BANDERA SH0016 (6488-64-001)

Items: 23

County: BANDERA
Length: 0.0100 MILES
Highway: SH0016
District: SAN ANTONIO
Control Number: 6488-64-001
DBE Goal: 0.0%
Project: BPM - A00217164
Guaranty: $2,000.00
Time: 14 WORKING DAYS
Engineer's Estimate: $83,556.21
Date: 09/17/2025 (8 months ago) Changed
Contract Number: 9251506
Type: EROSION REPAIR
Project ID: A00217164
Project Description: EROSION REPAIR AND MBGF REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
4615 NW LOOP 410, SAN ANTONIO, TX 78229
HENRY FOJTIK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$83,556.21
$92,080.00
Over/Under Est: 10.2% $8,523.79
Over/Under Est: 12.43% $10,385.79
Amt Left: 2.02% $1,862.00
Over/Under Est: 13.73% $11,474.79
Amt Left: 3.2% $2,951.00
Delta: -1.16% -$1,089.00

Bid Items & Bid Tabulations

23 Total 0 of 23
BANDERA  |  SH0016  |  SAN ANTONIO  |  6488-64-001  |  09/17/2025  |  $83,556.21  |  BPM - A00217164  |  EROSION REPAIR  |  14 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
DIAMOND R CONTRACTING, LLC
BK FIELD OPERATIONS LLC
REMOV CONC (MISC)
CY 15.000 $50.000 $100.000 $500.000 $250.000
EMBANK (FNL)(OC)(TY B)
CY 70.000 $50.000 $20.000 $20.000 $1.000
RIPRAP (CONC)(4 IN)
CY 27.000 $781.260 $600.000 $500.000 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $974.660 $600.000 $500.000 $950.000
GABION MATTRESSES (GALV)(12 IN)
SY 95.000 $144.000 $100.000 $100.000 $144.000
MOBILIZATION
LS 1.000 $10,000.000 $10,000.000 $10,000.000 $40,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 1.000 $3,500.000 $5,000.000 $5,000.000 $1.000
TMA (STATIONARY)
DAY 14.000 $111.540 $300.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 60.000 $4.440 $6.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $0.540 $1.000 $1.000 $1.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 16.000 $110.000 $80.000 $100.000 $1.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 180.000 $17.360 $100.000 $50.000 $1.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 180.000 $7.800 $20.000 $50.000 $1.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $770.000 $500.000 $5,000.000 $1.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 1.000 $8,500.000 $7,000.000 $5,000.000 $1.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $735.030 $600.000 $1.000 $4,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $316.950 $500.000 $1.000 $750.000
REMOVE SM RD SN (FOUNDATION ONLY)
EA 1.000 $137.500 $500.000 $1.000 $100.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 2.000 $9.000 $50.000 $1.000 $100.000
TREE REMOVAL (4" - 12" DIA)
EA 2.000 $118.500 $500.000 $1.000 $650.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 100.000 $19.000 $40.000 $100.000 $40.000
REALIGN POSTS
EA 18.000 $5.000 $10.000 $100.000 $1.000
REPLACE SINGLE GDRAIL TERM POST (WOOD)
EA 1.000 $115.000 $100.000 $500.000 $200.000
Totals: $83,556.210 $92,080.000 $93,942.000 $95,031.000