Show Job Controls
Bid Cobra

BANDERA RM1077 (6439-56-001)

Items: 21

County: BANDERA
Length: N/A
Highway: RM1077
District: SAN ANTONIO
Control Number: 6439-56-001
DBE Goal: 0.0%
Project: BPM - 643956001
Guaranty: N/A
Time: 16 W
Engineer's Estimate: $85,256.07
Date: 05/16/2024 (2 years ago)
Contract Number: N/A
Type: EROSION REPAIR
Mail/Deliver Bids To: N/A
HENRY FOJTIK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$85,256.07
$75,915.00
Over/Under Est: -10.96% -$9,341.07
Over/Under Est: 2.43% $2,070.93
Amt Left: 15.03% $11,412.00
Over/Under Est: 7.4% $6,310.93
Amt Left: 20.62% $15,652.00
Delta: -4.86% -$4,240.00
Over/Under Est: 36.38% $31,019.93
Amt Left: 53.17% $40,361.00
Delta: -26.98% -$24,709.00
Over/Under Est: 65.31% $55,683.93
Amt Left: 85.66% $65,025.00
Delta: -21.21% -$24,664.00
Over/Under Est: 115.71% $98,653.93
Amt Left: 142.26% $107,995.00
Delta: -30.49% -$42,970.00

Bid Items & Bid Tabulations

21 Total 0 of 21
BANDERA  |  RM1077  |  SAN ANTONIO  |  6439-56-001  |  05/16/2024  |  $85,256.07  |  BPM - 643956001  |  EROSION REPAIR  |  16 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
DIAMOND R CONTRACTING, LLC
TEXAS ROAD CONSTRUCTION, LLC
BECK-REIT & SONS, LTD.
AAD CONTRACTING INC.
CRACKSEAL OF TEXAS, LLC
FNH CONSTRUCTION, LLC
REMOVING CONC (MISC)
SY 4.000 $250.000 $1,000.000 $400.000 $100.000 $45.000 $500.000 $1,000.000
EXCAVATION (CHANNEL)
CY 5.000 $90.000 $1,000.000 $800.000 $75.000 $25.000 $2,000.000 $1,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 10.000 $80.500 $500.000 $300.000 $100.000 $55.000 $50.000 $500.000
COMPOST MANUF TOPSOIL (4")
SY 250.000 $5.000 $10.000 $12.000 $6.000 $10.000 $120.000 $20.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 250.000 $0.330 $0.500 $4.000 $2.000 $2.500 $50.000 $10.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 250.000 $11.580 $0.500 $18.000 $5.000 $3.000 $50.000 $20.000
FLOWABLE BACKFILL
CY 9.000 $600.000 $200.000 $100.000 $1,500.000 $275.000 $500.000 $500.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 9.000 $200.000 $250.000 $300.000 $188.000 $200.000 $400.000 $185.000
GABION MATTRESSES (GALV)(12 IN)
SY 120.000 $135.000 $125.000 $200.000 $233.000 $200.000 $70.000 $325.000
GABION (1.5' X 3')(GALV)
CY 60.000 $350.000 $150.000 $400.000 $350.000 $300.000 $70.000 $350.000
CLEAN EXIST CULVERTS
EA 1.000 $500.000 $5,000.000 $1.000 $500.000 $2,500.000 $3,900.000 $5,000.000
MOBILIZATION
LS 1.000 $10,000.000 $12,000.000 $12,000.000 $8,000.000 $25,000.000 $10,000.000 $20,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 1.000 $3,500.000 $2,500.000 $1,000.000 $3,500.000 $10,000.000 $1,000.000 $8,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $40.000 $1.000 $15.000 $1.000 $25.000 $70.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $20.000 $1.000 $15.000 $1.000 $8.000 $50.000 $20.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 75.000 $20.000 $4.000 $1.000 $1.000 $8.000 $10.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 75.000 $15.000 $1.000 $1.000 $1.000 $3.000 $10.000 $9.000
TREE REMOVAL (30" - 36" DIA)
EA 1.000 $4,000.000 $1,000.000 $1,000.000 $2,000.000 $650.000 $9,000.000 $10,000.000
TREE AND BRUSH REMOVAL
AC 0.100 $14,285.710 $50,000.000 $1,000.000 $30,000.000 $20,000.000 $9,000.000 $100,000.000
TMA (STATIONARY)
DAY 16.000 $225.000 $1.000 $1.000 $1.000 $350.000 $250.000 $250.000
REML & DISPL DRIFTWOOD & DEBRIS
LS 1.000 $2,000.000 $5,000.000 $1,000.000 $5,000.000 $15,000.000 $9,000.000 $25,000.000
Totals: $85,256.071 $75,915.000 $87,327.000 $91,567.000 $116,276.000 $140,940.000 $183,910.000