AUSTIN FM 1458 (0527-03-024)

Items: 46

County: AUSTIN
Length: N/A
Highway: FM 1458
District: YOAKUM
Control Number: 0527-03-024
DBE Goal: N/A
Project: STP 2017(493)HES
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $711,455.90
Date: 01/05/2017 (9 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$711,455.90
$1,002,148.60
Over/Under Est: 40.86% $290,692.70
Over/Under Est: 76.35% $543,174.50
Amt Left: 25.19% $252,481.80

Bid Items & Bid Tabulations

46 Total 0 of 46
AUSTIN  |  FM 1458  |  YOAKUM  |  0527-03-024  |  01/05/2017  |  $711,455.90  |  STP 2017(493)HES  |  SAFETY TREAT FIXED OBJECTS  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SJ&J CONSTRUCTION, LLC
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 5.000 $4,000.000 $1,500.000 $6,000.000
REMOVING CONC (CURB)
LF 200.000 $10.000 $12.000 $60.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,334.000 $22.000 $30.000 $55.000
BLADING
HR 20.000 $125.000 $100.000 $100.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 5,550.000 $0.750 $0.500 $0.500
VEGETATIVE WATERING
MG 46.700 $50.000 $60.000 $50.000
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 248.000 $150.000 $80.000 $140.000
CEM STABIL BKFL
CY 25.000 $125.000 $160.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 20.000 $50.000 $20.000 $120.000
RETROFIT RAIL (TY T131RC)
LF 459.620 $170.000 $180.000 $170.000
CMP (GAL STL 18 IN)
LF 8.000 $100.000 $70.000 $500.000
CONC BOX CULV (8 FT X 8 FT)
LF 40.000 $900.000 $1,500.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 92.000 $60.000 $70.000 $210.000
RC PIPE (CL III)(24 IN)
LF 176.000 $75.000 $110.000 $250.000
RC PIPE (CL III)(30 IN)
LF 30.000 $90.000 $180.000 $260.000
RC PIPE (CL III)(36 IN)
LF 68.000 $100.000 $230.000 $230.000
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $26,000.000 $40,000.000 $40,000.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 8.000 $1,200.000 $1,300.000 $2,100.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 18.000 $600.000 $1,600.000 $2,100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 32.000 $1,000.000 $1,700.000 $2,300.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 22.000 $1,400.000 $2,000.000 $2,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 12.000 $1,200.000 $2,000.000 $2,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 76.000 $1,200.000 $2,100.000 $2,800.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $2,500.000 $2,700.000 $3,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 1.000 $2,500.000 $2,800.000 $4,700.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 11.000 $2,500.000 $3,000.000 $4,400.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 6.000 $3,000.000 $3,500.000 $5,700.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 4.000 $3,200.000 $4,000.000 $7,700.000
REMOV STR (SMALL)
EA 13.000 $250.000 $200.000 $450.000
MOBILIZATION
LS 1.000 $62,000.000 $100,000.000 $120,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,000.000 $5,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $10.000 $30.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $5.000 $15.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,100.000 $4.000 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,100.000 $2.000 $1.000 $0.500
DRIVEWAYS (BASE)
SY 100.000 $30.000 $50.000 $25.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,113.000 $20.000 $60.000 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,500.000 $250.000 $2,000.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 87.000 $50.000 $60.000 $70.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $2.000 $10.000 $5.500
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $150.000 $400.000 $450.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,500.000 $250.000 $2,300.000
WIRE FENCE (TY A)
LF 250.000 $15.000 $60.000 $15.000
GATE (TY 1)
EA 1.000 $1,500.000 $1,500.000 $1,000.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 20.000 $45.000 $60.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $30.000 $70.000 $28.000
Totals: $711,455.900 $1,002,148.600 $1,254,630.400