BASTROP SH 71 (0265-03-043)

Items: 295

County: BASTROP
Length: 2.4500 MILES
Highway: SH 71
District: AUSTIN
Control Number: 0265-03-043
DBE Goal: 9.0%
Project: F 2024(527)
Guaranty: $100,000.00
Time: 589 WORKING DAYS
Engineer's Estimate: $67,216,534.77
Date: 06/04/2025 (1 year ago)
Contract Number: 6253002
Type: HIGHWAY IMPROVEMENT
Project ID: A00060771
Contract Type: Federal
Project Description: CONSTRUCT OVERPASS & ADD 2-LANE ONE-WAY EB & WB FRONTAGE ROADS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DIANA SCHULZE
SHANE SWIMM
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$67,216,534.77
$58,558,558.86
Over/Under Est: -12.88% -$8,657,975.91
Over/Under Est: -11.63% -$7,816,671.82
Amt Left: 1.44% $841,304.09
Over/Under Est: -8.45% -$5,676,907.64
Amt Left: 5.09% $2,981,068.27
Delta: -3.60% -$2,139,764.18
Over/Under Est: -5.29% -$3,557,380.28
Amt Left: 8.71% $5,100,595.63
Delta: -3.44% -$2,119,527.36
Over/Under Est: -4.23% -$2,842,096.76
Amt Left: 9.93% $5,815,879.15
Delta: -1.12% -$715,283.52
Over/Under Est: -3.54% -$2,376,510.77
Amt Left: 10.73% $6,281,465.14
Delta: -0.72% -$465,585.99
$67,604,552.80
Over/Under Est: 0.58% $388,018.03
Amt Left: 15.45% $9,045,993.94
Delta: -4.26% -$2,764,528.80
$68,040,789.59
Over/Under Est: 1.23% $824,254.82
Amt Left: 16.19% $9,482,230.73
Delta: -0.65% -$436,236.79
Over/Under Est: 2.13% $1,432,164.55
Amt Left: 17.23% $10,090,140.46
Delta: -0.89% -$607,909.73
Subcontractor Percentage Amount
TEXAS HIGHWAY WALLS 9.50% $5,537,689.31
TEXAS MATERIALS GROUP, INC. 8.91% $5,193,769.66
ROYAL VISTA INC. 7.91% $4,610,854.99
THIRD COAST SERVICES LLC 4.96% $2,891,256.73
J ARBOR CONTRACTING LLC. 1.38% $804,422.24
ANCORTEX, INC. 1.11% $647,035.28
STRIPE IT UP, LLC 0.94% $547,939.78
ROADWAY SPECIALTIES, INC. 0.93% $542,110.64
OSCAR ORDUNO, INC. 0.53% $308,944.77
STATEWIDE MATERIALS TRANSPORT, LTD. 0.51% $297,286.48
K. L. DURHAM CONSTRUCTION, L.L.C. 0.48% $279,799.04
TORO BRAVO CONSTRUCTION, LLC 0.47% $273,969.89
AARON CONCRETE CONTRACTORS, LLC 0.46% $268,140.75
SCOTT DERR PAINTING CO, LLC 0.05% $29,145.73
A&J REBAR LLC 0.04% $23,316.59
JOE KING MASONRY 0.02% $11,658.29
Total: 38.20% $22,267,340.17

Bid Items & Bid Tabulations

295 Total 0 of 295
BASTROP  |  SH 71  |  AUSTIN  |  0265-03-043  |  06/04/2025  |  $67,216,534.77  |  F 2024(527)  |  HWY IMPRV  |  589 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JORDAN FOSTER CONSTRUCTION, LLC
INDUS ROAD & BRIDGE, INC.
SER CONSTRUCTION PARTNERS, LLC
HARPER BROTHERS CONSTRUCTION LLC
PULICE CONSTRUCTION, INC.
JAMES CONSTRUCTION GROUP, LLC
WEBBER, LLC
POSILLICO CIVIL, INC.
ZACHRY CONSTRUCTION CORPORATION
PREPARING ROW
STA 89.680 $4,000.000 $32,000.000 $24,328.050 $23,500.000 $9,500.000 $71,364.000 $60,000.000 $75,384.200 $41,800.000 $75,825.160
REMOV CONC (MOWSTRIP)
SY 3,625.000 $15.000 $11.000 $15.000 $5.000 $10.000 $6.600 $11.110 $17.000 $25.000 $5.490
REMOV CONC (RIPRAP)
SY 986.000 $35.000 $10.000 $12.000 $6.400 $10.000 $15.800 $11.100 $14.000 $13.000 $8.370
REMOV CONC (MEDIANS)
SY 23.000 $30.000 $59.000 $50.000 $9.300 $25.000 $41.510 $17.530 $29.000 $100.000 $12.490
REMOV CONC (DRIVEWAYS)
SY 2,785.000 $25.000 $27.000 $20.000 $6.000 $10.000 $16.350 $16.400 $33.000 $10.000 $8.010
REMOV CONC (CURB)
LF 183.000 $25.000 $12.000 $5.500 $3.000 $0.500 $19.170 $9.370 $6.500 $9.000 $1.910
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 3,281.000 $10.000 $11.000 $5.000 $13.100 $4.500 $14.650 $3.340 $10.000 $2.000 $10.320
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 68,059.000 $10.000 $7.350 $11.000 $11.000 $9.650 $13.670 $8.000 $13.000 $4.000 $9.200
EXCAV (ROADWAY)
CY 90,598.000 $20.000 $14.000 $14.000 $8.700 $6.500 $5.060 $13.780 $12.000 $5.000 $4.890
EMBANK (FNL)(OC)(TY B)
CY 213,815.000 $32.000 $12.000 $12.000 $17.700 $6.250 $13.210 $25.520 $15.000 $13.000 $9.820
EMBANK (FNL)(OC)(TY C)
CY 24,467.000 $22.500 $30.000 $26.000 $31.100 $20.000 $33.260 $59.200 $40.000 $29.000 $50.000
FURN & PLACE TOPSOIL (4")
SY 188,972.000 $1.500 $1.600 $1.000 $1.500 $2.500 $12.530 $1.180 $2.030 $3.500 $1.910
BLOCK SODDING
SY 3,034.000 $12.000 $6.300 $8.000 $8.100 $9.680 $8.770 $6.000 $7.600 $8.000 $8.530
DRILL SEED (PERM_RURAL_CLAY)
SY 185,938.000 $0.750 $0.140 $0.200 $0.200 $0.220 $0.220 $0.130 $0.190 $0.200 $0.220
DRILL SEED (TEMP_WARM_COOL)
SY 176,670.000 $0.500 $0.140 $0.170 $0.200 $0.210 $0.170 $0.130 $0.150 $0.200 $0.160
VEGETATIVE WATERING
TGL 41,700.000 $22.500 $1.200 $1.000 $31.800 $10.000 $55.610 $35.700 $8.000 $38.000 $29.260
SOIL RET BLKT(SL_MOD_CLAY_LONG)
SY 127,038.000 $4.500 $1.150 $1.000 $1.000 $1.150 $1.100 $1.450 $0.950 $1.000 $1.850
SOIL RET BLKT(CHAN_TEMP_4 PSF)
SY 238,604.000 $4.000 $1.500 $1.700 $1.600 $1.650 $1.790 $1.450 $1.550 $1.550 $2.010
FL BS (CMP IN PLC)(TY D GR 5)(FNAL POS)
CY 9,136.000 $85.000 $82.000 $57.000 $45.200 $85.000 $63.090 $73.640 $61.400 $55.000 $68.830
LIME (COM OR QK)(SLURRY)
TON 1,244.000 $300.000 $333.990 $350.000 $375.800 $355.000 $371.880 $366.260 $313.000 $350.000 $349.700
LIME TRT (SUBGRADE) (8")
SY 45,353.000 $6.000 $4.850 $6.000 $3.300 $8.000 $2.640 $4.200 $4.000 $5.000 $4.740
LIME TRT (SUBGRADE)(12")
SY 4,311.000 $3.000 $10.000 $8.000 $7.200 $8.000 $4.460 $7.130 $9.000 $9.000 $6.700
CEMENT
TON 10.000 $300.000 $215.000 $410.000 $318.000 $350.000 $282.830 $234.240 $2,500.000 $400.000 $205.750
CEMENT TRT (SUBGRADE)(12")
SY 910.000 $6.000 $15.000 $8.000 $8.700 $8.000 $4.990 $8.200 $100.000 $22.000 $27.130
CEMENT TREAT (SUBGRADE) (8")
SY 90.000 $5.000 $30.000 $11.000 $21.700 $9.000 $24.050 $82.910 $200.000 $70.000 $62.710
CM TRT(PT MX)(CL N)(TY A)(GR 5)(FN POS)
CY 11,563.000 $175.000 $150.000 $98.000 $86.200 $135.000 $31.280 $89.910 $85.000 $126.000 $250.630
PRIME COAT (MULTI OPTION)
GAL 22,635.000 $6.000 $3.850 $4.000 $4.000 $4.200 $6.630 $3.800 $3.800 $4.000 $4.130
D-GR HMA TY-B PG64-22
TON 13,480.000 $136.000 $100.000 $129.000 $111.800 $95.000 $134.960 $95.000 $95.000 $96.000 $103.200
D-GR HMA TY-D PG76-22
TON 4,730.000 $150.000 $135.000 $160.000 $159.800 $130.000 $154.570 $130.000 $130.000 $145.000 $141.210
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 3,730.000 $225.000 $140.000 $159.000 $165.400 $135.000 $145.340 $135.000 $135.000 $145.000 $146.640
TOM-C PG76-22 SAC-A
TON 623.000 $185.000 $180.000 $230.000 $233.600 $174.000 $301.070 $174.000 $174.000 $29.000 $189.010
TOM-C PG76-22 SAC-B
TON 2,009.000 $172.500 $180.000 $195.000 $202.000 $170.000 $259.540 $170.000 $170.000 $220.000 $184.670
CONC PVMT (CRCP) (11")
SY 63,749.000 $100.000 $95.000 $95.000 $100.500 $147.500 $83.880 $111.940 $78.000 $131.250 $128.530
CONC PVMT(TRANSITION SLAB) (11")
SY 733.000 $125.000 $130.000 $136.500 $131.800 $145.000 $174.830 $318.140 $117.000 $210.000 $195.750
CUT & RESTORING PAV
SY 760.000 $200.000 $510.000 $465.000 $294.000 $250.000 $157.400 $251.090 $350.000 $1,150.000 $437.020
CEM STABIL BKFL
CY 392.000 $300.000 $180.000 $220.000 $216.700 $300.000 $145.550 $196.820 $120.000 $170.000 $180.420
TRENCH EXCAVATION PROTECTION
LF 9,639.000 $15.000 $9.300 $5.500 $0.100 $2.000 $22.090 $2.500 $25.000 $26.000 $12.190
TEMPORARY SPL SHORING
SF 2,547.000 $50.000 $180.000 $103.000 $27.000 $13.310 $58.670 $71.700 $120.000 $105.000 $75.000
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 2.000 $32,500.000 $24,000.000 $22,000.000 $7,311.900 $60,000.000 $21,628.320 $20,000.000 $20,000.000 $37,500.000 $27,208.180
DRILL SHAFT (18 IN)
LF 210.000 $200.000 $110.000 $81.000 $120.000 $150.000 $229.870 $284.090 $150.000 $202.000 $111.150
DRILL SHAFT (36 IN)
LF 3,216.000 $400.000 $205.000 $280.000 $392.500 $475.000 $494.340 $217.120 $300.000 $390.000 $248.220
DRILL SHAFT (48 IN)
LF 147.000 $825.000 $560.000 $625.000 $636.000 $523.530 $874.760 $523.530 $523.530 $675.000 $712.420
DRILL SHAFT (72 IN)
LF 32.000 $1,200.000 $1,900.000 $2,300.000 $1,780.800 $1,747.400 $2,121.430 $1,747.400 $1,747.400 $2,000.000 $2,058.370
DRILL SHAFT (SIGN MTS) (24 IN)
LF 77.000 $180.000 $135.000 $132.000 $307.400 $127.000 $244.310 $203.000 $127.000 $305.000 $140.020
DRILL SHAFT (HIGH MAST POLE) (48 IN)
LF 224.000 $850.000 $600.000 $510.000 $583.000 $558.450 $570.920 $558.450 $558.450 $580.000 $615.720
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 52.000 $450.000 $290.000 $278.000 $397.500 $269.820 $311.240 $269.830 $269.830 $400.000 $297.500
CL B CONC (FLUME)
CY 8.100 $1,200.000 $1,400.000 $610.000 $758.800 $1,250.000 $793.950 $1,007.710 $1,200.000 $1,920.000 $771.790
CL C CONC (ABUT)
CY 186.200 $1,500.000 $1,400.000 $1,050.000 $1,187.800 $2,000.000 $1,031.150 $930.970 $2,500.000 $1,600.000 $1,155.510
CL C CONC (CAP)
CY 182.400 $1,700.000 $2,000.000 $1,525.000 $1,219.500 $2,275.000 $1,363.170 $1,460.780 $2,700.000 $3,000.000 $1,981.560
CL C CONC (COLUMN)
CY 162.400 $1,600.000 $1,700.000 $1,400.000 $1,685.400 $2,100.000 $1,596.610 $1,305.230 $3,200.000 $1,500.000 $1,692.120
CL C CONC (RAIL FOUNDATION)
CY 57.000 $950.000 $580.000 $610.000 $744.300 $100.000 $669.170 $541.940 $700.000 $750.000 $723.770
REINF CONC SLAB
SF 45,120.000 $28.000 $28.000 $23.000 $27.800 $35.000 $31.080 $28.090 $35.000 $44.000 $26.510
APPROACH SLAB
CY 335.600 $740.000 $500.000 $720.000 $576.900 $975.000 $420.060 $711.140 $1,500.000 $650.000 $745.940
RETAINING WALL (MSE)
SF 69,802.000 $80.000 $90.000 $90.000 $93.900 $135.000 $41.500 $85.160 $100.000 $85.000 $87.570
RETAINING WALL (STONE)
SF 496.000 $200.000 $35.000 $236.000 $174.400 $135.000 $56.510 $130.970 $185.000 $80.000 $82.320
PRESTR CONC GIRDER (TX34)
LF 3,079.840 $220.000 $200.000 $205.000 $192.000 $275.000 $214.470 $197.640 $220.000 $250.000 $187.330
PRESTR CONC GIRDER (TX40)
LF 2,525.100 $200.000 $210.000 $204.000 $199.000 $275.000 $217.710 $200.980 $280.000 $265.000 $205.120
RIPRAP (CONC)(4 IN)
CY 344.840 $675.000 $616.000 $515.000 $545.000 $545.000 $617.270 $996.490 $561.130 $425.000 $641.760
RIPRAP (CONC)(5 IN)
CY 645.400 $650.000 $715.000 $450.000 $566.300 $455.000 $696.810 $608.700 $628.900 $457.000 $617.640
RIPRAP (CONC)(CL A)
CY 10.000 $640.000 $935.000 $660.000 $720.200 $600.000 $838.020 $608.700 $1,011.800 $1,091.000 $741.000
RIPRAP (MOW STRIP)(4 IN)
CY 668.000 $650.000 $685.000 $595.000 $492.400 $685.000 $624.510 $633.780 $591.120 $547.000 $763.040
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 264.000 $225.000 $315.000 $325.000 $453.300 $275.000 $203.020 $255.000 $461.330 $479.000 $222.100
RIPRAP (STONE PROTECTION)(18 IN)
CY 29.600 $250.000 $400.000 $210.000 $432.900 $325.000 $267.440 $227.090 $236.090 $528.000 $121.240
RAIL (TY SSTR)
LF 6,231.000 $110.000 $115.000 $110.000 $188.300 $135.000 $68.750 $134.590 $170.000 $44.000 $106.820
RAIL (TY C223)
LF 57.000 $150.000 $345.000 $300.000 $322.700 $350.000 $67.910 $217.240 $330.000 $267.000 $66.160
RAIL (TY PR11)
LF 75.000 $130.000 $168.000 $175.000 $172.100 $250.000 $139.310 $140.050 $161.570 $345.000 $220.670
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 406.000 $250.000 $210.000 $190.000 $196.900 $265.000 $273.450 $173.100 $350.000 $183.000 $230.800
CONC BOX CULV (6 FT X 4 FT)
LF 307.000 $600.000 $610.000 $675.000 $617.700 $900.000 $802.380 $604.180 $660.000 $579.000 $788.010
CONC BOX CULV (9 FT X 4 FT)
LF 172.000 $1,250.000 $958.000 $1,000.000 $913.500 $1,450.000 $1,207.620 $1,590.000 $1,000.000 $881.000 $1,165.380
CONC BOX CULV (10 FT X 5 FT)
LF 1,841.000 $1,500.000 $1,250.000 $1,200.000 $1,186.700 $1,750.000 $1,261.830 $1,082.880 $1,400.000 $2,000.000 $1,486.000
RC PIPE (CL III)(24 IN)
LF 5,483.000 $100.000 $86.000 $100.000 $91.800 $140.000 $72.750 $149.280 $150.000 $149.000 $95.920
RC PIPE (CL III)(30 IN)
LF 4,785.000 $200.000 $108.000 $128.000 $113.700 $190.000 $97.640 $135.780 $180.000 $156.000 $119.350
RC PIPE (CL III)(36 IN)
LF 1,855.000 $240.000 $175.000 $184.000 $156.700 $290.000 $155.710 $176.520 $200.000 $163.000 $157.290
RC PIPE (CL III)(42 IN)
LF 740.000 $250.000 $225.000 $215.000 $196.900 $325.000 $194.940 $299.080 $290.000 $219.000 $205.760
MANH (COMPL)(PRM)(60IN)
EA 6.000 $9,000.000 $7,100.000 $9,800.000 $6,267.500 $13,500.000 $11,032.350 $6,600.000 $7,000.000 $8,500.000 $9,253.770
MANH (COMPL)(PRM)(72IN)
EA 5.000 $14,000.000 $9,400.000 $11,000.000 $6,057.600 $17,500.000 $17,738.750 $7,016.400 $8,500.000 $10,000.000 $11,438.470
INLET (COMPL)(PCO)(3FT)(NONE)
EA 1.000 $7,000.000 $5,482.000 $5,000.000 $4,274.500 $11,615.000 $5,825.390 $4,441.750 $9,500.000 $6,150.000 $7,373.270
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 8.000 $8,000.000 $6,500.000 $5,300.000 $5,844.800 $11,925.000 $5,913.580 $4,441.750 $10,000.000 $7,100.000 $7,693.720
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 8.000 $8,000.000 $7,000.000 $5,500.000 $6,073.700 $12,625.000 $6,075.400 $4,475.650 $8,000.000 $8,500.000 $8,345.470
INLET (COMPL)(PCO)(4FT)(NONE)
EA 1.000 $9,000.000 $6,800.000 $5,500.000 $5,490.300 $13,275.000 $6,513.010 $4,475.650 $9,000.000 $7,700.000 $8,915.900
INLET (COMPL)(PCO)(4FT)(LEFT)
EA 3.000 $9,000.000 $7,000.000 $5,500.000 $6,516.300 $13,650.000 $7,032.220 $4,475.650 $9,500.000 $8,400.000 $9,241.810
INLET (COMPL)(PCO)(4FT)(RIGHT)
EA 8.000 $9,000.000 $7,000.000 $6,400.000 $6,787.100 $14,000.000 $7,019.130 $4,475.650 $10,000.000 $8,500.000 $9,562.220
INLET (COMPL)(PCO)(5FT)(NONE)
EA 2.000 $10,000.000 $8,400.000 $7,000.000 $6,545.600 $14,100.000 $8,962.090 $5,250.000 $15,500.000 $8,700.000 $9,698.170
INLET (COMPL)(PCU)(3FT)(NONE)
EA 5.000 $10,000.000 $6,200.000 $4,500.000 $4,949.900 $11,975.000 $6,523.780 $4,600.000 $6,000.000 $7,000.000 $7,694.810
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 7.000 $11,500.000 $6,700.000 $5,200.000 $6,481.400 $12,685.000 $5,842.160 $6,450.100 $6,500.000 $8,200.000 $8,265.020
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 2.000 $11,500.000 $7,000.000 $5,500.000 $6,522.100 $13,215.000 $6,534.890 $6,587.800 $7,800.000 $8,300.000 $8,750.710
INLET (COMPL)(PCU)(4FT)(RIGHT)
EA 1.000 $10,000.000 $7,100.000 $5,400.000 $6,768.600 $13,275.000 $6,227.760 $6,575.000 $10,000.000 $8,200.000 $8,826.890
INLET (COMPL)(PCU)(5FT)(NONE)
EA 1.000 $12,000.000 $7,900.000 $5,700.000 $6,166.600 $15,550.000 $6,747.070 $6,675.000 $11,500.000 $8,200.000 $11,001.690
INLET (COMPL)(PCU)(5FT)(RIGHT)
EA 1.000 $12,000.000 $7,900.000 $5,600.000 $7,078.200 $15,750.000 $6,813.480 $6,675.000 $12,000.000 $9,200.000 $11,197.210
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 20.000 $9,000.000 $8,200.000 $7,000.000 $5,323.400 $9,025.000 $7,981.460 $2,000.000 $9,200.000 $8,000.000 $9,024.970
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
EA 1.000 $10,000.000 $7,200.000 $5,600.000 $5,222.300 $9,575.000 $8,824.040 $1,730.000 $14,000.000 $7,400.000 $9,024.970
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
EA 3.000 $10,000.000 $9,300.000 $7,200.000 $6,864.100 $10,275.000 $11,806.510 $2,080.000 $10,000.000 $7,600.000 $10,320.780
INLET (COMPL) (TY MSE2)
EA 12.000 $10,000.000 $11,500.000 $6,300.000 $7,788.900 $11,975.000 $8,678.040 $8,130.000 $18,000.000 $13,000.000 $8,045.070
WINGWALL (FW - 0) (HW=5 FT)
EA 2.000 $16,000.000 $21,000.000 $20,000.000 $14,564.200 $26,550.000 $13,095.200 $12,920.290 $31,000.000 $27,250.000 $20,397.300
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $25,000.000 $38,000.000 $30,000.000 $36,838.000 $55,000.000 $24,874.810 $25,333.200 $25,000.000 $42,200.000 $35,833.080
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $70,000.000 $72,000.000 $56,000.000 $97,927.600 $94,250.000 $37,357.140 $35,555.530 $55,000.000 $78,500.000 $71,445.660
WINGWALL (PW - 1) (HW=11 FT)
EA 1.000 $90,000.000 $77,000.000 $58,000.000 $109,214.500 $104,500.000 $56,473.320 $42,964.010 $75,000.000 $83,700.000 $77,068.710
SET (TY I)(S= 10 FT)(HW= 6 FT)(6:1)(P)
EA 12.000 $22,000.000 $34,500.000 $28,000.000 $71,973.000 $42,339.110 $17,032.120 $1,610.000 $28,000.000 $25,500.000 $34,840.790
SET (TY I)(S= 10 FT)(HW= 7 FT)(6:1)(P)
EA 2.000 $22,000.000 $42,000.000 $29,000.000 $81,078.300 $42,450.000 $19,876.880 $1,630.000 $30,000.000 $33,200.000 $41,897.150
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $2,000.000 $1,800.000 $2,200.000 $1,951.600 $2,295.000 $4,727.090 $1,225.950 $2,800.000 $5,100.000 $2,756.390
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $2,250.000 $2,300.000 $2,500.000 $2,609.900 $2,700.000 $4,856.290 $2,040.750 $3,600.000 $5,050.000 $3,032.030
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 21.000 $2,350.000 $2,300.000 $2,500.000 $2,609.900 $2,425.000 $4,149.840 $1,526.000 $3,700.000 $5,050.000 $2,039.730
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 1.000 $4,000.000 $3,300.000 $3,000.000 $4,099.400 $3,300.000 $5,733.070 $4,380.000 $4,000.000 $5,650.000 $3,914.060
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $4,000.000 $3,700.000 $3,400.000 $4,192.700 $3,300.000 $5,520.440 $4,512.660 $5,600.000 $5,600.000 $4,134.590
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 5.000 $5,750.000 $5,100.000 $4,400.000 $7,857.100 $7,450.000 $8,075.680 $6,398.000 $7,000.000 $7,000.000 $8,048.660
SET (TY II) (42 IN) (RCP) (6: 1) (C)
EA 2.000 $9,000.000 $5,000.000 $4,900.000 $8,974.200 $8,850.000 $11,703.390 $4,284.750 $8,000.000 $4,800.000 $7,662.770
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $120,000.000 $85,000.000 $110,000.000 $71,472.300 $150,000.000 $282,610.100 $67,297.780 $150,000.000 $73,000.000 $97,870.170
REMOV STR (CATTLE GUARD)
EA 1.000 $1,300.000 $4,100.000 $4,000.000 $555.200 $1,500.000 $4,117.760 $672.380 $1,001.550 $4,223.000 $1,480.130
REMOV STR (BUILDING)
EA 1.000 $2,000.000 $5,300.000 $50,000.000 $34,999.100 $2,000.000 $72,671.100 $6,552.560 $40,000.000 $26,533.000 $7,911.520
MOBILIZATION
LS 1.000 $6,192,557.100 $5,800,000.000 $5,940,000.000 $6,100,000.000 $3,125,000.000 $6,398,687.010 $5,996,558.960 $6,760,455.300 $6,840,000.000 $6,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 29.000 $10,000.000 $29,000.000 $21,000.000 $18,152.900 $50,000.000 $14,023.720 $12,203.550 $3,411.880 $35,000.000 $20,275.840
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $7,500.000 $21,000.000 $19,500.000 $19,154.200 $23,500.000 $35,773.370 $15,172.940 $16,020.350 $18,513.000 $25,446.590
TMA (STATIONARY)
DAY 25.000 $300.000 $950.000 $190.000 $371.000 $375.000 $391.950 $698.400 $171.650 $201.000 $296.430
TMA (MOBILE OPERATION)
DAY 150.000 $300.000 $930.000 $500.000 $212.000 $575.000 $1,047.080 $1,066.840 $286.080 $524.000 $494.740
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 380.000 $50.000 $33.000 $55.000 $53.100 $46.450 $54.790 $32.000 $32.000 $50.000 $51.600
ROCK FILTER DAMS (REMOVE)
LF 480.000 $20.000 $10.000 $25.000 $24.900 $35.300 $22.490 $10.000 $10.000 $23.000 $21.180
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 6,216.000 $37.500 $18.000 $40.000 $39.600 $31.500 $22.490 $17.000 $17.000 $37.000 $21.180
CONSTRUCTION EXITS (REMOVE)
SY 6,216.000 $17.500 $8.200 $14.000 $14.100 $10.750 $19.320 $8.000 $8.000 $13.000 $18.200
SANDBAGS FOR EROSION CONTROL
EA 159.000 $20.000 $8.200 $31.000 $32.300 $10.700 $8.650 $8.000 $8.000 $30.000 $8.150
TEMP SEDMT CONT FENCE (INSTALL)
LF 12,534.000 $4.750 $3.150 $4.200 $4.300 $3.550 $4.040 $3.000 $3.000 $4.000 $3.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 12,534.000 $1.500 $0.850 $1.200 $1.200 $0.500 $0.520 $0.800 $0.800 $1.000 $0.490
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 5,300.000 $8.000 $4.200 $10.000 $10.400 $4.750 $5.190 $4.000 $4.000 $10.000 $4.890
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,300.000 $2.000 $0.500 $1.800 $1.900 $1.000 $0.870 $0.500 $0.500 $2.000 $0.810
ROCK FILTER DAMS (INSTALL) (TY 2) 6:1
LF 100.000 $50.000 $57.000 $140.000 $144.100 $126.750 $86.510 $55.000 $55.000 $136.000 $81.460
CONSTRUCTING DETOURS
SY 24,679.000 $100.001 $82.000 $132.000 $100.600 $75.000 $37.040 $124.880 $121.000 $83.000 $114.030
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,360.000 $60.000 $16.850 $77.000 $31.700 $30.000 $89.510 $35.670 $45.000 $41.000 $34.360
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 280.000 $60.000 $45.000 $77.000 $31.700 $30.000 $95.540 $35.670 $80.000 $44.000 $80.090
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 3,820.000 $15.000 $8.000 $5.000 $13.400 $15.000 $9.900 $7.470 $10.000 $11.000 $12.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 260.000 $20.000 $22.000 $8.500 $13.400 $15.000 $30.520 $8.620 $18.000 $17.000 $23.940
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 4,360.000 $12.500 $12.000 $12.000 $28.300 $15.000 $16.560 $7.110 $8.000 $10.000 $16.290
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 280.000 $15.000 $25.000 $12.000 $28.300 $15.000 $34.550 $6.720 $10.000 $20.000 $24.330
PORT CTB (CONNECTION HARDWARE)
EA 1,122.000 $100.000 $27.000 $35.000 $116.600 $1.000 $43.360 $114.460 $100.000 $22.000 $3.960
PTB (FUR & INST)(STEEL)
LF 1,000.000 $40.000 $202.000 $170.000 $111.300 $111.300 $125.080 $133.090 $200.000 $158.000 $206.860
PTB (MOVE)(STEEL)
LF 2,900.000 $9.000 $16.000 $5.000 $127.200 $15.000 $8.890 $3.250 $8.000 $18.000 $11.370
PTB (STKPL)(STEEL)
LF 1,000.000 $67.000 $9.000 $7.000 $58.300 $15.000 $19.090 $7.450 $7.000 $21.000 $7.230
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
LF 15,690.000 $50.000 $32.000 $70.000 $54.100 $35.000 $49.100 $29.680 $55.000 $58.000 $45.790
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 26,250.000 $12.500 $9.000 $18.000 $9.800 $12.000 $2.900 $4.900 $7.000 $9.000 $18.000
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 15,690.000 $15.000 $19.000 $18.000 $13.600 $15.000 $6.820 $5.540 $8.000 $11.000 $16.460
PORT CTB (FURN & INST)(TL-3 LPCB)
LF 3,870.000 $100.000 $27.000 $100.000 $43.300 $90.000 $81.520 $56.430 $100.000 $55.000 $35.070
PORT CTB (MOVE) (TL-3 LPCB)
LF 2,460.000 $5.000 $8.350 $5.000 $13.900 $15.000 $5.080 $9.090 $8.000 $18.000 $9.000
PORT CTB (REMOVE) (TL-3 LPCB)
LF 3,870.000 $10.000 $20.000 $12.000 $12.100 $15.000 $8.850 $8.990 $6.000 $14.000 $12.690
COLORED TEXTURED CONC (4")
SY 2,227.000 $100.000 $133.000 $110.000 $114.500 $110.000 $146.730 $60.450 $146.070 $96.000 $140.120
CONC CURB & GUTTER (TY I)
LF 4,813.000 $30.000 $26.000 $22.000 $21.300 $45.000 $98.940 $21.400 $32.200 $25.000 $27.350
CONC CURB & GUTTER (TY II)
LF 16,982.000 $37.500 $33.000 $22.000 $22.500 $35.000 $100.240 $27.630 $31.050 $32.000 $34.730
DRIVEWAYS (CONC)
SY 1,677.000 $120.000 $115.000 $110.000 $83.900 $110.000 $168.610 $83.360 $139.070 $92.000 $100.410
DRIVEWAYS (ACP)
SY 4,770.000 $82.500 $70.000 $105.000 $66.600 $80.000 $127.440 $76.780 $59.070 $51.000 $72.520
CONC SIDEWALKS (5")
SY 4,934.000 $90.000 $89.000 $66.000 $72.000 $85.000 $179.020 $75.770 $96.070 $62.000 $85.320
CURB RAMPS (TY 1)
EA 4.000 $2,700.000 $2,700.000 $3,300.000 $2,060.100 $3,460.000 $3,122.520 $2,591.430 $2,988.370 $3,282.000 $3,838.990
CURB RAMPS (TY 7)
EA 42.000 $2,750.000 $2,700.000 $3,300.000 $4,359.700 $3,440.000 $2,716.720 $2,914.770 $2,788.370 $3,135.000 $4,055.410
MTL W-BEAM GD FEN (TIM POST)
LF 2,925.000 $30.000 $25.000 $24.000 $29.900 $26.700 $30.800 $33.000 $28.750 $23.000 $29.010
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 13.000 $2,400.000 $2,100.000 $2,000.000 $2,306.600 $2,175.550 $2,509.520 $3,099.000 $2,342.750 $1,981.000 $2,363.220
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000 $1,300.000 $1,400.000 $1,400.000 $1,696.000 $1,600.000 $1,845.610 $1,850.000 $1,722.970 $1,391.000 $1,738.020
REMOVE METAL BEAM GUARD FENCE
LF 719.000 $4.000 $6.300 $6.000 $5.600 $5.250 $6.060 $4.000 $5.650 $6.000 $5.700
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $550.000 $470.000 $450.000 $138.900 $131.000 $151.090 $620.000 $141.070 $448.000 $142.300
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $90.000 $210.000 $210.000 $138.900 $131.000 $151.100 $680.000 $141.070 $201.000 $142.300
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
LF 9,753.000 $15.000 $11.000 $11.000 $13.300 $5.250 $6.060 $5.250 $11.470 $13.000 $5.700
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 8.000 $3,000.000 $2,600.000 $2,500.000 $3,180.000 $3,721.550 $4,292.840 $3,721.550 $4,052.370 $4,417.000 $4,042.580
CABLE BARRIER (REMOVE)
LF 9,095.000 $7.500 $2.250 $2.200 $2.400 $3.500 $4.040 $3.500 $3.770 $3.000 $3.800
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 8.000 $1,100.000 $375.000 $365.000 $1,060.000 $1,310.000 $1,511.100 $1,310.000 $1,410.680 $1,472.000 $284.540
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $3,300.000 $3,600.000 $3,600.000 $3,841.400 $3,624.050 $4,180.380 $3,300.000 $3,902.580 $3,493.000 $3,936.610
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $425.000 $430.000 $277.700 $261.950 $302.150 $790.000 $282.080 $404.000 $284.540
CRASH CUSH ATTEN (MOVE & RESET)
EA 45.000 $1,500.000 $1,250.000 $1,150.000 $1,219.000 $1,150.000 $1,326.540 $2,750.000 $1,238.380 $1,594.000 $1,249.200
CRASH CUSH ATTEN (REMOVE)
EA 23.000 $1,200.000 $625.000 $1,150.000 $609.500 $575.000 $663.270 $790.000 $619.190 $1,039.000 $624.600
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 23.000 $12,000.000 $8,600.000 $9,600.000 $8,400.500 $7,925.000 $9,141.570 $2,750.000 $8,534.090 $8,894.000 $8,608.630
PIPE UNDERDRAINS (TY 6) (6")
LF 3,829.000 $35.000 $28.000 $33.000 $28.400 $35.000 $25.050 $34.000 $50.000 $37.000 $33.910
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 6.000 $350.000 $460.000 $265.000 $318.000 $438.850 $506.210 $438.850 $300.000 $436.000 $325.880
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $800.000 $465.000 $605.000 $662.500 $442.450 $510.360 $442.450 $625.000 $816.000 $678.920
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 8.000 $1,850.000 $1,665.000 $1,600.000 $2,014.000 $1,559.170 $1,798.520 $1,559.190 $1,559.190 $2,004.000 $1,719.090
HI MST IL POLE (100 FT)( 80 MPH)
EA 8.000 $45,000.000 $47,000.000 $45,500.000 $37,524.000 $44,327.470 $51,132.210 $44,327.470 $44,327.660 $37,329.000 $48,873.750
LED HI MST IL ASM (6 FIXT) (TY A)
EA 8.000 $35,000.000 $43,000.000 $41,000.000 $45,580.000 $39,704.970 $45,800.100 $39,705.070 $39,705.070 $45,343.000 $43,777.080
CONDT (PVC) (SCH 40) (2")
LF 11,955.000 $20.000 $12.000 $12.000 $11.700 $11.290 $13.020 $11.290 $11.290 $12.000 $12.450
CONDT (PVC) (SCH 40) (2") (BORE)
LF 3,595.000 $25.000 $19.000 $18.000 $27.600 $16.880 $19.470 $16.890 $19.890 $27.000 $18.620
CONDT (PVC) (SCH 40) (3")
LF 13,040.000 $30.000 $15.000 $14.000 $19.100 $13.520 $15.600 $13.520 $13.520 $19.000 $14.910
CONDT (PVC) (SCH 40) (3") (BORE)
LF 4,565.000 $50.000 $23.000 $23.000 $30.700 $21.910 $25.270 $21.910 $21.910 $31.000 $24.160
CONDT (PVC) (SCH 40) (4")
LF 40.000 $30.000 $21.000 $21.000 $35.000 $19.770 $22.800 $19.780 $19.780 $35.000 $21.810
CONDT (RM) (1")
LF 335.000 $30.000 $86.000 $70.000 $32.900 $80.700 $78.660 $80.700 $80.700 $33.000 $88.970
CONDT (RM) (3")
LF 420.000 $70.000 $60.000 $58.000 $90.100 $56.420 $65.080 $56.420 $56.420 $90.000 $62.210
ITS MULTI-DUCT CND (PVC-40)
LF 5,935.000 $50.000 $20.000 $19.000 $26.500 $17.930 $20.680 $17.930 $17.930 $26.000 $19.770
ITS MULTI-DUCT CND (PVC-40)(BORE)
LF 1,595.000 $60.000 $24.000 $24.000 $35.000 $22.890 $26.400 $22.890 $22.890 $35.000 $25.240
ITS MULTI-DUCT CND (RMC)
LF 210.000 $100.000 $190.000 $185.000 $127.200 $179.640 $207.220 $179.640 $179.640 $127.000 $198.070
FIBER OPTIC CABLE ROAD MARKER
LF 9.000 $180.000 $295.000 $285.000 $159.000 $275.510 $317.800 $275.510 $275.520 $158.000 $303.780
ELEC CONDR (NO.14) INSULATED
LF 8,615.000 $1.250 $1.100 $1.100 $1.200 $1.020 $1.180 $1.020 $1.020 $1.000 $1.120
ELEC CONDR (NO.10) BARE
LF 545.000 $2.000 $1.200 $1.200 $1.900 $1.140 $1.310 $1.140 $1.140 $2.000 $1.260
ELEC CONDR (NO.10) INSULATED
LF 1,090.000 $2.500 $1.250 $1.240 $1.900 $1.170 $1.350 $1.170 $1.170 $2.000 $1.290
ELEC CONDR (NO.8) BARE
LF 7,480.000 $1.500 $1.550 $1.500 $2.100 $1.470 $1.700 $1.470 $1.470 $2.000 $1.620
ELEC CONDR (NO.8) INSULATED
LF 13,720.000 $2.000 $1.900 $1.840 $2.100 $1.780 $2.050 $1.780 $1.780 $2.000 $1.960
ELEC CONDR (NO.6) BARE
LF 1,030.000 $1.500 $2.000 $2.000 $2.300 $1.900 $2.190 $1.900 $1.900 $2.000 $2.090
ELEC CONDR (NO.6) INSULATED
LF 2,060.000 $2.500 $2.450 $2.400 $2.400 $2.290 $2.640 $2.290 $2.290 $2.000 $2.530
ELEC CONDR (NO.4) BARE
LF 615.000 $3.000 $2.850 $2.800 $2.900 $2.670 $3.080 $2.670 $2.670 $3.000 $2.940
ELEC CONDR (NO.4) INSULATED
LF 1,230.000 $3.000 $3.250 $3.200 $2.900 $3.050 $3.520 $3.050 $3.050 $3.000 $3.360
ELEC CONDR (NO.2) BARE
LF 2,495.000 $4.500 $3.350 $3.300 $4.300 $3.120 $3.600 $3.120 $3.120 $4.000 $3.440
ELEC CONDR (NO.2) INSULATED
LF 5,655.000 $4.500 $4.500 $4.400 $5.000 $4.250 $4.900 $4.250 $4.250 $5.000 $4.690
ELEC CONDR (1/0) BARE
LF 1,905.000 $6.000 $4.700 $4.600 $6.100 $4.430 $5.110 $4.430 $4.430 $6.000 $4.880
ELEC CONDR (1/0) INSULATED
LF 3,810.000 $6.000 $5.000 $4.900 $7.300 $4.740 $5.470 $4.740 $4.740 $7.000 $5.230
ITS GND BOX TY 1 (122422)W/APRON
EA 15.000 $5,000.000 $2,900.000 $2,900.000 $3,922.000 $2,776.490 $3,202.710 $2,776.540 $2,776.540 $3,902.000 $3,061.300
GROUND BOX TY A (122311)W/APRON
EA 25.000 $1,500.000 $1,400.000 $1,400.000 $1,590.000 $1,328.690 $1,532.660 $1,328.740 $1,328.740 $1,582.000 $1,465.000
GROUND BOX TY D (162922)W/APRON
EA 34.000 $2,000.000 $1,200.000 $1,300.000 $2,120.000 $1,201.690 $1,386.160 $1,201.740 $1,201.740 $2,109.000 $1,324.980
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
EA 3.000 $12,000.000 $8,700.000 $8,400.000 $9,646.000 $8,191.200 $9,448.620 $8,191.290 $8,191.290 $9,596.000 $9,031.360
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 6.000 $9,000.000 $7,300.000 $7,000.000 $9,010.000 $6,825.940 $7,873.780 $6,826.040 $6,826.040 $8,963.000 $7,526.100
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
EA 1.000 $9,000.000 $8,030.000 $7,700.000 $9,752.000 $7,524.470 $8,679.560 $7,524.560 $7,524.560 $9,701.000 $8,296.220
ELC SRV TY D 120/240 070(NS)SS(N)SP(O)
EA 1.000 $9,000.000 $7,300.000 $7,000.000 $9,010.000 $6,876.770 $7,932.390 $6,876.860 $6,876.860 $8,963.000 $7,582.110
ALUMINUM SIGNS (TY G)
SF 522.000 $30.000 $30.000 $28.000 $28.600 $27.330 $30.390 $48.000 $27.330 $28.000 $29.620
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 36.000 $1,000.000 $855.000 $740.000 $566.000 $812.000 $936.650 $320.000 $320.000 $904.000 $787.540
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $1,100.000 $1,100.000 $790.000 $691.100 $995.000 $1,147.740 $320.000 $320.000 $923.000 $923.320
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 6.000 $1,400.000 $1,100.000 $720.000 $850.100 $1,071.250 $1,235.690 $320.000 $320.000 $1,116.000 $1,031.940
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,200.000 $1,200.000 $1,000.000 $858.600 $1,206.000 $1,391.090 $650.000 $650.000 $952.000 $1,031.940
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,300.000 $1,600.000 $1,250.000 $1,037.700 $1,471.000 $1,696.790 $900.000 $900.000 $1,130.000 $1,330.670
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 2.000 $1,400.000 $2,100.000 $1,200.000 $1,619.700 $2,031.000 $2,342.760 $1,887.000 $1,887.000 $1,199.000 $2,009.580
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $3,000.000 $2,300.000 $2,800.000 $2,332.000 $2,200.000 $3,643.930 $580.000 $580.000 $2,710.000 $2,413.670
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 6.000 $900.000 $1,000.000 $920.000 $460.000 $905.650 $1,044.670 $350.000 $350.000 $583.000 $515.980
INSTALL LRSS (STRUCT STEEL)
LB 3,349.330 $8.000 $8.150 $8.000 $5.300 $7.610 $9.390 $7.610 $7.610 $5.000 $5.490
INS OH SN SUP(30 FT BAL TEE)
EA 1.000 $60,000.000 $65,000.000 $64,000.000 $59,148.000 $61,326.430 $64,120.990 $61,326.620 $61,326.620 $58,839.980 $61,219.590
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 22.000 $85.000 $96.000 $93.000 $143.100 $84.250 $97.180 $80.000 $90.730 $70.000 $119.490
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 54.000 $25.000 $17.000 $17.000 $15.900 $11.000 $12.690 $80.000 $11.850 $27.000 $21.730
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 25.000 $50.000 $28.000 $27.000 $22.300 $30.100 $34.720 $80.000 $32.410 $65.000 $43.450
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 16.000 $30.000 $18.000 $17.000 $15.900 $11.000 $12.690 $80.000 $11.850 $25.000 $21.730
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 30.000 $45.000 $28.000 $27.000 $22.300 $28.500 $32.870 $80.000 $30.690 $65.000 $43.450
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 22.000 $100.000 $100.000 $94.000 $143.100 $80.250 $92.570 $80.000 $86.420 $84.000 $119.490
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 179.000 $5.000 $5.750 $5.800 $5.800 $5.500 $6.990 $6.100 $5.500 $5.000 $5.970
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 917.000 $5.000 $5.750 $5.800 $5.800 $5.500 $6.990 $6.100 $5.500 $5.000 $5.970
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 12,636.000 $0.800 $1.100 $1.050 $1.100 $1.000 $1.270 $1.150 $1.000 $2.000 $1.090
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 24.000 $1.500 $2.100 $2.050 $2.100 $2.000 $2.540 $5.200 $2.000 $4.000 $2.170
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 85,293.000 $0.800 $1.000 $1.000 $1.000 $0.950 $1.210 $1.060 $0.950 $2.000 $1.030
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 11,739.000 $2.000 $1.650 $1.600 $1.600 $1.550 $1.970 $1.150 $1.550 $1.000 $1.680
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 651.000 $4.000 $6.350 $6.100 $6.400 $6.000 $7.620 $11.660 $6.000 $4.000 $6.520
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 79,252.000 $0.800 $1.000 $1.000 $1.000 $0.950 $1.210 $1.060 $0.950 $2.000 $1.030
WK ZN PAV MRK REMOV (Y)12"(SLD)
LF 689.000 $4.000 $6.300 $6.050 $6.400 $6.000 $7.620 $11.660 $6.000 $3.000 $6.520
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 243.000 $2.000 $1.600 $1.050 $2.100 $6.680 $5.030 $3.250 $2.630 $3.000 $1.170
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 97.000 $2.000 $1.800 $1.050 $2.100 $7.340 $5.030 $1.500 $2.240 $2.000 $1.360
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 717.000 $1.500 $2.100 $2.100 $2.100 $2.000 $2.540 $1.600 $2.000 $2.000 $2.170
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 10,165.000 $2.000 $1.300 $1.300 $1.300 $1.250 $1.590 $1.060 $1.250 $2.000 $1.360
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,557.000 $4.000 $3.450 $3.300 $3.400 $3.250 $4.130 $4.730 $3.250 $4.000 $3.530
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 986.000 $12.000 $6.850 $6.600 $6.900 $6.500 $8.260 $7.770 $6.500 $13.000 $7.060
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 9.000 $300.000 $158.000 $155.000 $159.000 $150.000 $190.520 $275.000 $150.000 $178.000 $162.940
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 4.000 $300.000 $265.000 $255.000 $265.000 $250.000 $317.530 $725.000 $250.000 $178.000 $271.560
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 8.000 $600.000 $420.000 $405.000 $424.000 $400.000 $508.060 $725.000 $400.000 $175.000 $434.500
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 8.000 $400.000 $210.000 $205.000 $212.000 $200.000 $254.030 $1,006.000 $200.000 $275.000 $217.250
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 13.000 $300.000 $180.000 $180.000 $185.500 $175.000 $222.280 $347.000 $175.000 $202.000 $190.100
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 26.000 $30.000 $36.000 $37.000 $37.100 $35.000 $44.460 $52.000 $35.000 $42.000 $38.020
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 993.000 $10.000 $6.800 $6.600 $6.900 $6.500 $8.260 $7.770 $6.500 $8.000 $7.060
RE PM TY II (W) 8" (SLD)
LF 10,165.000 $0.600 $0.800 $0.800 $0.800 $0.750 $0.960 $0.520 $0.750 $1.000 $0.810
RE PM TY II (W) 12" (SLD)
LF 1,557.000 $2.500 $3.150 $3.100 $3.200 $3.000 $3.810 $0.370 $3.000 $3.000 $3.260
RE PM TY II (W) (NUMBER)
EA 8.000 $50.000 $158.000 $155.000 $159.000 $150.000 $190.520 $250.000 $150.000 $68.000 $162.940
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 18,801.000 $1.600 $1.100 $1.050 $1.100 $1.000 $1.270 $1.150 $1.000 $1.000 $1.090
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 18,308.000 $1.600 $1.100 $1.050 $1.100 $1.000 $1.270 $1.150 $1.000 $1.000 $1.090
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 1,126.000 $0.700 $1.000 $1.000 $1.000 $0.900 $1.140 $1.600 $0.900 $1.000 $0.980
REFL PAV MRK TY I (W)6"(SLD)(060MIL)
LF 1,620.000 $0.600 $1.000 $1.000 $1.000 $0.900 $1.140 $0.700 $0.900 $1.000 $0.980
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 9,359.000 $0.600 $1.000 $1.000 $1.000 $0.900 $1.140 $0.700 $0.900 $1.000 $0.980
PREFAB PM TY B (W)(6")(BRK)CONTRAST
LF 4,840.000 $17.500 $9.600 $9.300 $9.700 $9.120 $11.580 $21.650 $9.120 $15.000 $9.910
REFL PAV MRKR TY I-C
EA 4.000 $10.000 $6.600 $6.400 $6.600 $6.250 $7.930 $6.100 $6.250 $6.000 $6.790
REFL PAV MRKR TY II-A-A
EA 181.000 $5.000 $6.600 $6.400 $6.600 $6.250 $7.940 $6.100 $6.250 $7.000 $6.790
REFL PAV MRKR TY II-C-R
EA 382.000 $5.000 $6.600 $6.400 $6.600 $6.250 $7.940 $6.100 $6.250 $6.000 $6.790
ELIM EXT PM & MRKS (6")
LF 17,666.000 $1.000 $1.300 $1.300 $1.300 $1.250 $1.590 $0.430 $1.250 $2.000 $1.360
ELIM EXT PM & MRKS (8")
LF 3,465.000 $1.000 $2.650 $2.600 $2.700 $2.500 $3.170 $0.610 $2.500 $14.000 $2.720
PAV SURF PREP FOR MRK (6")
LF 54,771.000 $0.500 $0.100 $0.120 $0.100 $0.100 $0.130 $0.250 $0.100 $0.470 $0.110
PAV SURF PREP FOR MRK (8")
LF 10,165.000 $0.500 $0.180 $0.160 $0.200 $0.150 $0.200 $0.340 $0.150 $0.260 $0.160
PAV SURF PREP FOR MRK (12")
LF 1,557.000 $0.500 $0.500 $0.460 $0.500 $0.450 $0.580 $1.060 $0.450 $1.000 $0.490
PAV SURF PREP FOR MRK (24")
LF 1,979.000 $2.000 $1.000 $0.950 $1.000 $0.900 $1.140 $3.040 $0.900 $1.000 $0.980
PAV SURF PREP FOR MRK (ARROW)
EA 9.000 $30.000 $26.000 $26.000 $26.500 $25.000 $31.750 $25.000 $25.000 $30.000 $27.160
PAV SURF PREP FOR MRK (UTURN ARR)
EA 4.000 $30.000 $36.850 $36.000 $37.100 $35.000 $44.440 $52.000 $35.000 $35.000 $38.020
PAV SURF PREP FOR MRK (WORD)
EA 13.000 $30.000 $36.800 $36.000 $37.100 $35.000 $44.450 $25.000 $35.000 $30.000 $38.020
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 26.000 $10.000 $10.500 $11.000 $10.600 $10.000 $12.700 $16.000 $10.000 $19.000 $10.860
PAV SURF PREP FOR MRK (RPM)
EA 565.000 $2.000 $2.650 $2.600 $2.700 $2.500 $3.170 $0.250 $2.500 $3.000 $2.720
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $3,000.000 $40,485.000 $39,000.000 $33,072.000 $37,931.140 $5,238.520 $37,931.520 $37,931.520 $32,900.000 $41,821.650
REMOVING TRAFFIC SIGNALS
EA 1.000 $6,500.000 $3,727.000 $3,600.000 $5,512.000 $3,491.900 $4,027.890 $3,492.090 $3,492.090 $5,483.000 $3,850.220
TEMP TRAF SIGNALS
EA 2.000 $72,500.000 $120,295.000 $120,000.000 $89,146.000 $112,709.460 $130,011.560 $112,710.400 $112,710.400 $88,681.770 $124,269.600
VEH SIG SEC (12")LED(RED)
EA 24.000 $330.000 $530.000 $505.000 $487.600 $495.420 $571.470 $495.430 $495.430 $485.000 $546.240
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 1,424.000 $3.000 $2.700 $2.600 $3.300 $2.480 $2.860 $2.480 $2.480 $3.000 $2.730
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $1,000.000 $930.000 $900.000 $434.600 $872.990 $1,006.990 $873.030 $873.030 $432.000 $962.570
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $15,000.000 $16,065.000 $16,000.000 $14,310.000 $15,051.830 $17,362.410 $15,051.870 $15,051.870 $14,235.000 $16,595.540
INS TRF SIG PL AM(S)1 ARM(48')LUM
EA 1.000 $18,000.000 $19,890.000 $19,000.000 $18,550.000 $18,637.040 $21,497.990 $18,637.050 $18,637.080 $18,453.000 $20,548.440
INS TRF SIG PL AM(S)2 ARM(36-32')LUM
EA 1.000 $18,000.000 $24,760.000 $24,000.000 $21,306.000 $23,203.960 $26,765.970 $23,204.000 $23,204.000 $21,195.000 $25,583.720
INS TRF SIG PL AM(S)2 ARM(40-32')LUM
EA 1.000 $18,000.000 $26,060.000 $25,000.000 $22,472.000 $24,418.080 $28,166.460 $24,418.120 $24,418.120 $22,355.000 $26,922.350
FULL - WIDTH MOWING
CYC 8.000 $4,000.000 $5,000.000 $4,000.000 $4,558.000 $1,750.000 $5,304.770 $4,540.000 $6,012.250 $5,669.000 $5,498.920
LITTER REMOVAL
CYC 8.000 $3,000.000 $2,585.000 $2,300.000 $1,272.000 $2,750.000 $4,051.450 $2,544.610 $4,843.360 $2,437.000 $2,862.310
BONDING COURSE
GAL 8,368.000 $4.000 $4.000 $4.000 $4.000 $3.800 $4.900 $3.800 $3.800 $4.000 $4.130
TIP TESTING(DRILL SHAFT)
EA 6.000 $10,000.000 $21,025.000 $4,800.000 $5,300.000 $5,000.000 $8,074.560 $4,000.000 $4,000.000 $7,000.000 $4,345.040
INSTALL DMS (FOUNDATION MTD CABINET)
EA 1.000 $22,500.000 $15,250.000 $16,000.000 $17,066.000 $14,285.660 $16,478.660 $14,286.230 $14,286.230 $16,977.000 $15,751.380
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 1.000 $8,200.000 $9,600.000 $9,300.000 $8,798.000 $8,991.130 $10,371.330 $8,991.220 $8,991.220 $8,752.000 $9,913.330
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 7.000 $6,000.000 $6,035.000 $5,900.000 $5,406.000 $5,653.620 $6,521.500 $5,653.690 $5,653.690 $5,378.000 $6,233.510
ITS POLE (60 FT)(90 MPH)
EA 7.000 $25,000.000 $33,610.000 $32,500.000 $25,758.000 $31,490.500 $36,324.620 $31,490.570 $31,490.570 $25,624.000 $34,720.130
DEAD END ROADWAY BARRICADE
LF 42.000 $100.000 $240.000 $60.000 $91.600 $50.000 $196.100 $142.000 $239.000 $170.000 $54.320
INSTALLATION OF CELLULAR MODEM
EA 3.000 $1,300.000 $6,440.000 $6,250.000 $540.600 $6,031.890 $6,957.840 $6,032.080 $6,032.080 $538.000 $6,650.710
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 9.000 $3,000.000 $1,865.000 $1,900.000 $2,544.000 $1,891.290 $2,013.960 $1,746.040 $1,746.040 $2,531.000 $1,925.110
CCTV MOUNT (POLE)
EA 7.000 $500.000 $2,400.000 $2,300.000 $32.900 $2,249.360 $2,594.660 $2,249.470 $2,249.470 $33.000 $2,480.170
TRAIL MNT SOL PRD RAD SPEED CNT MONITOR
EA 2.000 $16,000.000 $8,515.000 $10,500.000 $15,900.000 $19,000.000 $13,694.460 $16,102.000 $15,260.000 $6,300.000 $9,524.620
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 16,095.000 $5.000 $1.400 $1.400 $3.300 $1.280 $1.480 $1.280 $1.280 $4.000 $1.410
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 7.000 $1,200.000 $4,526.000 $4,500.000 $1,378.000 $4,241.190 $4,892.250 $4,241.380 $4,241.380 $1,371.000 $4,676.370
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
LF 9,060.000 $5.000 $3.000 $3.000 $4.900 $2.840 $3.280 $2.840 $2.840 $5.000 $3.130
FIBER OPTIC PATCH PANEL (144 POSITIONS)
EA 3.000 $6,000.000 $2,800.000 $2,800.000 $9,010.000 $2,624.470 $3,027.340 $2,624.530 $2,624.530 $8,963.000 $2,893.690
ETHERNET SWITCH (INSTALL ONLY)
EA 10.000 $500.000 $745.000 $750.000 $572.400 $698.380 $805.580 $698.420 $698.420 $569.000 $770.050
ITS GRND MNT CAB (TY 6)(CONF 1)
EA 1.000 $13,000.000 $12,685.000 $12,500.000 $21,518.000 $11,884.580 $13,708.970 $11,884.650 $11,884.650 $21,406.000 $13,103.450
TEMP Q-DETECT (TY2) (1 SYS)
DAY 970.000 $20.000 $67.000 $64.000 $76.400 $240.000 $248.000 $125.000 $286.080 $300.000 $63.890
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 26.000 $1,000.000 $605.000 $1,750.000 $1,802.000 $500.000 $882.560 $1,093.730 $1,755.800 $7,600.000 $2,281.150
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 10.000 $1,800.000 $605.000 $2,100.000 $4,293.000 $750.000 $4,315.180 $2,187.450 $2,750.000 $13,361.000 $2,281.150
Totals: $67,216,534.769 $58,558,558.860 $59,399,862.954 $61,539,627.129 $63,659,154.491 $64,374,438.012 $64,840,024.015 $67,604,552.800 $68,040,789.590 $68,648,699.325
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $35,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $300,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $7,000.00
Total: $342,000.00