Bid Cobra

BASTROP SH 71 (0265-05-088)

Items: 36

County: BASTROP
Length: N/A
Highway: SH 71
District: AUSTIN
Control Number: 0265-05-088
DBE Goal: N/A
Project: C 265-5-88
Guaranty: N/A
Time: 78 WORKING DAYS
Engineer's Estimate: $1,616,659.50
Date: 06/29/2022 (3 years ago)
Contract Number: N/A
Type: LANDSCAPE DEVELOPMENT
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,616,659.50
$1,511,894.66
Over/Under Est: -6.48% -$104,764.84
Over/Under Est: 20.26% $327,482.00
Amt Left: 28.59% $432,246.84
$2,134,143.15
Over/Under Est: 32.01% $517,483.65
Amt Left: 41.16% $622,248.49
Delta: -9.77% -$190,001.65
Over/Under Est: 34.08% $550,911.50
Amt Left: 43.37% $655,676.34
Delta: -1.57% -$33,427.85
Over/Under Est: 40.78% $659,286.08
Amt Left: 50.54% $764,050.92
Delta: -5.00% -$108,374.58
Subcontractor Percentage Amount
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

36 Total 0 of 36
BASTROP  |  SH 71  |  AUSTIN  |  0265-05-088  |  06/29/2022  |  $1,616,659.50  |  C 265-5-88  |  LANDSCAPE DEVELOPMENT  |  78 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
APEX LANDSCAPE & IRRIGATION, LLC
CENTRAL NORTH CONSTRUCTION, LLC
ENCINO LANDSCAPE, INC.
TIGHT LINE CONSTRUCTION, LLC
YELLOWSTONE LANDSCAPE - CENTRAL, INC.
REMOVING CONCRETE(MOW STRIP)
LF 200.000 $4.000 $8.220 $25.000 $10.000 $10.000 $2.875
REMOVING STAB BASE & ASPH PAV (12")
SY 1,516.000 $7.000 $8.410 $25.000 $20.000 $20.000 $17.590
GENERAL USE COMPOST (4")
SY 15,801.000 $4.500 $4.340 $3.500 $4.000 $6.000 $4.957
IRRIGATION SYSTEM
LS 1.000 $15,500.000 $39,200.000 $86,930.000 $15,000.000 $25,000.000 $36,181.250
IRRIGATION SYSTEM LOCATION B
LS 1.000 $65,100.000 $45,000.000 $125,000.000 $75,000.000 $75,000.000 $151,155.417
IRRIGATION SYSTEM LOCATION C
LS 1.000 $74,400.000 $45,000.000 $87,641.500 $100,000.000 $65,000.000 $119,495.833
WILDFLOWER SEEDING
AC 59.460 $1,000.000 $1,350.000 $750.000 $2,500.000 $1,200.000 $3,083.305
PLANT MATERIAL (5-GAL)
EA 12,252.000 $25.000 $25.000 $19.500 $35.000 $30.000 $11.563
PLANT MATERIAL (15-GAL)
EA 909.000 $90.000 $120.000 $115.000 $140.000 $140.000 $135.680
PLANT MATERIAL (30-GAL)
EA 239.000 $190.000 $240.000 $240.000 $260.000 $250.000 $258.020
MULCH
SY 15,801.000 $4.000 $2.260 $2.250 $3.000 $5.000 $3.850
PLANT SOIL MIX
CY 1,946.000 $60.000 $45.000 $35.000 $60.000 $55.000 $38.369
PLANT BED PREPARATION
SY 15,801.000 $3.000 $0.500 $3.000 $2.000 $3.000 $0.348
PLANT MAINTENANCE
MO 72.000 $250.000 $750.000 $1,250.000 $1,000.000 $1,000.000 $1,967.593
PLANT REPLACEMENT (5-GAL)
EA 1,220.000 $25.000 $1.000 $1.000 $1.000 $1.000 $12.090
IRRIGATION SYSTEM OPER AND MAINT
MO 72.000 $200.000 $800.000 $2,000.000 $1,000.000 $1,000.000 $1,574.074
PLANT REPLACEMENT (15 GAL)
EA 80.000 $90.000 $5.000 $40.000 $1.000 $1.000 $131.250
PLANT REPLACEMENT (30 GAL)
EA 20.000 $190.000 $5.000 $60.000 $1.000 $1.000 $150.000
TRENCH EXCAVATION PROTECTION
LF 150.000 $4.000 $0.200 $4.000 $20.000 $1.000 $9.722
TEMPORARY SPL SHORING
SF 150.000 $12.000 $0.200 $12.000 $1.000 $1.000 $18.889
CL B CONC (MISC)
CY 60.000 $200.000 $550.000 $750.000 $800.000 $750.000 $1,002.222
RETAINING WALL (SPREAD FOOTING)
SF 4,520.000 $50.000 $45.000 $84.000 $50.000 $85.000 $80.937
RETAINING WALL (BRICK VENEER)
SF 4,520.000 $30.000 $25.000 $12.000 $10.000 $20.000 $28.909
RETAINING WALL (SPECIAL)
SF 1,267.000 $30.000 $30.000 $24.000 $40.000 $35.000 $86.512
RIPRAP (CONC)(5 IN)
CY 15.000 $500.000 $2.000 $750.000 $1,000.000 $1.000 $586.806
MOBILIZATION
LS 1.000 $87,311.000 $71,400.000 $85,000.000 $180,000.000 $200,000.000 $168,193.813
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,000.000 $4,750.000 $4,500.000 $5,000.000 $4,000.000 $2,222.222
SANDBAGS FOR EROSION CONTROL
EA 200.000 $5.000 $0.100 $8.000 $1.000 $2.000 $5.167
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $2.000 $0.100 $2.000 $3.000 $7.000 $3.167
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $1.000 $0.100 $0.750 $1.000 $2.000 $0.361
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 8,415.000 $4.000 $0.100 $4.200 $10.000 $4.000 $3.565
BIODEG EROSN CONT LOGS (REMOVE)
LF 8,415.000 $1.000 $0.100 $0.750 $0.010 $1.000 $0.218
TREE REMOVAL (18" - 24" DIA)
EA 7.000 $500.000 $850.000 $900.000 $2,000.000 $1,500.000 $404.762
TREE TRIMMING
EA 16.000 $100.000 $200.000 $500.000 $1,000.000 $1,000.000 $114.583
TREE PROTECTION
EA 36.000 $100.000 $100.000 $220.000 $500.000 $300.000 $393.519
TMA (STATIONARY)
DAY 30.000 $180.000 $10.000 $300.000 $300.000 $1.000 $522.222
Totals: $1,616,659.500 $1,511,894.660 $1,944,141.500 $2,134,143.150 $2,167,571.000 $2,275,945.664