BASTROP CR (0914-18-111)

Items: 39

County: BASTROP
Length: N/A
Highway: CR
District: AUSTIN
Control Number: 0914-18-111
DBE Goal: N/A
Project: BR 2B20(289)
Guaranty: N/A
Time: 93 WORKING DAYS
Engineer's Estimate: $713,795.74
Date: 06/01/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$713,795.74
$964,123.30
Over/Under Est: 35.07% $250,327.56
Over/Under Est: 36.61% $261,299.13
Amt Left: 1.14% $10,971.57
$1,032,028.65
Over/Under Est: 44.58% $318,232.91
Amt Left: 7.04% $67,905.35
Delta: -5.84% -$56,933.78
$1,078,882.20
Over/Under Est: 51.15% $365,086.46
Amt Left: 11.9% $114,758.90
Delta: -4.54% -$46,853.55
Over/Under Est: 53.98% $385,281.36
Amt Left: 14% $134,953.80
Delta: -1.87% -$20,194.90
Over/Under Est: 71.31% $509,024.76
Amt Left: 26.83% $258,697.20
Delta: -11.26% -$123,743.40
$1,742,939.90
Over/Under Est: 144.18% $1,029,144.16
Amt Left: 80.78% $778,816.60
Delta: -42.53% -$520,119.40

Bid Items & Bid Tabulations

39 Total 0 of 39
BASTROP  |  CR  |  AUSTIN  |  0914-18-111  |  06/01/2022  |  $713,795.74  |  BR 2B20(289)  |  BRIDGE REPL  |  93 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
FUQUA CONSTRUCTION CO., INC.
SB CONTRACTORS LLC
CHASCO CONSTRUCTORS
HILL COUNTRY BRIDGE, INC.
ACME BRIDGE COMPANY, INC.
RELMCO, INC.
PREPARING ROW
STA 6.640 $4,000.000 $5,000.000 $7,004.400 $3,500.000 $6,000.000 $4,420.000 $7,060.000 $15,000.000
EXCAVATION (ROADWAY)
CY 216.000 $10.000 $20.000 $9.636 $46.940 $50.000 $20.400 $40.800 $50.000
EXCAVATION (CHANNEL)
CY 547.000 $15.000 $30.000 $9.708 $17.850 $50.000 $20.400 $34.000 $50.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 262.000 $15.000 $30.000 $10.548 $27.310 $25.000 $15.850 $47.000 $50.000
FURNISHING AND PLACING TOPSOIL (4")
SY 3,404.000 $0.990 $2.000 $1.212 $10.310 $2.000 $1.150 $4.050 $5.000
BROADCAST SEED (TEMP) (WARM)
SY 778.000 $0.570 $0.050 $0.132 $2.530 $2.500 $1.400 $2.350 $5.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 1,556.000 $0.320 $0.400 $0.468 $1.960 $2.000 $1.350 $1.800 $4.000
VEGETATIVE WATERING
MG 40.000 $26.500 $8.000 $10.056 $69.000 $35.000 $205.000 $115.000 $60.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 1,556.000 $1.000 $5.000 $1.608 $1.960 $2.000 $1.700 $1.800 $5.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 329.000 $50.000 $80.000 $57.048 $133.010 $100.000 $139.400 $155.000 $200.000
CEMENT
TON 16.000 $159.000 $220.000 $214.428 $276.340 $150.000 $283.250 $426.000 $500.000
CEMENT TREAT (NEW BASE) (6")
SY 624.000 $4.330 $2.000 $1.716 $24.590 $10.000 $9.050 $14.600 $35.000
CEM STABIL BKFL
CY 106.000 $140.000 $160.000 $84.456 $140.100 $180.000 $206.750 $258.000 $200.000
PRESTR CONC PIL (18 IN SQ)
LF 520.000 $100.000 $120.000 $66.468 $0.010 $0.010 $0.010 $0.010 $550.000
DRILL SHAFT (24 IN)
LF 456.000 $140.000 $200.000 $192.972 $217.230 $300.000 $240.500 $273.000 $325.000
CL C CONC (ABUT)
CY 37.200 $800.000 $1,200.000 $1,260.768 $1,281.580 $2,000.000 $1,515.000 $1,770.000 $2,500.000
REINF CONC SLAB (SLAB BEAM)
SF 2,600.000 $13.500 $20.000 $20.892 $38.020 $40.000 $33.750 $30.200 $35.000
APPROACH SLAB
CY 77.200 $450.000 $800.000 $535.980 $613.410 $800.000 $945.000 $941.000 $1,500.000
PRESTR CONC SLAB BEAM (5SB15)
LF 495.000 $185.000 $220.000 $221.628 $302.200 $300.000 $278.500 $382.000 $300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 308.000 $120.000 $160.000 $168.612 $161.280 $240.000 $226.150 $230.000 $205.000
RIPRAP (MOW STRIP)(4 IN)
CY 52.000 $500.000 $600.000 $569.172 $527.490 $600.000 $920.000 $1,020.000 $550.000
RAIL (TY T631)
LF 348.000 $88.000 $200.000 $107.304 $63.550 $40.000 $85.000 $90.500 $93.500
ARMOR JOINT (SEALED)
LF 88.000 $150.000 $140.000 $131.712 $233.340 $120.000 $100.000 $154.000 $185.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $25,000.000 $19,999.000 $30,235.392 $9,408.740 $7,500.000 $24,650.000 $16,000.000 $35,000.000
MOBILIZATION
LS 1.000 $58,562.000 $70,000.000 $127,185.000 $100,000.000 $90,000.000 $109,750.000 $98,800.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,700.000 $5,000.000 $9,223.536 $3,000.000 $1,500.000 $4,440.000 $4,340.000 $6,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 84.000 $35.000 $40.000 $35.772 $40.300 $40.000 $56.650 $37.300 $40.000
ROCK FILTER DAMS (REMOVE)
LF 84.000 $9.500 $10.000 $10.992 $34.550 $35.000 $28.300 $31.900 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,153.000 $2.440 $5.000 $3.012 $4.600 $6.000 $4.000 $4.250 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,153.000 $0.720 $1.000 $0.720 $1.150 $2.000 $1.100 $1.050 $4.000
CONSTRUCTING DETOURS
SY 200.000 $50.000 $80.000 $70.944 $176.380 $60.000 $126.900 $250.000 $200.000
MTL W-BEAM GD FEN (TIM POST)
LF 790.000 $21.500 $30.000 $30.612 $27.510 $22.000 $27.750 $26.100 $26.950
MTL BEAM GD FEN TRANS (TL2)
EA 8.000 $1,300.000 $1,400.000 $1,659.348 $1,438.160 $500.000 $950.000 $1,010.000 $1,045.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,700.000 $3,600.000 $3,491.352 $3,716.870 $3,600.000 $3,455.000 $3,250.000 $3,355.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $470.000 $600.000 $709.008 $802.560 $800.000 $793.000 $745.000 $770.000
REMOVE SM RD SN SUP&AM
EA 3.000 $90.000 $200.000 $109.272 $115.140 $200.000 $170.000 $21.300 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $25.000 $30.000 $27.876 $28.780 $28.000 $22.000 $20.200 $20.900
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $45.000 $35.000 $36.120 $34.550 $35.000 $27.000 $25.600 $26.400
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 128.000 $110.000 $150.000 $284.640 $318.950 $500.000 $361.000 $295.000 $300.000
Totals: $713,795.740 $964,123.300 $975,095.038 $1,032,028.658 $1,078,882.200 $1,099,077.100 $1,222,820.500 $1,742,939.900