Show Job Controls
Bid Cobra

BANDERA SH0016 (6329-34-001)

Items: 24

County: BANDERA
Length: N/A
Highway: SH0016
District: SAN ANTONIO
Control Number: 6329-34-001
DBE Goal: N/A
Project: RMC - 632934001
Guaranty: N/A
Time: 75 W
Engineer's Estimate: $1,447,055.90
Date: 04/03/2018 (8 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,447,055.90
$1,235,997.05
Over/Under Est: -14.59% -$211,058.85
$1,410,764.26
Over/Under Est: -2.51% -$36,291.64
Amt Left: 14.14% $174,767.21
Over/Under Est: -1.32% -$19,040.79
Amt Left: 15.54% $192,018.06
Delta: -1.22% -$17,250.85
$1,563,634.50
Over/Under Est: 8.06% $116,578.60
Amt Left: 26.51% $327,637.45
Delta: -9.50% -$135,619.39
$1,994,780.80
Over/Under Est: 37.85% $547,724.90
Amt Left: 61.39% $758,783.75
Delta: -27.57% -$431,146.30

Bid Items & Bid Tabulations

24 Total 0 of 24
BANDERA  |  SH0016  |  SAN ANTONIO  |  6329-34-001  |  04/03/2018  |  $1,447,055.90  |  RMC - 632934001  |  GUARDRAIL REPAIR  |  75 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
3LW CIVIL LLC
CHAMPION INFRASTRUCTURE, LLC
K-BAR SERVICES, INC.
SJ&J CONSTRUCTION, LLC
REMOVING CONCRETE(MOW STRIP)
LF 160.000 $12.000 $5.000 $8.000 $80.000 $10.000 $10.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 200.000 $25.000 $65.000 $40.000 $60.000 $50.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 27,378.000 $1.210 $1.500 $1.000 $4.500 $5.000 $4.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 27,378.000 $0.150 $0.200 $0.420 $0.180 $2.000 $0.600
VEGETATIVE WATERING
MG 428.000 $16.490 $8.000 $65.000 $100.000 $50.000 $60.000
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 27,378.000 $5.950 $3.400 $1.750 $3.690 $6.000 $4.000
RIPRAP (MOW STRIP)(4 IN)
CY 676.000 $475.000 $410.000 $778.000 $500.000 $425.000 $800.000
MOBILIZATION
LS 1.000 $150,000.000 $117,000.000 $105,000.000 $120,000.000 $77,378.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $15,000.000 $9,000.000 $10,000.000 $6,500.000 $6,000.000 $6,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 6,085.000 $3.650 $2.200 $0.500 $3.500 $6.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,085.000 $0.750 $0.500 $0.500 $1.000 $2.000 $6.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 336.000 $65.000 $75.000 $75.000 $120.000 $120.000 $200.000
MTL W-BEAM GD FEN (TIM POST)
LF 14,850.000 $25.000 $22.000 $19.000 $21.000 $23.000 $26.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,200.000 $1,000.000 $1,111.000 $925.000 $1,300.000 $1,000.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $23.000 $21.500 $24.000 $19.000 $29.000 $40.000
REMOVE METAL BEAM GUARD FENCE
LF 11,775.000 $3.000 $1.250 $2.000 $1.250 $1.500 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 63.000 $250.000 $125.000 $212.000 $200.000 $200.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 68.000 $2,000.000 $2,750.000 $2,450.000 $2,100.000 $2,900.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $800.000 $205.000 $275.000 $200.000 $500.000 $400.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 632.000 $24.000 $12.000 $12.500 $25.000 $40.000 $60.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 8.000 $40.000 $35.000 $50.000 $80.000 $35.000 $60.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 632.000 $24.000 $14.000 $17.000 $25.000 $35.000 $60.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 150.000 $80.000 $90.000 $135.000 $80.000 $100.000 $150.000
TMA (STATIONARY)
DAY 150.000 $150.000 $145.000 $255.000 $250.000 $300.000 $220.000
Totals: $1,447,055.900 $1,235,997.050 $1,410,764.260 $1,428,015.110 $1,563,634.500 $1,994,780.800