Show Job Controls
Bid Cobra

BEE US0181 (6376-30-001)

Items: 66

County: BEE
Length: N/A
Highway: US0181
District: CORPUS CHRISTI
Control Number: 6376-30-001
DBE Goal: N/A
Project: RMC - 637630001
Guaranty: N/A
Time: 33 W
Engineer's Estimate: $252,829.30
Date: 03/23/2021 (5 years ago)
Contract Number: N/A
Type: INSTALLATION OF TRAFFIC SIGNALS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$252,829.30
$234,692.27
Over/Under Est: -7.17% -$18,137.03
Over/Under Est: -6.08% -$15,382.65
Amt Left: 1.17% $2,754.38
Over/Under Est: 78.46% $198,360.19
Amt Left: 92.25% $216,497.22
Delta: -90.02% -$213,742.84

Bid Items & Bid Tabulations

66 Total 0 of 66
BEE  |  US0181  |  CORPUS CHRISTI  |  6376-30-001  |  03/23/2021  |  $252,829.30  |  RMC - 637630001  |  INSTL OF TRAF SIG  |  33 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
MALDONADO-BURKETT, LLP
E-Z BEL CONSTRUCTION, LLC
AMERICAN LIGHTING AND SIGNALIZATION, LLC
REMOVING CONC (SIDEWALKS)
SY 30.500 $34.000 $39.600 $35.000 $88.000
REMOVING CONC (DRIVEWAYS)
SY 238.500 $14.600 $39.600 $35.000 $79.120
REMOVING CONC (CURB)
LF 202.000 $3.100 $5.500 $9.000 $81.960
REMOVING CONC (CURB AND GUTTER)
LF 117.000 $8.800 $5.500 $12.000 $49.500
REMOVING CONC (WHEELCHAIR RAMP)
SY 47.000 $21.500 $39.600 $35.000 $77.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 6.000 $182.800 $225.000 $210.000 $203.750
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $414.500 $548.000 $500.000 $589.140
MOBILIZATION
LS 1.000 $21,686.000 $25,000.000 $24,450.000 $38,839.900
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $8,057.100 $1,100.000 $7,000.000 $16,669.030
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 14.000 $5.300 $20.000 $7.000 $11.980
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 14.000 $7.500 $25.000 $9.000 $11.980
BIODEG EROSN CONT LOGS (REMOVE)
LF 28.000 $1.600 $15.000 $1.000 $2.370
CONC CURB (TY II)
LF 423.000 $14.200 $38.500 $25.000 $92.710
CONC CURB & GUTTER (TY II)
LF 156.000 $28.300 $38.500 $45.000 $124.810
DRIVEWAYS (CONC)
SY 238.000 $73.900 $108.900 $95.000 $177.020
CONC SIDEWALKS (5")
SY 81.000 $77.200 $99.000 $95.000 $246.480
CURB RAMPS (TY 2)
SY 56.000 $300.000 $38.500 $150.000 $110.000
CURB RAMPS (TY 21)
SY 16.000 $2,579.000 $38.500 $150.000 $3,300.000
CONC MEDIAN
SY 177.000 $72.600 $89.100 $100.000 $165.000
CONDT (PVC) (SCH 40) (2")
LF 10.000 $7.000 $25.000 $20.000 $30.290
CONDT (PVC) (SCH 40) (3")
LF 134.000 $7.700 $30.000 $20.000 $18.950
CONDT (PVC) (SCH 40) (3") (BORE)
LF 85.000 $33.000 $38.520 $77.000 $46.810
ELEC CONDR (NO.8) INSULATED
LF 202.000 $1.700 $1.840 $5.000 $2.370
ELEC CONDR (NO.6) BARE
LF 22.000 $1.000 $2.230 $5.000 $2.990
ELEC CONDR (NO.6) INSULATED
LF 44.000 $1.400 $2.780 $5.000 $2.740
TRAY CABLE (3 CONDR) (12 AWG)
LF 132.000 $2.500 $3.670 $5.000 $3.560
GROUND BOX TY C (162911)W/APRON
EA 3.000 $1,200.000 $1,100.000 $1,000.000 $1,213.930
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,156.900 $1,400.000 $1,250.000 $1,224.050
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 1.000 $6,237.900 $7,800.000 $6,500.000 $5,051.990
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 13.000 $462.800 $644.000 $575.000 $632.500
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 5.000 $655.900 $868.000 $775.000 $852.500
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $613.500 $924.000 $825.000 $907.500
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $836.600 $1,064.000 $950.000 $1,045.000
RELOCATE SM RD SN SUP&AM TY S80
EA 4.000 $659.600 $420.000 $375.000 $412.500
REMOVE SM RD SN SUP&AM
EA 22.000 $67.900 $67.200 $60.000 $66.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 302.000 $0.300 $0.504 $0.450 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 226.000 $0.300 $0.504 $0.450 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 943.000 $0.300 $0.504 $0.450 $0.500
PREFAB PAV MRK TY C (W) (8") (SLD)
LF 20.000 $5.000 $5.600 $5.000 $5.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 144.000 $10.100 $17.920 $16.000 $17.600
PREFAB PAV MRK TY C (W) (ARROW)
EA 5.000 $177.600 $224.000 $200.000 $220.000
PREFAB PAV MRK TY C (Y) (4") (SLD)
LF 34.000 $3.000 $3.360 $3.000 $3.300
REFL PAV MRKR TY I-C
EA 18.000 $2.200 $5.600 $5.000 $5.500
REFL PAV MRKR TY I-R
EA 49.000 $4.500 $5.600 $5.000 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 1,762.000 $0.900 $0.336 $0.300 $0.330
ELIM EXT PAV MRK & MRKS (12")
LF 252.000 $2.600 $1.008 $0.900 $0.990
ELIM EXT PAV MRK & MRKS (ARROW)
EA 4.000 $174.300 $61.600 $55.000 $60.500
PAV SURF PREP FOR MRK (4")
LF 1,505.000 $0.100 $0.168 $0.150 $0.170
PAV SURF PREP FOR MRK (8")
LF 20.000 $0.100 $0.336 $0.300 $0.330
PAV SURF PREP FOR MRK (24")
LF 144.000 $0.900 $0.504 $0.450 $0.500
PAV SURF PREP FOR MRK (ARROW)
EA 5.000 $17.800 $5.600 $5.000 $5.500
PAV SURF PREP FOR MRK (RPM)
EA 67.000 $0.900 $0.280 $0.250 $0.280
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $23,264.900 $12,000.000 $6,500.000 $26,578.380
VEH SIG SEC (12")LED(YEL)
EA 4.000 $222.000 $250.000 $300.000 $330.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $222.000 $250.000 $300.000 $295.350
BACK PLATE (12")(1 SEC)(VENTED)ALUM
EA 12.000 $80.000 $30.000 $85.000 $220.550
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
LF 278.000 $1.800 $1.970 $3.000 $1.880
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 553.000 $2.800 $4.630 $4.000 $2.950
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $524.900 $910.000 $1,000.000 $1,007.290
INS TRF SIG PL AM (MAST)(INSTALL ONLY)
EA 1.000 $625.000 $4,000.000 $6,500.000 $3,422.100
PED POLE ASSEMBLY
EA 1.000 $1,180.000 $890.000 $1,600.000 $1,139.600
PED DETECT PUSH BUTTON (APS)
EA 2.000 $752.700 $825.000 $850.000 $873.400
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,108.200 $3,000.000 $3,500.000 $3,055.800
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 80.000 $101.900 $180.000 $100.000 $37.400
TMA (STATIONARY)
DAY 33.000 $185.800 $272.000 $250.000 $350.000
INSTALLATION OF CELLULAR MODEM
EA 1.000 $50.000 $500.000 $1,000.000 $277.200
Totals: $252,829.300 $234,692.298 $237,446.650 $451,189.490