Show Job Controls
Bid Cobra

BASTROP SH 71 (0265-05-089)

Items: 59

County: BASTROP
Length: N/A
Highway: SH 71
District: AUSTIN
Control Number: 0265-05-089
DBE Goal: N/A
Project: STP 2023(734)HES
Guaranty: N/A
Time: 57 WORKING DAYS
Engineer's Estimate: $1,020,078.74
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,020,078.74
$1,108,815.55
Over/Under Est: 8.7% $88,736.81
Over/Under Est: 8.73% $89,085.26
Amt Left: 0.03% $348.45
Over/Under Est: 20.54% $209,572.39
Amt Left: 10.9% $120,835.58
Delta: -10.86% -$120,487.13
$1,478,202.50
Over/Under Est: 44.91% $458,123.76
Amt Left: 33.31% $369,386.95
Delta: -20.21% -$248,551.37

Bid Items & Bid Tabulations

59 Total 0 of 59
BASTROP  |  SH 71  |  AUSTIN  |  0265-05-089  |  05/04/2023  |  $1,020,078.74  |  STP 2023(734)HES  |  INTERS IMPRV  |  57 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
AARON CONCRETE CONTRACTORS, LLC
ACME BRIDGE COMPANY, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 26.875 $6,500.000 $3,000.000 $1,500.000 $2,500.000 $3,500.000
EXCAVATION (ROADWAY)
CY 3,658.000 $18.650 $17.000 $17.000 $15.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 6,005.000 $19.680 $21.000 $23.000 $25.000 $35.000
BLADING
HR 40.000 $202.250 $100.000 $450.000 $207.000 $200.000
FURNISHING AND PLACING TOPSOIL (4")
SY 6,300.000 $1.630 $2.500 $2.150 $2.800 $10.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 6,300.000 $0.330 $0.250 $0.300 $0.340 $1.000
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 6,300.000 $0.500 $0.200 $0.300 $0.270 $1.000
VEGETATIVE WATERING
MG 75.000 $33.010 $15.000 $35.000 $72.800 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 3,600.000 $1.390 $1.250 $1.400 $1.450 $8.500
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 2,700.000 $1.760 $1.250 $1.400 $1.450 $10.000
CUT & RESTORING PAV
SY 160.000 $128.020 $155.000 $126.000 $177.000 $762.000
RIPRAP (MOW STRIP)(4 IN)
CY 35.000 $646.760 $700.000 $550.000 $750.000 $1,350.000
RC PIPE (CL III)(18 IN)
LF 230.000 $80.600 $110.000 $160.000 $154.000 $95.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 12.000 $1,524.560 $2,250.000 $3,000.000 $3,000.000 $1,850.000
REMOV STR (SET)
EA 3.000 $951.530 $500.000 $800.000 $500.000 $500.000
REMOV STR (PIPE)
LF 140.000 $23.500 $30.000 $58.000 $50.000 $50.000
MOBILIZATION
LS 1.000 $76,000.000 $110,000.000 $100,000.000 $110,000.000 $140,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $9,837.440 $22,500.000 $6,200.000 $15,400.000 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 80.000 $4.770 $15.000 $18.000 $19.300 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 80.000 $1.550 $2.000 $1.500 $1.500 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 150.000 $5.360 $4.000 $5.000 $4.750 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 150.000 $2.710 $2.000 $1.300 $1.500 $9.000
DRIVEWAYS (ACP)
SY 360.000 $73.560 $85.000 $80.000 $131.000 $56.000
CABLE BARRIER SYSTEM (TL-3)
LF 700.000 $17.420 $35.000 $33.000 $38.400 $60.000
CABLE BARRIER TERMINAL SECTION (TL-3)
EA 2.000 $4,611.270 $6,000.000 $4,300.000 $5,000.000 $5,000.000
REMOVE CABLE BARRIER
LF 700.000 $3.110 $4.000 $9.000 $6.800 $20.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 3.000 $346.670 $300.000 $380.000 $401.000 $850.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $360.000 $405.000 $513.000 $546.000 $850.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 7.000 $882.710 $650.000 $764.000 $813.000 $1,100.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)SRF
EA 5.000 $95.330 $110.000 $140.000 $148.000 $100.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 812.000 $0.440 $0.500 $0.350 $0.810 $1.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 3,263.000 $0.260 $0.600 $0.300 $0.810 $1.000
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 350.000 $1.200 $3.500 $1.500 $3.400 $6.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 50.000 $4.610 $7.000 $4.500 $6.800 $20.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 812.000 $0.270 $0.700 $0.350 $1.000 $1.000
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
LF 325.000 $2.200 $3.500 $1.500 $3.400 $6.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 3,312.000 $1.880 $1.800 $1.100 $0.830 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,312.000 $1.030 $1.500 $1.100 $0.830 $1.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,200.000 $2.020 $2.900 $1.850 $1.650 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 550.000 $1.390 $3.600 $1.500 $2.050 $6.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 350.000 $5.290 $13.600 $4.400 $5.400 $10.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 1,656.000 $0.290 $3.600 $0.300 $0.610 $1.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 812.000 $0.520 $1.400 $0.900 $0.880 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,263.000 $0.500 $1.400 $0.700 $0.880 $1.000
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 1,656.000 $0.920 $2.800 $2.550 $1.150 $1.000
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 1,656.000 $0.880 $2.800 $2.550 $1.200 $1.000
REFL PAV MRKR TY I-A
EA 812.000 $3.570 $2.500 $4.600 $7.500 $6.000
REFL PAV MRKR TY I-C
EA 812.000 $7.590 $2.500 $4.600 $7.500 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 11,543.000 $0.680 $0.700 $0.900 $0.540 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 2,400.000 $1.000 $1.500 $1.100 $1.100 $6.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 1,481.000 $110.450 $135.000 $163.000 $184.000 $140.000
D-GR HMA TY-D PG 76-22 SAC-B (EXEMPT)
TON 448.000 $166.430 $172.000 $235.000 $241.000 $190.000
BONDING COURSE
GAL 367.000 $5.260 $3.850 $21.000 $5.800 $10.000
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 3,803.000 $4.020 $5.500 $6.000 $6.110 $6.000
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 3,803.000 $1.070 $1.500 $1.300 $1.350 $2.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $12,962.750 $12,000.000 $12,800.000 $10,000.000 $10,000.000
TMA (STATIONARY)
DAY 62.000 $252.930 $200.000 $290.000 $172.000 $250.000
TMA (MOBILE OPERATION)
DAY 10.000 $198.870 $500.000 $870.000 $602.000 $550.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 1.000 $3,600.000 $550.000 $2,900.000 $3,000.000 $5,000.000
Totals: $1,020,078.740 $1,108,815.550 $1,109,164.000 $1,229,651.130 $1,478,202.500