Show Job Controls
Bid Cobra

BASTROP US0290 (6499-06-001)

Items: 43

County: BASTROP
Length: 0.0100 MILES
Highway: US0290
District: AUSTIN
Control Number: 6499-06-001
DBE Goal: 0.0%
Project: RMC - A00220151
Guaranty: $19,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $970,617.00
Date: 05/13/2026 (28 days ago)
Contract Number: 5261405
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00220151
Project Description: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
7901 N IH 35, AUSTIN, TX 78753
SHANE SWIMM
DIANA SCHULZE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$970,617.00
$600,624.00
Over/Under Est: -38.12% -$369,993.00
Over/Under Est: -21.97% -$213,265.00
Amt Left: 26.09% $156,728.00
Over/Under Est: 0.23% $2,194.00
Amt Left: 61.97% $372,187.00
Delta: -28.45% -$215,459.00
$978,339.00
Over/Under Est: 0.8% $7,722.00
Amt Left: 62.89% $377,715.00
Delta: -0.57% -$5,528.00
Over/Under Est: 24.18% $234,717.00
Amt Left: 100.68% $604,710.00
Delta: -23.20% -$226,995.00
Over/Under Est: 37.64% $365,339.00
Amt Left: 122.43% $735,332.00
Delta: -10.84% -$130,622.00

Bid Items & Bid Tabulations

43 Total 0 of 43
BASTROP  |  US0290  |  AUSTIN  |  6499-06-001  |  05/13/2026  |  $970,617.00  |  RMC - A00220151  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
ROSS SA ENTERPRISE LLC
AUSTIN BARRICADE COMPANY, L.L.C.
RHINO EQUITY, LLC
T&L CLEANING SERVICES LLC
SHALOM SERVICES CORPORATION
REMOV CONC (MOWSTRIP)
LF 1,600.000 $8.000 $1.000 $1.000 $1.000 $0.500 $50.000 $25.000
RIPRAP (MOW STRIP)(4 IN)
CY 150.000 $630.000 $1.000 $1.000 $10.000 $100.000 $400.000 $500.000
MOBILIZATION (CALLOUT 1)
EA 500.000 $400.000 $1.000 $1.000 $0.250 $1.000 $1.000 $100.000
TMA (STATIONARY)
DAY 180.000 $200.000 $1.000 $1.000 $1.000 $1.000 $1.000 $800.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10.000 $4.500 $1.000 $1.000 $8.000 $1.000 $500.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 10.000 $3.000 $1.000 $1.000 $8.000 $1.000 $500.000 $1.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,500.000 $800.000 $1.000 $100.000 $1,400.000 $1,500.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $4.000 $1.000 $1.000 $50.000 $0.500 $1.000 $10.000
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
LF 80.000 $30.000 $1.000 $1.000 $25.000 $20.000 $500.000 $15.000
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 8.000 $2,500.000 $1.000 $1.000 $1,000.000 $2,500.000 $4,000.000 $3,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,300.000 $1.000 $1.000 $400.000 $500.000 $3,000.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $250.000 $1.000 $1.000 $1.000 $50.000 $1,000.000 $300.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 20.000 $23.000 $1,500.000 $1.000 $800.000 $30.000 $15.000 $35.000
INSTL DEL ASSM (D-SY)SZ 2(WC)GND(BI)
EA 4.000 $100.000 $1.000 $1.000 $500.000 $100.000 $15.000 $100.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 5,600.000 $9.000 $0.100 $28.000 $40.000 $30.000 $24.000 $18.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 100.000 $75.000 $20.000 $25.000 $35.000 $100.000 $20.000 $30.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 30.000 $35.000 $1.000 $1.000 $5.000 $1.000 $300.000 $191.000
REPLACE TIMBER POST W/O CONC FND
EA 150.000 $91.000 $250.000 $60.000 $50.000 $100.000 $1.000 $75.000
REPLACE STEEL POST W/O CONC FND
EA 10.000 $30.000 $1.000 $1.000 $55.000 $1.000 $100.000 $65.000
REPLACE TIMBER POST W/ CONC FND
EA 150.000 $101.000 $300.000 $60.000 $50.000 $100.000 $1.000 $70.000
REPLACE STEEL POST W/ CONC FND
EA 8.000 $5.000 $1.000 $1.000 $100.000 $1.000 $100.000 $80.000
REALIGN POSTS
EA 150.000 $125.000 $150.000 $25.000 $50.000 $35.000 $1.000 $20.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $5.000 $1.000 $1.000 $1.000 $1.000 $100.000 $500.000
REM OBSOLETE GET & REPL W/ SGT
EA 130.000 $1,500.000 $1,900.000 $2,900.000 $3,000.000 $3,200.000 $4,000.000 $3,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 6.000 $772.000 $1.000 $400.000 $1,000.000 $800.000 $1,000.000 $1,500.000
REPLACE BLOCKOUT
EA 350.000 $48.000 $10.000 $10.000 $20.000 $30.000 $10.000 $45.000
RESET SGT IMPACT HEAD
EA 20.000 $270.000 $1.000 $1.000 $200.000 $1.000 $1.000 $200.000
REPLACE SGT OBJECT MARKER
EA 4.000 $42.000 $10.000 $1.000 $500.000 $1.000 $1.000 $49.000
REPLACE SGT CABLE ANCHOR
EA 4.000 $223.000 $1.000 $1.000 $500.000 $1.000 $1.000 $95.000
REPLACE SGT CABLE ASSEMBLY
EA 8.000 $132.000 $1.000 $1.000 $1.000 $1.000 $1.000 $100.000
REPLACE SGT STRUT
EA 8.000 $148.000 $1.000 $1.000 $1.000 $1.000 $1.000 $100.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 80.000 $20.000 $80.000 $20.000 $50.000 $1.000 $30.000 $30.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 200.000 $215.000 $165.000 $110.000 $300.000 $200.000 $150.000 $200.000
REPLACE POSTS (TL-4)(NU-CABLE)
EA 20.000 $1.000 $1.000 $1.000 $100.000 $1.000 $1.000 $100.000
REPLACE POSTS (TL-4)(TRINITY)
EA 600.000 $200.000 $250.000 $230.000 $300.000 $215.000 $300.000 $150.000
REPLACE POSTS (TL-4)(BRIFEN)
EA 20.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000 $114.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 20.000 $20.000 $1.000 $1.000 $1.000 $50.000 $150.000 $153.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 80.000 $500.000 $1.000 $200.000 $1.000 $1,000.000 $500.000 $1,000.000
REPLACE CABLE (TL-4)
LF 800.000 $5.000 $0.100 $1.000 $3.000 $1.000 $0.010 $5.000
CHECK / RE-TENSION CABLE (TL-4)
EA 100.000 $44.000 $1.000 $1.000 $1.000 $50.000 $1.000 $123.000
REPLACE (WIDE QUAD)
EA 2.000 $2,500.000 $1.000 $1.000 $2,500.000 $1,500.000 $1.000 $35,000.000
REPAIR (WIDE QUAD)
LF 20.000 $500.000 $400.000 $600.000 $500.000 $750.000 $250.000 $1,000.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 8.000 $395.000 $300.000 $1.000 $500.000 $50.000 $25.000 $1,000.000
Totals: $970,617.000 $600,624.000 $757,352.000 $972,811.000 $978,339.000 $1,205,334.000 $1,335,956.000