BAYLOR US 183 (0125-01-034)

Items: 60

County: BAYLOR
Length: N/A
Highway: US 183
District: WICHITA FALLS
Control Number: 0125-01-034
DBE Goal: N/A
Project: F 2023(090)
Guaranty: N/A
Time: 210 WORKING DAYS
Engineer's Estimate: $6,889,652.35
Date: 09/08/2022 (3 years ago)
Contract Number: N/A
Type: ADDING SHOULDERS WITH NO ADDED CAPACITY
Mail/Deliver Bids To: N/A
ZACHARY HUSEN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$6,889,652.35
$7,724,536.69
Over/Under Est: 12.12% $834,884.34
$7,914,884.10
Over/Under Est: 14.88% $1,025,231.75
Amt Left: 2.46% $190,347.41
$7,974,153.62
Over/Under Est: 15.74% $1,084,501.27
Amt Left: 3.23% $249,616.93
Delta: -0.75% -$59,269.52
Subcontractor Percentage Amount
LANCO TURF & SEEDING, INC. 2.91% $224,784.02
JR WEST TEXAS CONCRETE LLC 2.16% $166,849.99
HJC FARMS, INC. 2.01% $155,263.19
TRAFFIC HIGHWAY MAINTENANCE, LLC 2.00% $154,490.73
CONTRACTORS SERVICE, LTD. 0.77% $59,478.93
CHEROKEE SERVICES 0.23% $17,766.43
Total: 10.08% $778,633.29

Bid Items & Bid Tabulations

60 Total 0 of 60
BAYLOR  |  US 183  |  WICHITA FALLS  |  0125-01-034  |  09/08/2022  |  $6,889,652.35  |  F 2023(090)  |  ADDING SHOULDERS WITH NO ADDED CAPAC...  |  210 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACK BURKETT CO.
A. L. HELMCAMP, INC.
DUININCK, INC.
EXCAVATION (ROADWAY)
CY 5,484.000 $15.000 $11.700 $17.000 $15.500
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 17,479.000 $25.000 $30.710 $20.000 $25.500
BACKFILL (TY A OR B)
STA 289.000 $150.000 $225.000 $360.000 $245.000
BROADCAST SEED (TEMP) (WARM)
SY 151,014.000 $0.100 $0.120 $0.120 $0.130
BROADCAST SEED (TEMP) (COOL)
SY 151,014.000 $0.100 $0.130 $0.120 $0.130
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 302,028.000 $0.150 $0.130 $0.120 $0.120
VEGETATIVE WATERING
MG 1,272.000 $30.000 $40.000 $8.000 $25.500
CEMENT
TON 1,196.000 $160.000 $275.000 $230.000 $245.000
CEMENT TREAT (SUBGRADE) (8")
SY 82,805.000 $3.900 $4.350 $3.900 $3.700
PRIME COAT (MC-30)
GAL 20,702.000 $4.250 $5.000 $6.000 $5.600
PLAN & TEXT CONC PAV(0" TO 1-1/2")
SY 4,236.000 $3.250 $3.000 $5.000 $4.750
RIPRAP (MOW STRIP)(4 IN)
CY 132.000 $600.000 $702.000 $640.000 $620.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 312.000 $25.000 $75.360 $56.000 $68.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 11,273.000 $5.000 $4.040 $9.000 $11.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,250.000 $1,521.000 $0.000 $0.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,800.000 $2,574.000 $0.000 $0.000
REMOV STR (PIPE)
LF 242.000 $25.000 $17.550 $16.000 $15.500
MOBILIZATION
LS 1.000 $609,184.850 $400,000.000 $660,000.000 $690,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $12,000.000 $6,000.000 $10,000.000 $14,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 24,515.000 $3.000 $3.800 $2.500 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 24,515.000 $1.000 $1.170 $0.950 $0.930
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 10,700.000 $3.500 $4.970 $3.000 $3.050
BIODEG EROSN CONT LOGS (REMOVE)
LF 10,700.000 $1.000 $0.880 $0.900 $0.880
DRIVEWAYS (ACP)
SY 639.000 $45.000 $39.000 $67.000 $5.650
DRIVEWAYS (BASE)
SY 1,514.000 $25.000 $18.000 $40.000 $27.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 70,267.000 $0.250 $0.230 $0.200 $0.190
MTL W-BEAM GD FEN (TIM POST)
LF 1,200.000 $25.000 $33.930 $25.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,700.000 $2,925.000 $2,000.000 $2,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 4.000 $1,200.000 $1,784.250 $1,200.000 $1,100.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 4.000 $650.000 $760.500 $850.000 $825.000
REMOVE METAL BEAM GUARD FENCE
LF 900.000 $1.000 $3.510 $3.200 $3.100
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,850.000 $4,299.750 $3,100.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $351.000 $320.000 $310.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 21.000 $550.000 $994.500 $720.000 $705.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $600.000 $1,228.500 $820.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 2.000 $475.000 $1,316.250 $820.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $750.000 $1,433.250 $1,000.000 $980.000
REMOVE SM RD SN SUP&AM
EA 26.000 $90.000 $117.000 $110.000 $105.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 2.000 $25.000 $23.400 $36.000 $31.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 29.000 $45.000 $46.800 $41.000 $40.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 58.000 $100.000 $163.800 $85.000 $82.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,175.000 $1.000 $1.000 $0.650 $1.050
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 140,534.000 $0.900 $0.780 $0.700 $0.690
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 10,735.000 $0.400 $0.560 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 79,086.000 $0.400 $0.530 $0.480 $0.460
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 69.000 $15.000 $29.250 $27.000 $26.000
REFL PAV MRKR TY II-A-A
EA 1,526.000 $3.500 $5.560 $5.000 $4.900
D-GR HMA TY-B PG64-22
TON 19,364.000 $90.000 $97.250 $103.000 $100.000
D-GR HMA TY-D SAC-B PG70-28
TON 23,142.000 $95.000 $118.000 $119.000 $119.460
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 903.000 $95.000 $143.250 $142.000 $135.000
BONDING COURSE
GAL 16,197.000 $3.750 $5.500 $4.200 $3.700
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 110.000 $105.000 $93.600 $0.000 $0.000
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 126.000 $90.000 $70.200 $0.000 $0.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 8.000 $250.000 $526.500 $360.000 $415.000
TMA (STATIONARY)
DAY 190.000 $250.000 $100.000 $250.000 $230.000
TMA (MOBILE OPERATION)
DAY 20.000 $275.000 $1.000 $250.000 $930.000
1
CMP (GAL STL 18 IN)
LF 126.000 $90.000 $0.000 $74.000 $72.000
2
CMP (GAL STL 24 IN)
LF 110.000 $105.000 $0.000 $93.000 $91.000
3
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 6.000 $1,250.000 $0.000 $1,400.000 $1,400.000
4
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 6.000 $1,800.000 $0.000 $1,850.000 $1,800.000
Totals: $6,930,842.350 $7,724,536.690 $7,914,884.100 $7,974,153.620