AUSTIN CR (0913-20-089)

Items: 32

County: AUSTIN
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-20-089
DBE Goal: N/A
Project: BR 2018(205)
Guaranty: N/A
Time: 151 WORKING DAYS
Engineer's Estimate: $747,719.50
Date: 11/05/2019 (6 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$747,719.50
1
$725,918.90
Over/Under Est: -2.92% -$21,800.60
Over/Under Est: 3.87% $28,968.30
Amt Left: 6.99% $50,768.90
Over/Under Est: 21.17% $158,280.50
Amt Left: 24.81% $180,081.10
Delta: -16.65% -$129,312.20
Over/Under Est: 26.79% $200,350.00
Amt Left: 30.6% $222,150.60
Delta: -4.64% -$42,069.50
$969,001.10
Over/Under Est: 29.59% $221,281.60
Amt Left: 33.49% $243,082.20
Delta: -2.21% -$20,931.60
Over/Under Est: 32.4% $242,225.30
Amt Left: 36.37% $264,025.90
Delta: -2.16% -$20,943.70
Subcontractor Percentage Amount
HEMPHILL WBE PILE DRIVING CO. 9.63% $69,905.99
LONESTAR TRAFFIC SAFETY, LLC 0.81% $5,879.94
Total: 10.44% $75,785.93

Bid Items & Bid Tabulations

32 Total 0 of 32
AUSTIN  |  CR  |  YOAKUM  |  0913-20-089  |  11/05/2019  |  $747,719.50  |  BR 2018(205)  |  REPLACE BRIDGE AND APPROACHES  |  151 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
STATELINE CONSTRUCTION, LLC
ANGEL BROTHERS HOLDINGS CORP.
KNIFE RIVER CORPORATION - SOUTH
3LW CIVIL LLC
FUQUA CONSTRUCTION CO., INC.
PREPARING ROW
STA 8.100 $2,000.000 $3,000.000 $2,110.000 $3,500.000 $3,500.000 $2,000.000 $8,000.000
EXCAVATION (ROADWAY)
CY 100.000 $15.000 $10.000 $35.000 $42.000 $60.000 $30.000 $15.000
EXCAVATION (CHANNEL)
CY 560.000 $20.000 $10.000 $35.000 $42.000 $18.000 $30.000 $26.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 150.000 $20.000 $35.000 $45.000 $42.000 $45.000 $35.000 $20.000
BLADING
HR 40.000 $100.000 $25.000 $75.000 $70.000 $115.000 $165.000 $95.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 1,372.000 $1.000 $0.500 $3.000 $1.000 $1.700 $2.000 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 343.000 $1.000 $1.000 $0.500 $1.000 $1.650 $2.000 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 343.000 $1.000 $1.000 $3.000 $1.000 $1.650 $2.000 $1.000
VEGETATIVE WATERING
MG 15.400 $60.000 $25.000 $25.000 $45.000 $70.000 $150.000 $60.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 345.000 $100.000 $130.000 $86.000 $140.000 $94.000 $150.000 $148.000
CEM STABIL BKFL
CY 47.000 $120.000 $100.000 $225.000 $270.000 $208.000 $200.000 $185.000
PRESTR CONC PIL (16 IN SQ)
LF 1,253.000 $110.000 $118.000 $110.000 $110.000 $102.000 $120.000 $110.000
CL C CONC (ABUT)
CY 39.800 $850.000 $700.000 $1,125.000 $1,200.000 $1,300.000 $1,100.000 $1,300.000
CL C CONC (CAP)
CY 27.000 $1,000.000 $677.000 $1,315.000 $1,700.000 $1,400.000 $325.000 $1,400.000
REINF CONC SLAB (SLAB BEAM)
SF 4,030.000 $17.000 $17.000 $19.250 $35.000 $22.400 $18.000 $28.000
PRESTR CONC SLAB BEAM (5SB12)
LF 759.900 $175.000 $181.000 $172.000 $160.000 $208.000 $199.000 $200.000
RIPRAP (CONC)(5 IN)
CY 15.000 $450.000 $300.000 $650.000 $700.000 $500.000 $650.000 $457.120
RIPRAP (STONE PROTECTION)(12 IN)
CY 239.000 $140.000 $140.000 $110.000 $170.000 $150.000 $180.000 $187.000
RAIL (TY T223)
LF 358.000 $100.000 $92.000 $110.000 $120.000 $117.000 $190.000 $116.000
ARMOR JOINT (SEALED)
LF 90.000 $75.000 $55.000 $95.000 $85.000 $95.000 $75.000 $75.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $25,000.000 $20,000.000 $18,000.000 $25,000.000 $15,000.000 $10,000.000 $22,000.000
MOBILIZATION
LS 1.000 $60,000.000 $75,000.000 $70,000.000 $85,929.500 $186,500.000 $150,000.000 $145,600.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,000.000 $800.000 $1,200.000 $600.000 $1,520.000 $8,000.000 $1,100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,725.000 $3.000 $2.000 $3.000 $2.500 $4.240 $3.000 $4.200
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,725.000 $1.000 $1.000 $1.000 $1.000 $2.000 $1.000 $1.200
MTL W-BEAM GD FEN (TIM POST)
LF 150.000 $25.000 $31.000 $30.000 $32.000 $32.600 $22.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $1,507.000 $2,250.000 $2,200.000 $1,990.000 $2,000.000 $1,800.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,150.000 $973.000 $1,900.000 $1,000.000 $1,350.000 $1,400.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,800.000 $2,290.000 $2,750.000 $1,850.000 $2,988.000 $3,000.000 $2,800.000
REMOVE SM RD SN SUP&AM
EA 5.000 $75.000 $50.000 $200.000 $50.000 $100.000 $120.000 $75.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 16.000 $15.000 $5.000 $45.000 $17.000 $22.000 $30.000 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $20.000 $11.000 $45.000 $21.000 $38.000 $30.000 $25.000
Totals: $747,719.500 $725,918.900 $776,687.800 $906,000.000 $948,069.500 $969,001.100 $989,944.800