AUSTIN SH 159 (0408-02-046)

Items: 77

County: AUSTIN
Length: N/A
Highway: SH 159
District: YOAKUM
Control Number: 0408-02-046
DBE Goal: N/A
Project: BR 2018(508)
Guaranty: N/A
Time: 300 WORKING DAYS
Engineer's Estimate: $4,363,073.00
Date: 02/02/2018 (8 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (10)
E
Engineer's Estimate
$4,363,073.00
$3,793,059.92
Over/Under Est: -13.06% -$570,013.08
Over/Under Est: -10.57% -$461,228.76
Amt Left: 2.87% $108,784.32
Over/Under Est: -6.96% -$303,717.59
Amt Left: 7.02% $266,295.49
Delta: -4.04% -$157,511.17
Over/Under Est: -2.65% -$115,722.27
Amt Left: 11.98% $454,290.81
Delta: -4.63% -$187,995.32
Over/Under Est: 0.08% $3,643.16
Amt Left: 15.12% $573,656.24
Delta: -2.81% -$119,365.43
Over/Under Est: 0.38% $16,718.99
Amt Left: 15.47% $586,732.07
Delta: -0.30% -$13,075.83
$4,379,953.65
Over/Under Est: 0.39% $16,880.65
Amt Left: 15.47% $586,893.73
Delta: 0.00% -$161.66
Over/Under Est: 3.38% $147,580.52
Amt Left: 18.92% $717,593.60
Delta: -2.98% -$130,699.87
$4,644,701.69
Over/Under Est: 6.45% $281,628.69
Amt Left: 22.45% $851,641.77
Delta: -2.97% -$134,048.17
Over/Under Est: 22.94% $1,000,782.13
Amt Left: 41.41% $1,570,795.21
Delta: -15.48% -$719,153.44

Bid Items & Bid Tabulations

77 Total 0 of 77
AUSTIN  |  SH 159  |  YOAKUM  |  0408-02-046  |  02/02/2018  |  $4,363,073.00  |  BR 2018(508)  |  REPLACE BRIDGE AND APPROACHES  |  300 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
KNIFE RIVER CORPORATION - SOUTH
FORDE CONSTRUCTION COMPANY, INC.
A GREATER AUSTIN DEVELOPMENT COMPANY, LTD.
JOHN REED AND COMPANY, LLC
HILL COUNTRY BRIDGE, INC.
DAN WILLIAMS COMPANY
JAMES CONSTRUCTION GROUP, L.L.C.
ISI CONTRACTING, INC.
FUQUA CONSTRUCTION CO., INC.
PREPARING ROW
STA 21.000 $3,000.000 $3,750.000 $700.000 $2,000.000 $800.000 $2,000.000 $2,935.000 $5,000.000 $8,400.000 $1,500.000 $851.400
OBLITERATING ABANDONED ROAD
SY 3,429.000 $10.000 $2.000 $3.770 $4.000 $14.150 $2.000 $10.100 $3.500 $6.300 $5.000 $4.840
EXCAVATION (ROADWAY)
CY 1,220.000 $15.000 $6.000 $7.130 $9.000 $12.000 $15.000 $23.500 $10.000 $13.520 $7.000 $8.960
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 5,455.000 $15.000 $14.000 $5.600 $15.000 $16.500 $15.000 $25.650 $15.000 $16.030 $16.000 $7.110
BLADING
HR 26.000 $100.000 $85.000 $100.000 $82.000 $125.000 $20.000 $98.000 $45.000 $89.510 $80.000 $128.750
FURNISHING AND PLACING TOPSOIL (4")
SY 6,178.000 $3.000 $1.500 $0.410 $1.250 $3.500 $1.000 $2.370 $1.250 $0.950 $3.100 $0.520
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 6,178.000 $1.000 $0.250 $0.260 $0.540 $0.570 $0.500 $0.500 $0.550 $0.250 $0.280 $0.460
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,545.000 $0.500 $0.250 $0.260 $1.510 $1.600 $0.500 $0.930 $0.900 $0.250 $0.280 $0.460
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,545.000 $0.500 $0.250 $0.260 $1.510 $1.600 $0.500 $0.930 $0.900 $0.250 $0.280 $0.460
VEGETATIVE WATERING
MG 52.000 $60.000 $15.000 $29.000 $60.000 $65.000 $20.000 $77.000 $15.000 $25.000 $14.000 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 1,003.000 $2.000 $2.000 $2.110 $1.170 $1.200 $1.500 $1.950 $2.000 $2.000 $2.250 $1.720
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 1,548.000 $85.000 $84.000 $65.750 $88.000 $87.800 $76.000 $95.500 $69.000 $68.610 $81.000 $82.660
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 127.000 $165.000 $150.000 $148.000 $174.000 $200.000 $100.000 $165.750 $148.000 $1.000 $148.000 $196.730
LIME TRT (SUBGRADE)(8")
SY 3,977.000 $3.000 $4.000 $0.250 $5.250 $10.550 $1.000 $7.750 $3.000 $0.100 $1.000 $5.800
CEMENT
TON 206.000 $140.000 $128.000 $127.000 $169.010 $200.000 $100.000 $164.750 $126.000 $1.000 $135.000 $169.950
CEMENT TREAT (SUBGRADE) (8")
SY 3,977.000 $3.000 $2.500 $2.900 $7.000 $8.500 $1.000 $6.250 $3.000 $0.100 $3.000 $3.620
PRIME COAT (MC-30)
GAL 3,301.000 $4.000 $4.100 $4.700 $5.000 $4.550 $4.500 $4.120 $4.650 $5.620 $5.000 $5.890
AGGR(TY-PB GR-4 SAC-B)
CY 95.000 $90.000 $200.000 $233.000 $180.000 $166.000 $210.000 $128.800 $170.000 $248.340 $225.000 $309.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 4,400.000 $4.000 $3.500 $3.400 $4.000 $6.550 $4.000 $4.120 $7.000 $3.720 $3.400 $4.330
D-GR HMA TY-B PG64-22
TON 1,338.000 $75.000 $70.000 $74.000 $85.000 $75.000 $83.000 $88.300 $78.000 $101.810 $92.000 $90.550
D-GR HMA TY-D PG64-22
TON 1,674.000 $75.000 $75.000 $70.250 $82.000 $80.700 $88.000 $80.350 $84.000 $106.770 $96.000 $88.540
CEM STABIL BKFL
CY 174.000 $100.000 $140.000 $81.000 $89.000 $180.000 $60.000 $120.000 $120.000 $70.000 $44.000 $145.000
TEMPORARY SPL SHORING
SF 1,700.000 $20.000 $20.000 $11.000 $15.000 $0.010 $3.000 $23.050 $8.000 $25.000 $3.000 $5.000
DRILL SHAFT (18 IN)
LF 152.000 $80.000 $50.000 $43.000 $66.000 $41.500 $100.000 $32.500 $55.000 $32.160 $40.000 $65.750
DRILL SHAFT (36 IN)
LF 3,590.000 $140.000 $135.000 $136.310 $106.000 $130.000 $220.000 $129.100 $155.000 $200.000 $146.000 $197.810
CL C CONC (ABUT)
CY 56.000 $850.000 $850.000 $1,073.000 $1,500.000 $1,100.000 $1,200.000 $800.000 $950.000 $1,200.000 $1,170.000 $900.000
CL C CONC (CAP)
CY 215.000 $850.000 $770.000 $1,360.000 $1,100.000 $890.000 $1,200.000 $801.000 $1,200.000 $1,200.000 $1,030.000 $1,450.000
CL C CONC (COLUMN)
CY 258.000 $900.000 $650.000 $580.000 $980.000 $850.000 $1,200.000 $771.000 $750.000 $750.000 $660.000 $1,500.000
REINF CONC SLAB
SF 36,580.000 $16.000 $15.000 $17.000 $16.000 $16.250 $12.000 $15.410 $14.500 $17.000 $22.000 $25.000
APPROACH SLAB
CY 71.000 $550.000 $450.000 $485.000 $650.000 $640.000 $500.000 $411.000 $450.000 $550.000 $494.000 $700.000
PRESTR CONC GIRDER (TX34)
LF 5,038.000 $140.000 $125.000 $128.000 $130.000 $120.000 $120.000 $124.700 $150.000 $150.000 $154.000 $147.350
RIPRAP (CONC)(5 IN)
CY 368.000 $450.000 $350.000 $360.000 $383.000 $410.000 $300.000 $450.000 $380.000 $259.740 $305.000 $400.000
RIPRAP (CONC)(FLUME)
CY 6.000 $500.000 $500.000 $950.000 $990.000 $570.000 $300.000 $490.000 $425.000 $563.020 $675.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 46.000 $550.000 $420.000 $480.000 $460.000 $720.000 $400.000 $510.000 $450.000 $662.060 $498.000 $645.000
RAIL (TY T223)
LF 1,644.000 $75.000 $85.000 $80.000 $110.000 $125.000 $60.000 $94.500 $60.000 $70.900 $75.000 $95.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 230.000 $80.000 $82.000 $82.000 $114.000 $98.000 $41.000 $89.500 $85.000 $60.170 $56.000 $97.790
RC PIPE (CL III)(30 IN)
LF 64.000 $150.000 $100.000 $104.000 $90.000 $110.000 $80.000 $98.700 $90.000 $100.290 $80.000 $100.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $1,500.000 $3,000.000 $3,360.000 $4,800.000 $3,600.000 $2,000.000 $2,720.000 $2,500.000 $2,100.420 $2,400.000 $3,500.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $200,000.000 $140,000.000 $186,000.000 $140,000.000 $125,000.000 $195,000.000 $164,000.000 $150,000.000 $74,376.040 $200,000.000 $217,994.230
REMOV STR (SMALL)
EA 1.000 $1,000.000 $900.000 $550.000 $1,700.000 $1,600.000 $1,000.000 $1,050.000 $1,000.000 $5,726.590 $560.000 $2,000.000
MOBILIZATION
LS 1.000 $380,000.000 $250,000.000 $320,000.000 $220,000.000 $420,000.000 $430,000.000 $437,000.000 $425,000.000 $449,400.000 $460,000.000 $448,715.340
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $3,000.000 $1,600.000 $1,950.000 $3,000.000 $1,000.000 $2,400.000 $5,510.000 $6,500.000 $1,024.900 $1,300.000 $581.540
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 90.000 $30.000 $30.000 $31.000 $30.100 $32.000 $30.000 $36.000 $33.000 $29.500 $33.000 $31.750
ROCK FILTER DAMS (REMOVE)
LF 90.000 $10.000 $7.000 $7.350 $10.860 $11.500 $10.000 $13.300 $9.000 $7.000 $8.000 $11.430
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,153.000 $2.500 $2.300 $2.370 $1.910 $2.000 $3.000 $3.000 $2.000 $2.250 $2.500 $3.180
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,153.000 $1.000 $0.500 $0.500 $0.660 $0.700 $1.000 $0.770 $0.500 $0.500 $0.600 $0.960
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,830.000 $50.000 $41.000 $13.520 $38.000 $36.000 $55.000 $33.850 $35.000 $9.600 $64.000 $87.440
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,050.000 $20.000 $8.000 $6.790 $3.500 $3.000 $3.000 $6.500 $5.000 $5.920 $9.000 $36.150
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,830.000 $15.000 $10.000 $13.500 $10.000 $9.000 $6.000 $16.650 $15.000 $5.030 $13.000 $11.560
DRIVEWAYS (CONC)
SY 94.000 $70.000 $62.000 $95.000 $105.000 $89.000 $60.000 $95.100 $60.000 $60.970 $92.000 $81.000
DRIVEWAYS (SURF TREAT)
SY 178.000 $30.000 $19.000 $22.000 $37.000 $34.000 $7.000 $35.550 $34.000 $33.520 $90.000 $27.810
DRIVEWAYS (BASE)
SY 139.000 $25.000 $13.000 $11.000 $19.000 $18.500 $14.000 $22.200 $16.000 $21.030 $69.000 $13.390
MTL W-BEAM GD FEN (TIM POST)
LF 675.000 $20.000 $19.000 $19.100 $17.500 $18.500 $17.500 $19.600 $20.000 $18.150 $17.000 $22.230
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $1,200.000 $1,600.000 $1,317.730 $1,400.000 $1,700.000 $1,400.000 $1,432.000 $1,500.000 $1,252.000 $2,150.000 $1,778.000
SHORT RADIUS
LF 25.000 $50.000 $25.000 $25.580 $25.000 $26.500 $25.000 $22.650 $23.000 $24.300 $39.000 $31.750
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $850.000 $600.000 $605.190 $900.000 $960.000 $900.000 $463.500 $500.000 $575.000 $570.000 $1,143.000
REMOVE METAL BEAM GUARD FENCE
LF 693.000 $2.500 $1.000 $1.050 $1.000 $1.100 $1.000 $1.550 $2.000 $1.000 $1.000 $1.270
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $130.000 $131.560 $75.000 $80.000 $75.000 $123.600 $125.000 $125.000 $100.000 $95.250
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $250.000 $100.000 $105.250 $250.000 $270.000 $250.000 $133.900 $135.000 $100.000 $200.000 $318.500
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,200.000 $2,400.000 $2,469.170 $2,100.000 $2,200.000 $2,100.000 $1,978.000 $2,500.000 $2,346.000 $2,500.000 $2,667.000
CRASH CUSH ATTEN (INSTL)
EA 4.000 $12,000.000 $8,500.000 $6,841.250 $5,425.000 $9,000.000 $8,475.000 $7,980.000 $7,500.000 $6,500.000 $10,000.000 $10,763.250
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,500.000 $1,300.000 $1,052.500 $1,625.000 $2,100.000 $2,000.000 $1,434.000 $500.000 $1,000.000 $1,400.000 $2,540.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $800.000 $500.000 $526.250 $875.000 $1,100.000 $1,000.000 $417.000 $700.000 $500.000 $1,000.000 $1,270.000
WIRE FENCE (TY A)
LF 597.000 $12.000 $9.000 $9.000 $5.000 $21.500 $20.000 $11.350 $8.000 $3.500 $10.000 $13.250
MAILBOX INSTALL-S (WC-POST) TY 3
EA 3.000 $175.000 $180.000 $185.000 $250.000 $270.000 $250.000 $515.000 $250.000 $175.000 $160.000 $317.500
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 4.000 $400.000 $460.000 $476.780 $395.000 $420.000 $395.000 $670.000 $525.000 $453.000 $500.000 $914.400
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 32.000 $20.000 $11.000 $11.580 $10.000 $10.500 $10.000 $17.500 $18.000 $11.000 $3.350 $12.700
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 19.000 $30.000 $14.000 $14.470 $20.000 $21.500 $20.000 $20.600 $21.000 $13.750 $30.000 $25.400
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 15,202.000 $0.500 $0.480 $0.620 $0.590 $0.630 $1.080 $0.800 $0.500 $0.590 $0.650 $0.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 15,202.000 $0.500 $0.480 $0.620 $0.590 $0.630 $0.750 $0.800 $0.500 $0.590 $0.650 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 760.000 $1.500 $1.000 $0.890 $2.000 $1.100 $2.000 $1.480 $2.000 $2.040 $1.100 $1.250
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 8,000.000 $0.500 $0.440 $0.610 $0.580 $0.620 $0.500 $0.520 $0.420 $0.580 $0.650 $0.740
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 80.000 $0.500 $0.440 $0.840 $0.800 $0.850 $0.500 $1.550 $0.420 $0.800 $0.900 $1.020
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 7,700.000 $0.500 $0.440 $0.610 $0.580 $0.620 $0.500 $0.520 $0.420 $0.580 $0.650 $0.740
REFL PAV MRKR TY II-A-A
EA 100.000 $5.000 $16.000 $7.160 $6.600 $7.200 $5.000 $10.300 $16.000 $6.800 $7.500 $8.640
ELIM EXT PAV MRK & MRKS (4")
LF 12,160.000 $0.500 $0.380 $0.380 $0.360 $0.380 $0.500 $0.670 $0.400 $0.360 $0.400 $0.460
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $8,000.000 $500.000 $7,050.000 $530.000 $4,000.000 $7,850.000 $9,000.000 $10,813.270 $17,000.000 $20,560.000
Totals: $4,363,073.000 $3,793,059.920 $3,901,844.240 $4,059,355.410 $4,247,350.730 $4,366,716.160 $4,379,791.990 $4,379,953.650 $4,510,653.520 $4,644,701.690 $5,363,855.130