Show Job Controls
Bid Cobra

BANDERA PR0037 (6447-53-001)

Items: 20

County: BANDERA
Length: N/A
Highway: PR0037
District: SAN ANTONIO
Control Number: 6447-53-001
DBE Goal: 0.0%
Project: BPM - 644753001
Guaranty: N/A
Time: 12 W
Engineer's Estimate: $74,785.70
Date: 03/20/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE SCOUR REPAIR
Mail/Deliver Bids To: N/A
HENRY FOJTIK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$74,785.70
$74,474.00
Over/Under Est: -0.42% -$311.70
Over/Under Est: 45.25% $33,843.60
Amt Left: 45.86% $34,155.30
Over/Under Est: 116.04% $86,784.43
Amt Left: 116.95% $87,096.13
Delta: -48.74% -$52,940.83

Bid Items & Bid Tabulations

20 Total 0 of 20
BANDERA  |  PR0037  |  SAN ANTONIO  |  6447-53-001  |  03/20/2024  |  $74,785.70  |  BPM - 644753001  |  BRIDGE SCOUR REPAIR  |  12 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
CRACKSEAL OF TEXAS, LLC
REMOVING CONC (RIPRAP)
CY 2.000 $120.000 $100.000 $258.330 $1,750.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 10.000 $85.130 $50.000 $403.550 $40.000
COMPOST MANUF TOPSOIL (4")
SY 250.000 $5.340 $6.000 $14.910 $200.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 250.000 $0.880 $1.000 $7.750 $5.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 250.000 $6.690 $5.000 $11.900 $5.000
FLOWABLE BACKFILL
CY 13.000 $432.140 $800.000 $370.420 $250.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 16.000 $159.170 $100.000 $446.390 $1,050.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 26.000 $236.850 $300.000 $285.960 $1,250.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 5.000 $300.000 $300.000 $1,243.850 $900.000
GABION MATTRESSES (GALV)(12 IN)
SY 76.000 $227.750 $300.000 $131.840 $220.000
GABION (1.5' X 3')(GALV)
CY 13.000 $300.000 $300.000 $1,034.820 $350.000
CLEAN EXIST CULVERTS
EA 1.000 $6,727.940 $5,000.000 $4,101.100 $7,000.000
MOBILIZATION
LS 1.000 $10,000.000 $5,000.000 $24,031.300 $1,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 1.000 $3,500.000 $5,000.000 $877.520 $0.010
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $36.960 $1.000 $30.860 $100.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $12.730 $1.000 $29.130 $50.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 55.000 $8.730 $5.000 $28.720 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 55.000 $2.360 $5.000 $4.350 $5.000
TREE AND BRUSH REMOVAL
AC 0.100 $25,568.140 $10,000.000 $40,413.260 $15,000.000
TMA (STATIONARY)
DAY 12.000 $372.940 $500.000 $396.980 $0.010
Totals: $74,785.704 $74,474.000 $108,629.306 $161,570.130