BASTROP SH 71 (0265-05-081)

Items: 30

County: BASTROP
Length: N/A
Highway: SH 71
District: AUSTIN
Control Number: 0265-05-081
DBE Goal: N/A
Project: NH 1702(548)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $625,754.50
Date: 07/12/2017 (8 years ago)
Contract Number: N/A
Type: LANDSCAPE AND IRRIGATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$625,754.50
Over/Under Est: -3.16% -$19,754.50
Over/Under Est: 2.18% $13,654.70
Amt Left: 5.51% $33,409.20
Over/Under Est: 30.86% $193,121.81
Amt Left: 35.13% $212,876.31
Delta: -28.07% -$179,467.11

Bid Items & Bid Tabulations

30 Total 0 of 30
BASTROP  |  SH 71  |  AUSTIN  |  0265-05-081  |  07/12/2017  |  $625,754.50  |  NH 1702(548)  |  LANDSCAPE AND IRRIGATION  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
APEX LANDSCAPE & IRRIGATION, LLC
ENCINO LANDSCAPE, INC.
YELLOWSTONE LANDSCAPE - CENTRAL, INC.
GENERAL USE COMPOST (4")
SY 8,887.000 $4.500 $5.500 $3.000 $4.935
IRRIGATION SYSTEM LOCATION A
LS 1.000 $80,000.000 $91,074.880 $100,000.000 $70,558.626
IRRIGATION SYSTEM LOCATION B
LS 1.000 $55,000.000 $33,000.000 $50,000.000 $21,362.521
WILDFLOWER SEEDING
AC 6.400 $2,000.000 $1,500.000 $2,000.000 $2,449.046
PLANT MATERIAL (1-GAL)
EA 2,101.000 $10.000 $8.000 $10.000 $5.845
MULCH
SY 9,938.000 $3.500 $5.500 $3.000 $3.719
LANDSCAPE EDGE
LF 1,494.000 $10.000 $15.000 $15.000 $17.987
PLANT BED PREPARATION
SY 8,887.000 $3.000 $2.000 $3.000 $0.494
PLANT MATERIAL (5 GAL) (TREE)
EA 1,199.000 $26.000 $26.000 $30.000 $14.632
PLANT MATERIAL (15 GAL) (TREE)
EA 197.000 $130.000 $120.000 $100.000 $80.150
PLANT MATERIAL (30 GAL) (TREE)
EA 30.000 $275.000 $240.000 $225.000 $105.263
PLANT MATERIAL (65 GAL) (TREE)
EA 45.000 $550.000 $500.000 $400.000 $311.891
PLANT MATERIAL (1 GAL) (SHRUB)
EA 2,444.000 $10.000 $8.000 $10.000 $3.230
PLANT MATERIAL (5 GAL) (SHRUB)
EA 269.000 $30.000 $26.000 $30.000 $14.348
PLANT MAINTENANCE LOCATION A
MO 24.000 $1,200.000 $1,500.000 $1,000.000 $7,175.172
PLANT MAINTENANCE LOCATION B
MO 24.000 $1,200.000 $750.000 $500.000 $5,004.574
IRRIG SYS OPER AND MAINT LOCATION A
MO 24.000 $600.000 $700.000 $500.000 $909.123
IRRIG SYS OPER AND MAINT LOCATION B
MO 24.000 $500.000 $500.000 $500.000 $909.123
TRENCH EXCAVATION PROTECTION
LF 100.000 $10.000 $0.010 $0.010 $18.013
TEMPORARY SPL SHORING
SF 150.000 $10.000 $0.010 $0.010 $97.081
RIPRAP (CONC)(5 IN)
CY 2.000 $550.000 $0.010 $1,000.000 $1,190.289
RIPRAP (MOW STRIP)(4 IN)
CY 52.500 $500.000 $600.000 $800.000 $989.984
MOBILIZATION
LS 1.000 $51,700.000 $61,000.000 $60,000.000 $80,701.754
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $3,000.000 $3,000.000 $2,000.000 $3,197.221
SANDBAGS FOR EROSION CONTROL
EA 70.000 $5.000 $0.010 $0.010 $2.592
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,550.000 $2.500 $0.010 $3.000 $1.925
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,550.000 $0.500 $0.010 $1.000 $0.223
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,040.000 $5.000 $0.010 $8.000 $4.872
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.000 $0.010 $1.000 $0.223
TREE PROTECTION
EA 73.000 $225.000 $60.000 $500.000 $19.413
Totals: $625,754.500 $606,000.000 $639,409.200 $818,876.410