300.000 $1,200.000 $1,265.000 $1,505.000
CONDT (PVC) (SCH 40) (2")
LF 440.000 $9.500 $13.000 $13.000 $13.800 $13.000 $13.700 $7.500
CONDT (PVC) (SCH 40) (3")
LF 200.000 $20.000 $14.000 $14.000 $14.850 $14.000 $14.750 $9.650
CONDT (PVC) (SCH 80) (2")
LF 465.000 $7.000 $17.000 $17.000 $18.050 $17.000 $17.900 $15.000
CONDT (RM) (1 1/4")
LF 805.000 $16.000 $26.000 $26.000 $28.000 $26.000 $27.350 $19.350
ELEC CONDR (NO.12) BARE
LF 1,030.000 $1.000 $1.500 $1.500 $1.600 $1.500 $1.550 $1.070
ELEC CONDR (NO.12) INSULATED
LF 2,060.000 $1.000 $1.400 $1.400 $1.500 $1.400 $1.450 $1.180
ELEC CONDR (NO.8) BARE
LF 880.000 $2.500 $1.750 $1.750 $1.850 $1.750 $1.850 $1.500
ELEC CONDR (NO.8) INSULATED
LF 1,760.000 $2.500 $1.750 $1.750 $1.850 $1.750 $1.850 $1.600
GROUND BOX TY A (122311)W/APRON
EA 3.000 $875.000 $900.000 $900.000 $1,000.000 $900.000 $950.000 $907.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,200.000 $1,200.000 $1,200.000 $1,300.000 $1,200.000 $1,265.000 $1,500.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $1,500.000 $250.000 $250.000 $300.000 $250.000 $265.000 $540.000
ELC SRV TY A 120/240 060(SS)SS(E)SP(O)
EA 1.000 $4,500.000 $6,500.000 $6,500.000 $7,000.000 $6,500.000 $6,840.000 $6,660.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(U)
EA 1.000 $6,075.000 $5,600.000 $5,600.000 $6,000.000 $5,600.000 $5,895.000 $7,350.000
ALUMINUM SIGNS (TY O)
SF 1,773.500 $20.000 $17.000 $17.000 $18.000 $17.000 $17.850 $20.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $450.000 $650.000 $636.000 $675.000 $636.000 $670.000 $985.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 13.000 $700.000 $560.000 $554.400 $600.000 $554.400 $585.000 $595.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $780.000 $550.000 $542.130 $575.000 $542.130 $570.000 $585.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $1,500.000 $2,200.000 $2,200.000 $2,000.000 $2,992.010 $2,315.000 $1,960.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $240.000 $550.000 $535.000 $600.000 $535.000 $565.000 $575.000
REMOVE SM RD SN SUP&AM
EA 7.000 $120.000 $100.000 $75.000 $80.000 $75.000 $78.950 $80.000
RELOCATE LRSA
EA 1.000 $5,000.000 $3,500.000 $3,100.000 $3,300.000 $3,100.000 $3,265.000 $2,700.000
REMOVE LRSA
EA 6.000 $750.000 $650.000 $650.000 $700.000 $650.000 $684.000 $365.000
INS OH SN SUP(25 FT BAL TEE)
EA 1.000 $14,000.000 $15,000.000 $14,900.000 $16,000.000 $14,900.000 $15,685.000 $16,200.000
INS OH SN SUP(30 FT CANT)
EA 4.000 $15,500.000 $15,500.000 $15,500.000 $16,500.000 $15,500.000 $16,315.000 $16,650.000
INS OH SN SUP(35 FT CANT)
EA 2.000 $40,000.000 $16,800.000 $16,800.000 $18,000.000 $16,800.000 $17,685.000 $17,200.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 54.000 $50.000 $40.000 $40.000 $45.000 $40.000 $42.000 $43.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 27.000 $15.000 $15.000 $12.500 $15.000 $12.500 $13.000 $13.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 11.000 $15.000 $15.000 $12.500 $15.000 $12.500 $13.000 $13.500
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 4,178.000 $1.500 $2.500 $2.560 $3.000 $2.530 $2.650 $5.900
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 31,916.000 $1.500 $0.500 $0.490 $0.650 $0.490 $0.510 $1.050
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 32,483.000 $1.000 $0.500 $0.490 $0.650 $0.490 $0.510 $1.050
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 5,595.000 $1.200 $1.400 $1.430 $1.250 $1.420 $1.470 $2.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 210.000 $1.250 $1.000 $1.200 $1.500 $1.000 $0.890 $2.350
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,611.000 $1.000 $1.000 $1.200 $1.000 $1.000 $0.890 $2.550
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 611.000 $0.600 $1.000 $0.690 $0.900 $0.680 $0.710 $1.350
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
LF 1,560.000 $2.000 $2.000 $2.050 $2.550 $2.020 $2.110 $4.150
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 1,740.000 $3.000 $2.000 $2.050 $3.200 $2.020 $2.110 $3.170
PAVEMENT SEALER 6"
LF 8,254.000 $0.120 $0.180 $0.180 $0.270 $0.180 $0.190 $0.700
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 11,010.000 $0.350 $0.420 $0.430 $0.600 $0.420 $0.440 $0.750
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 26,081.000 $0.300 $0.420 $0.430 $0.500 $0.420 $0.440 $0.750
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 28,132.000 $0.300 $0.420 $0.430 $0.500 $0.420 $0.440 $0.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $210.000 $200.000 $204.520 $270.000 $202.260 $211.000 $340.000
PREFAB PAV MRK TY C (W) (NUMBER)
EA 4.000 $220.000 $150.000 $153.390 $215.000 $151.690 $158.000 $475.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $270.000 $200.000 $204.520 $360.000 $202.260 $210.000 $475.000
REFL PAV MRKR TY II-C-R
EA 1,170.000 $3.250 $3.000 $3.070 $3.250 $3.030 $3.160 $7.500
ELIM EXT PAV MRK & MRKS (4")
LF 68,110.000 $0.400 $0.500 $0.440 $0.370 $0.430 $0.450 $0.650
ELIM EXT PAV MRK & MRKS (6")
LF 13,649.000 $0.350 $0.750 $0.640 $0.420 $0.640 $0.660 $1.500
ELIM EXT PAV MRK & MRKS (8")
LF 4,446.000 $0.750 $1.000 $0.820 $0.640 $0.810 $0.840 $1.950
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $40.000 $70.000 $64.420 $25.000 $63.710 $66.320 $75.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $55.000 $70.000 $64.420 $30.000 $63.710 $66.320 $110.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 4,455.000 $0.800 $1.500 $0.640 $0.950 $0.400 $1.300 $0.700
TRACKLESS TACK COAT
GAL 24,732.000 $3.000 $0.000 $0.000 $0.000 $0.000 $3.450 $5.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 50.000 $150.000 $100.000 $288.000 $250.000 $108.250 $160.000 $270.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $12,000.000 $10,000.000 $16,500.000 $25,000.000 $2,165.000 $2,600.000 $27,000.000
ITS POLE (50 FT)(110 MPH)
EA 1.000 $11,500.000 $16,000.000 $15,400.000 $16,500.000 $15,400.000 $16,210.000 $12,500.000
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 1.000 $6,000.000 $6,000.000 $5,600.000 $6,000.000 $5,600.000 $5,895.000 $10,200.000
1
MEMBRANE UNDERSEAL
GAL 36,371.000 $2.040 $2.300 $1.950 $1.750 $1.950 $0.000 $0.000
Totals: $8,060,611.490 $7,287,694.480 $7,646,376.930 $8,190,481.100 $8,222,282.530 $8,498,060.310 $8,992,514.350