Show Job Controls
Bid Cobra

BAYLOR US 82 (0156-06-052)

Items: 80

County: BAYLOR
Length: N/A
Highway: US 82
District: WICHITA FALLS
Control Number: 0156-06-052
DBE Goal: N/A
Project: NH 1802(199)
Guaranty: N/A
Time: 212 WORKING DAYS
Engineer's Estimate: $4,131,856.75
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: RE-ALIGN ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$4,131,856.75
$3,745,737.67
Over/Under Est: -9.34% -$386,119.08
$5,372,081.88
Over/Under Est: 30.02% $1,240,225.13
Amt Left: 43.42% $1,626,344.21

Bid Items & Bid Tabulations

80 Total 0 of 80
BAYLOR  |  US 82  |  WICHITA FALLS  |  0156-06-052  |  05/01/2018  |  $4,131,856.75  |  NH 1802(199)  |  RE-ALIGN ROADWAY  |  212 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
DUININCK, INC.
PREPARING ROW
STA 28.110 $2,700.000 $200.000 $1,300.000
REMOVING CONC (PAV)
SY 11,374.000 $5.000 $4.500 $11.000
REMOVE CONC (WINGWALL)
CY 12.000 $200.000 $135.000 $880.000
REMOVE STAB BASE & ASPH PAV (0"-11.25")
SY 7,207.000 $5.000 $3.900 $6.000
REMOVING STAB BASE & ASPH PAV (12"-14")
SY 20,745.000 $5.000 $4.000 $8.700
RMV TRT BASE & ASPH PAV (0"-1.75")
SY 199.000 $10.000 $9.000 $8.500
EXCAVATION (ROADWAY)
CY 13,145.000 $11.000 $5.000 $16.000
SUBGRADE WIDENING (DENS CONT)
STA 7.000 $400.000 $325.000 $1,100.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 29,168.000 $11.000 $7.000 $20.000
COMPOST MANUF TOPSOIL (4")
SY 81,796.000 $1.000 $1.300 $1.150
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 16.900 $700.000 $500.000 $425.000
DRILL SEEDING (TEMP) (WARM)
AC 8.450 $700.000 $403.000 $310.000
DRILL SEEDING (TEMP) (COOL)
AC 8.450 $700.000 $461.000 $365.000
VEGETATIVE WATERING
MG 526.000 $30.000 $15.000 $28.500
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
SY 19,875.000 $16.000 $20.500 $23.000
CEMENT
TON 359.000 $150.000 $168.000 $155.000
CEMENT TREAT(EXIST MATL)(8")
SY 19,875.000 $2.000 $2.800 $4.150
PRIME COAT (MC-30)
GAL 3,975.000 $5.500 $4.400 $4.750
ASPH (AC-20-5TR)
GAL 6,958.000 $5.000 $4.400 $4.700
AGGR(TY-PB GR-4S SAC-B)
CY 169.000 $150.000 $200.000 $205.000
D-GR HMA TY-B PG64-22
TON 6,300.000 $70.000 $95.000 $99.500
D-GR HMA TY-D PG64-22
TON 2,996.000 $150.000 $95.000 $110.000
D-GR HMA TY-D SAC-B PG70-22
TON 3,017.000 $84.000 $108.000 $115.000
PLAN & TEXT ASPH CONC PAV(2" TO 4")
SY 4,472.000 $6.500 $1.500 $5.350
PLANE ASPH CONC PAV (2")
SY 36,735.000 $5.500 $1.250 $1.550
TEMPORARY SPL SHORING
SF 960.000 $15.000 $56.000 $60.500
RIPRAP (CONC)(CL B)
CY 17.000 $160.000 $500.000 $495.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 24.000 $50.000 $340.000 $350.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 338.000 $870.000 $840.000 $870.000
RC PIPE (CL III)(24 IN)
LF 145.000 $100.000 $120.000 $120.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $3,000.000 $5,900.000 $6,000.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 2.000 $10,000.000 $4,800.000 $4,900.000
SET (TY I)(S=2 FT)(HW=3FT)(4:1)(C)
EA 1.000 $18,000.000 $6,600.000 $6,900.000
SET (TY I)(S= 8 FT)(HW= 9 FT)(4:1) (C)
EA 3.000 $26,000.000 $19,000.000 $20,000.000
REMOV STR (SET)
EA 1.000 $1,000.000 $2,200.000 $2,200.000
REMOV STR (LARGE)
EA 1.000 $60,000.000 $8,000.000 $33,000.000
MOBILIZATION
LS 1.000 $300,000.000 $276,000.000 $510,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $10,000.000 $7,500.000 $9,200.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 515.000 $20.000 $25.000 $38.500
ROCK FILTER DAMS (REMOVE)
LF 515.000 $15.000 $5.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 284.000 $20.000 $10.000 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 284.000 $10.000 $2.000 $8.250
TEMP SEDMT CONT FENCE (INSTALL)
LF 425.000 $10.000 $4.900 $4.200
TEMP SEDMT CONT FENCE (REMOVE)
LF 425.000 $5.000 $1.000 $1.100
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 890.000 $10.000 $7.000 $3.950
BIODEG EROSN CONT LOGS (REMOVE)
LF 890.000 $5.000 $2.000 $0.550
CONSTRUCTING DETOURS
SY 2,829.000 $30.000 $42.400 $62.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 3,960.000 $20.000 $35.000 $92.500
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 3,120.000 $10.000 $5.000 $10.500
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 3,960.000 $10.000 $11.000 $8.400
DRIVEWAYS (SURF TREAT)
SY 39.000 $25.000 $52.000 $66.000
RUMBLE STRIPS (SHOULDER)
LF 9,130.000 $0.250 $0.520 $0.790
REMOVE METAL BEAM GUARD FENCE
LF 525.000 $10.000 $3.000 $3.300
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $500.000 $200.000 $330.000
CRASH CUSH ATTEN (INSTL)
EA 3.000 $8,000.000 $8,000.000 $2,700.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $400.000 $1,300.000 $1,400.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $700.000 $1,000.000 $11,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $300.000 $370.000 $220.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 7.000 $650.000 $400.000 $495.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $400.000 $400.000 $550.000
REMOVE SM RD SN SUP&AM
EA 2.000 $200.000 $120.000 $110.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 1.000 $150.000 $95.000 $77.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 7.000 $30.000 $25.000 $27.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 21,160.000 $1.000 $0.320 $0.350
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 17,747.000 $0.750 $0.320 $0.350
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 352.000 $1.000 $1.500 $3.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,150.000 $2.000 $1.100 $1.250
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 30.000 $10.000 $13.000 $22.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000 $150.000 $160.000 $165.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $150.000 $165.000 $185.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 34.000 $30.000 $70.000 $71.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,460.000 $1.000 $0.600 $0.770
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 7,085.000 $1.000 $0.580 $0.750
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 7,516.000 $3.000 $0.580 $0.750
REFL PAV MRKR TY II-A-A
EA 11.000 $3.000 $11.000 $22.000
REFL PAV MRKR TY II-C-R
EA 78.000 $5.000 $8.000 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 35,924.000 $1.000 $0.700 $0.770
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,000.000 $7,500.000 $8,200.000
TMA (STATIONARY)
EA 3.000 $2,500.000 $3,000.000 $18,000.000
TMA (MOBILE OPERATION)
HR 100.000 $35.000 $15.000 $110.000
Totals: $4,131,856.750 $3,745,737.670 $5,372,081.880