BASTROP CS (0914-18-114)

Items: 47

County: BASTROP
Length: N/A
Highway: CS
District: AUSTIN
Control Number: 0914-18-114
DBE Goal: N/A
Project: BR 2020(714)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $1,032,269.36
Date: 03/05/2020 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,032,269.36
$1,454,554.00
Over/Under Est: 40.91% $422,284.64
Over/Under Est: 58.95% $608,547.39
Amt Left: 12.81% $186,262.75
Over/Under Est: 69.65% $719,010.76
Amt Left: 20.4% $296,726.12
Delta: -6.73% -$110,463.37
Over/Under Est: 79.16% $817,164.64
Amt Left: 27.15% $394,880.00
Delta: -5.60% -$98,153.88

Bid Items & Bid Tabulations

47 Total 0 of 47
BASTROP  |  CS  |  AUSTIN  |  0914-18-114  |  03/05/2020  |  $1,032,269.36  |  BR 2020(714)  |  BRIDGE REPL  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
CHASCO CONSTRUCTORS
CAPITAL EXCAVATION COMPANY
HILL COUNTRY BRIDGE, INC.
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 7.000 $2,000.000 $5,000.000 $5,500.000 $5,200.000 $23,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 400.000 $15.000 $30.000 $48.950 $55.000 $75.000
SPEC EXCAV WORK (VEHICLE)
CY 600.000 $15.000 $17.500 $48.300 $27.000 $50.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,345.000 $2.500 $2.000 $11.000 $5.400 $4.500
BROADCAST SEED (TEMP) (WARM)
SY 673.000 $0.350 $1.500 $1.250 $1.350 $1.500
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 1,345.000 $1.000 $1.200 $0.700 $0.800 $1.000
VEGETATIVE WATERING
MG 20.000 $25.000 $40.000 $24.700 $200.000 $75.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 1,345.000 $2.000 $2.000 $1.800 $2.000 $2.250
D-GR HMA(SQ) TY-B PG64-22
TON 580.000 $95.000 $88.000 $90.000 $142.000 $85.000
D-GR HMA(SQ) TY-D SAC-B PG76-22
TON 56.000 $125.000 $244.000 $240.000 $450.000 $150.000
TACK COAT
GAL 55.000 $4.000 $17.000 $16.150 $25.000 $10.000
PLANE ASPH CONC PAV(0" TO 12")
SY 496.000 $15.000 $22.000 $29.850 $31.450 $10.000
CEM STABIL BKFL
CY 220.000 $140.000 $120.000 $205.000 $155.000 $150.000
TEMPORARY SPL SHORING
SF 400.000 $20.000 $10.000 $34.200 $60.000 $25.000
DRILL SHAFT (18 IN)
LF 180.000 $150.000 $120.000 $231.000 $210.000 $300.000
DRILL SHAFT (42 IN)
LF 360.000 $290.000 $585.000 $450.000 $462.000 $500.000
CL B CONC (FLUME)
CY 4.000 $450.000 $675.000 $1,110.000 $760.000 $1,250.000
CL C CONC (ABUT)
CY 73.000 $750.000 $750.000 $1,150.000 $1,025.000 $1,000.000
REINF CONC SLAB
SF 4,590.000 $15.000 $18.000 $22.200 $26.650 $30.000
APPROACH SLAB
CY 51.400 $450.000 $430.000 $830.000 $620.000 $625.000
PRESTR CONC GIRDER (TX62)
LF 672.500 $150.000 $300.000 $233.000 $389.750 $350.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 650.000 $125.000 $180.000 $227.000 $200.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 27.500 $450.000 $550.000 $700.000 $700.000 $650.000
RAIL (TY C223)
LF 350.000 $115.000 $160.000 $173.000 $179.250 $200.000
ARMOR JOINT (SEALED)
LF 60.000 $80.000 $80.000 $107.000 $105.000 $115.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $40,000.000 $103,410.000 $22,700.000 $121,000.000 $50,000.000
MOBILIZATION
LS 1.000 $78,928.810 $140,000.000 $140,000.000 $160,000.000 $165,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,000.000 $3,500.000 $5,000.000 $3,345.000 $30,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 160.000 $35.000 $47.000 $50.000 $52.250 $55.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $15.000 $10.000 $31.000 $32.650 $35.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 915.000 $2.500 $3.000 $4.250 $4.350 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 915.000 $1.000 $1.000 $1.250 $1.100 $1.250
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $20.000 $22.000 $22.000 $23.550 $22.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 25.000 $35.000 $40.000 $65.800 $80.200 $70.000
MTL BEAM GD FEN TRANS (TL2)
EA 3.000 $1,000.000 $1,000.000 $745.000 $914.000 $800.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 25.000 $20.000 $23.000 $20.650 $23.550 $22.500
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,500.000 $2,500.000 $3,000.000 $3,100.000 $3,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $450.000 $1,100.000 $590.000 $820.000 $650.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $20.000 $55.000 $15.000 $20.000 $16.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 22.000 $25.000 $55.000 $19.950 $35.000 $20.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 1,350.000 $0.150 $0.350 $0.500 $0.550 $0.550
REFL PAV MRK TY II (Y) 4" (SLD)
LF 1,350.000 $0.150 $0.400 $0.500 $0.550 $0.550
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,350.000 $0.350 $0.750 $1.500 $1.600 $1.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,350.000 $0.350 $0.750 $1.500 $1.600 $1.500
REFL PAV MRKR TY II-A-A
EA 10.000 $5.000 $8.000 $7.000 $7.600 $7.500
NO. OF WORKING DAYS
$/D 2,000.000 $76.000 $72.000 $76.000 $76.000 $66.000
TEMP CONSTRUCTION ACCESS
LS 1.000 $50,000.000 $50,000.000 $185,000.000 $64,000.000 $50,000.000
Totals: $1,032,269.360 $1,454,554.000 $1,640,816.750 $1,751,280.125 $1,849,434.000