Show Job Controls
Bid Cobra

BASTROP US0290 (6327-19-001)

Items: 68

County: BASTROP
Length: N/A
Highway: US0290
District: AUSTIN
Control Number: 6327-19-001
DBE Goal: N/A
Project: RMC - 632719001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $2,975,145.00
Date: 09/06/2018 (7 years ago)
Contract Number: N/A
Type: REPAIR, REPLACE, AND UPGRADE MBGF
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,975,145.00
$2,482,150.00
Over/Under Est: -16.57% -$492,995.00
$2,766,830.00
Over/Under Est: -7% -$208,315.00
Amt Left: 11.47% $284,680.00
Over/Under Est: 30.88% $918,855.00
Amt Left: 56.88% $1,411,850.00
Delta: -40.74% -$1,127,170.00

Bid Items & Bid Tabulations

68 Total 0 of 68
BASTROP  |  US0290  |  AUSTIN  |  6327-19-001  |  09/06/2018  |  $2,975,145.00  |  RMC - 632719001  |  REPAIR, REPLACE, AND UPGRADE MBGF  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
K-BAR SERVICES, INC.
SHORT-LINE CORPORATION
TEXCON GENERAL CONTRACTORS
REMOVING CONC (RIPRAP)
SY 48.000 $480.000 $40.000 $10.000 $60.000
RIPRAP (CONC)(5 IN)
CY 5.000 $600.000 $550.000 $600.000 $680.000
RETROFIT RAIL (TY T221)
LF 100.000 $180.000 $50.000 $100.000 $160.000
MOBILIZATION (CALLOUT)
EA 800.000 $2.500 $0.500 $1.000 $1,000.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 60.000 $50.000 $50.000 $100.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $20.000 $26.000 $25.000 $22.000
MTL W-BEAM GD FEN (STEEL POST)
LF 400.000 $24.000 $20.000 $25.000 $26.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 5,000.000 $15.000 $10.000 $2.500 $12.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 50.000 $1,100.000 $1,500.000 $1,500.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $3.000 $10.000 $15.000 $4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $2,600.000 $2,700.000 $2,000.000 $2,750.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $18,000.000 $15,000.000 $10,000.000 $12,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,400.000 $2,000.000 $5,000.000 $1,600.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,200.000 $2,000.000 $2,500.000 $1,200.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 5.000 $20,000.000 $15,000.000 $15,000.000 $23,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 5.000 $37,000.000 $12,000.000 $25,000.000 $34,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 300.000 $22.000 $40.000 $20.000 $28.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 700.000 $10.000 $40.000 $15.000 $32.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 18,000.000 $24.000 $20.000 $15.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 150.000 $40.000 $30.000 $50.000 $26.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 100.000 $40.000 $30.000 $50.000 $24.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 1,500.000 $50.000 $5.000 $25.000 $34.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 1,500.000 $20.000 $40.000 $125.000 $110.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 400.000 $35.000 $35.000 $25.000 $130.000
REPAIR STEEL POST WITH BASE PLATE
EA 70.000 $140.000 $100.000 $150.000 $210.000
REALIGN POSTS
EA 600.000 $20.000 $5.000 $10.000 $25.000
REMOVE & REPLACE BLOCKOUT
EA 2,000.000 $3.000 $3.000 $75.000 $12.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 50.000 $10.000 $1.000 $10.000 $30.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 3.000 $55.000 $150.000 $50.000 $35.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $80.000 $50.000 $50.000 $120.000
REPLACE HINGED TOP SGT STEEL POST
EA 5.000 $110.000 $150.000 $50.000 $75.000
RESET HINGED TOP SGT STL POST
EA 150.000 $30.000 $1.000 $25.000 $45.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 100.000 $2,750.000 $3,000.000 $2,600.000 $3,200.000
REM & RESET SGT IMPACT HEAD
EA 50.000 $250.000 $250.000 $50.000 $75.000
REPLACE SGT OBJECT MARKER
EA 10.000 $250.000 $50.000 $20.000 $150.000
REPAIR RAIL ELEMENT (W - BEAM) (LABOR)
LF 1,000.000 $15.000 $14.000 $10.000 $21.000
REPAIR SINGLE GUARDRAIL TERMINAL
EA 400.000 $2,000.000 $1,500.000 $1,750.000 $2,100.000
REPLACE POSTS (TL-3)
EA 100.000 $20.000 $10.000 $10.000 $90.000
REPLACE POSTS (TL-4)
EA 500.000 $30.000 $200.000 $125.000 $110.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 2.000 $20.000 $10.000 $50.000 $220.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 30.000 $30.000 $50.000 $100.000 $220.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $20.000 $1.000 $10.000 $240.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 20.000 $30.000 $50.000 $50.000 $300.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 5.000 $900.000 $50.000 $100.000 $500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 50.000 $1,100.000 $600.000 $500.000 $620.000
REPLACE CABLE (TL-3)
LF 1,000.000 $4.000 $1.000 $1.000 $4.000
REPLACE CABLE (TL-4)
LF 1,000.000 $5.000 $5.000 $1.000 $5.100
CHECK / RE-TENSION CABLE
EA 10.000 $500.000 $500.000 $200.000 $200.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $18,000.000 $16,000.000 $18,000.000 $17,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $24,000.000 $24,000.000 $25,000.000 $9,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $18,000.000 $25,000.000 $30,000.000 $12,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $24,000.000 $15,000.000 $35,000.000 $21,000.000
REPAIR (TRACC)
EA 5.000 $3,000.000 $5,000.000 $5,000.000 $3,500.000
REPAIR (WIDE TRACC)
EA 15.000 $5,000.000 $3,000.000 $5,000.000 $2,400.000
REPAIR (NARROW REACT 350)
LF 15.000 $3,000.000 $300.000 $5,000.000 $500.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $18,000.000 $25,000.000 $15,000.000 $21,000.000
REPAIR (NARROW QUAD)
EA 2.000 $3,000.000 $5,000.000 $5,000.000 $2,100.000
REMOVE AND REPLACE (WIDE QUAD)
EA 5.000 $24,000.000 $18,000.000 $20,000.000 $16,000.000
REPAIR (WIDE QUAD)
EA 3.000 $5,000.000 $5,000.000 $5,000.000 $3,000.000
REPAIR (REACT 350) (W)
EA 1.000 $5,000.000 $3,000.000 $5,000.000 $5,000.000
REPAIR (ENERGY ABSORB SYS) (GDRAIL)
EA 5.000 $5,000.000 $500.000 $1,000.000 $1,200.000
REPAIR (BEAT - SSCC)
EA 1.000 $3,000.000 $3,500.000 $5,000.000 $3,500.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 30.000 $100.000 $100.000 $100.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 70.000 $75.000 $150.000 $50.000 $200.000
TMA (STATIONARY)
DAY 70.000 $500.000 $1,000.000 $200.000 $300.000
LANE CLOSURE TYPE 1 (12 HR)
EA 10.000 $1,500.000 $1,800.000 $1,500.000 $1,500.000
LANE CLOSURE TYPE 2 (12 HR)
EA 10.000 $1,500.000 $1,800.000 $1,500.000 $2,000.000
LANE CLOSURE TYPE 3 (12 HR)
EA 50.000 $1,000.000 $600.000 $1,000.000 $2,500.000
Totals: $2,975,145.000 $2,482,150.000 $2,766,830.000 $3,894,000.000