REMOVING CONC (RIPRAP)
|
SY
|
48.000
|
$480.000
|
$40.000
|
$10.000
|
$60.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
5.000
|
$600.000
|
$550.000
|
$600.000
|
$680.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
100.000
|
$180.000
|
$50.000
|
$100.000
|
$160.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
800.000
|
$2.500
|
$0.500
|
$1.000
|
$1,000.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
60.000
|
$50.000
|
$50.000
|
$100.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$20.000
|
$26.000
|
$25.000
|
$22.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
400.000
|
$24.000
|
$20.000
|
$25.000
|
$26.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
5,000.000
|
$15.000
|
$10.000
|
$2.500
|
$12.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
50.000
|
$1,100.000
|
$1,500.000
|
$1,500.000
|
$1,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$3.000
|
$10.000
|
$15.000
|
$4.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
50.000
|
$2,600.000
|
$2,700.000
|
$2,000.000
|
$2,750.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$18,000.000
|
$15,000.000
|
$10,000.000
|
$12,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,400.000
|
$2,000.000
|
$5,000.000
|
$1,600.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,200.000
|
$2,000.000
|
$2,500.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
5.000
|
$20,000.000
|
$15,000.000
|
$15,000.000
|
$23,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
5.000
|
$37,000.000
|
$12,000.000
|
$25,000.000
|
$34,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
300.000
|
$22.000
|
$40.000
|
$20.000
|
$28.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
700.000
|
$10.000
|
$40.000
|
$15.000
|
$32.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
18,000.000
|
$24.000
|
$20.000
|
$15.000
|
$20.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
150.000
|
$40.000
|
$30.000
|
$50.000
|
$26.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
100.000
|
$40.000
|
$30.000
|
$50.000
|
$24.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
1,500.000
|
$50.000
|
$5.000
|
$25.000
|
$34.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
1,500.000
|
$20.000
|
$40.000
|
$125.000
|
$110.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
400.000
|
$35.000
|
$35.000
|
$25.000
|
$130.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
70.000
|
$140.000
|
$100.000
|
$150.000
|
$210.000
|
|
|
REALIGN POSTS
|
EA
|
600.000
|
$20.000
|
$5.000
|
$10.000
|
$25.000
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
2,000.000
|
$3.000
|
$3.000
|
$75.000
|
$12.000
|
|
|
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
|
EA
|
50.000
|
$10.000
|
$1.000
|
$10.000
|
$30.000
|
|
|
REPAIR OF TERMINAL ANCHORS POSTS
|
EA
|
3.000
|
$55.000
|
$150.000
|
$50.000
|
$35.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
10.000
|
$80.000
|
$50.000
|
$50.000
|
$120.000
|
|
|
REPLACE HINGED TOP SGT STEEL POST
|
EA
|
5.000
|
$110.000
|
$150.000
|
$50.000
|
$75.000
|
|
|
RESET HINGED TOP SGT STL POST
|
EA
|
150.000
|
$30.000
|
$1.000
|
$25.000
|
$45.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
100.000
|
$2,750.000
|
$3,000.000
|
$2,600.000
|
$3,200.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
50.000
|
$250.000
|
$250.000
|
$50.000
|
$75.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
10.000
|
$250.000
|
$50.000
|
$20.000
|
$150.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM) (LABOR)
|
LF
|
1,000.000
|
$15.000
|
$14.000
|
$10.000
|
$21.000
|
|
|
REPAIR SINGLE GUARDRAIL TERMINAL
|
EA
|
400.000
|
$2,000.000
|
$1,500.000
|
$1,750.000
|
$2,100.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
100.000
|
$20.000
|
$10.000
|
$10.000
|
$90.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
500.000
|
$30.000
|
$200.000
|
$125.000
|
$110.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
2.000
|
$20.000
|
$10.000
|
$50.000
|
$220.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
30.000
|
$30.000
|
$50.000
|
$100.000
|
$220.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
10.000
|
$20.000
|
$1.000
|
$10.000
|
$240.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
20.000
|
$30.000
|
$50.000
|
$50.000
|
$300.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
5.000
|
$900.000
|
$50.000
|
$100.000
|
$500.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
50.000
|
$1,100.000
|
$600.000
|
$500.000
|
$620.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
1,000.000
|
$4.000
|
$1.000
|
$1.000
|
$4.000
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
1,000.000
|
$5.000
|
$5.000
|
$1.000
|
$5.100
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
10.000
|
$500.000
|
$500.000
|
$200.000
|
$200.000
|
|
|
REMOVE AND REPLACE (TRACC)
|
EA
|
1.000
|
$18,000.000
|
$16,000.000
|
$18,000.000
|
$17,000.000
|
|
|
REMOVE AND REPLACE (WIDE TRACC)
|
EA
|
1.000
|
$24,000.000
|
$24,000.000
|
$25,000.000
|
$9,000.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
1.000
|
$18,000.000
|
$25,000.000
|
$30,000.000
|
$12,000.000
|
|
|
REMOVE AND REPLACE (WIDE REACT 350)
|
EA
|
1.000
|
$24,000.000
|
$15,000.000
|
$35,000.000
|
$21,000.000
|
|
|
REPAIR (TRACC)
|
EA
|
5.000
|
$3,000.000
|
$5,000.000
|
$5,000.000
|
$3,500.000
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
15.000
|
$5,000.000
|
$3,000.000
|
$5,000.000
|
$2,400.000
|
|
|
REPAIR (NARROW REACT 350)
|
LF
|
15.000
|
$3,000.000
|
$300.000
|
$5,000.000
|
$500.000
|
|
|
REMOVE AND REPLACE (NARROW QUAD)
|
EA
|
1.000
|
$18,000.000
|
$25,000.000
|
$15,000.000
|
$21,000.000
|
|
|
REPAIR (NARROW QUAD)
|
EA
|
2.000
|
$3,000.000
|
$5,000.000
|
$5,000.000
|
$2,100.000
|
|
|
REMOVE AND REPLACE (WIDE QUAD)
|
EA
|
5.000
|
$24,000.000
|
$18,000.000
|
$20,000.000
|
$16,000.000
|
|
|
REPAIR (WIDE QUAD)
|
EA
|
3.000
|
$5,000.000
|
$5,000.000
|
$5,000.000
|
$3,000.000
|
|
|
REPAIR (REACT 350) (W)
|
EA
|
1.000
|
$5,000.000
|
$3,000.000
|
$5,000.000
|
$5,000.000
|
|
|
REPAIR (ENERGY ABSORB SYS) (GDRAIL)
|
EA
|
5.000
|
$5,000.000
|
$500.000
|
$1,000.000
|
$1,200.000
|
|
|
REPAIR (BEAT - SSCC)
|
EA
|
1.000
|
$3,000.000
|
$3,500.000
|
$5,000.000
|
$3,500.000
|
|
|
REPAIR (STEEL POST W/ W-BEAM - T101)
|
LF
|
30.000
|
$100.000
|
$100.000
|
$100.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
70.000
|
$75.000
|
$150.000
|
$50.000
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
70.000
|
$500.000
|
$1,000.000
|
$200.000
|
$300.000
|
|
|
LANE CLOSURE TYPE 1 (12 HR)
|
EA
|
10.000
|
$1,500.000
|
$1,800.000
|
$1,500.000
|
$1,500.000
|
|
|
LANE CLOSURE TYPE 2 (12 HR)
|
EA
|
10.000
|
$1,500.000
|
$1,800.000
|
$1,500.000
|
$2,000.000
|
|
|
LANE CLOSURE TYPE 3 (12 HR)
|
EA
|
50.000
|
$1,000.000
|
$600.000
|
$1,000.000
|
$2,500.000
|
|
Totals: |
$2,975,145.000
|
$2,482,150.000
|
$2,766,830.000
|
$3,894,000.000
|