AUSTIN SH 36 (0187-04-032)

Items: 64

County: AUSTIN
Length: N/A
Highway: SH 36
District: YOAKUM
Control Number: 0187-04-032
DBE Goal: N/A
Project: STP 2018(356)HES
Guaranty: N/A
Time: 178 WORKING DAYS
Engineer's Estimate: $885,293.50
Date: 12/06/2017 (8 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$885,293.50
$1,049,635.30
Over/Under Est: 18.56% $164,341.80
Over/Under Est: 41.32% $365,808.54
Amt Left: 19.19% $201,466.74
$1,348,976.96
Over/Under Est: 52.38% $463,683.46
Amt Left: 28.52% $299,341.66
Delta: -7.82% -$97,874.92

Bid Items & Bid Tabulations

64 Total 0 of 64
AUSTIN  |  SH 36  |  YOAKUM  |  0187-04-032  |  12/06/2017  |  $885,293.50  |  STP 2018(356)HES  |  SAFETY TREAT FIXED OBJECTS  |  178 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
FUQUA CONSTRUCTION CO., INC.
ALTUS CONSTRUCTION LLC
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 2.000 $2,500.000 $1,000.000 $600.000 $1,745.160
REMOVING CONCRETE(MOW STRIP)
LF 776.000 $8.000 $0.550 $24.000 $12.550
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 790.000 $20.000 $15.000 $25.000 $22.430
BLADING
HR 120.000 $85.000 $100.000 $80.000 $215.150
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 7,300.000 $1.000 $0.300 $2.590 $0.510
VEGETATIVE WATERING
MG 61.500 $80.000 $15.000 $300.000 $57.050
CEM STABIL BKFL
CY 82.600 $150.000 $75.000 $200.000 $122.440
CUT & RESTORING PAV
SY 26.000 $125.000 $150.000 $180.000 $356.030
TRENCH EXCAVATION PROTECTION
LF 40.000 $20.000 $1.000 $30.000 $9.620
TEMPORARY SPL SHORING
SF 1,235.000 $20.000 $5.000 $18.000 $19.540
CL C CONC (HEADWALL)
CY 7.500 $1,500.000 $1,200.000 $2,200.000 $1,931.220
RIPRAP (CONC)(4 IN)
CY 60.700 $450.000 $450.000 $220.000 $671.890
RIPRAP (CONC)(5 IN)
CY 12.500 $450.000 $450.000 $230.000 $822.480
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 89.000 $200.000 $140.000 $160.000 $137.990
RIPRAP (MOW STRIP)(4 IN)
CY 44.000 $550.000 $550.000 $320.000 $693.720
RETROFIT RAIL (TY T131RC)
LF 96.000 $150.000 $170.000 $246.950 $243.050
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 9.000 $850.000 $900.000 $2,500.000 $1,308.210
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 8.000 $900.000 $900.000 $2,800.000 $1,411.850
RC PIPE (CL III)(18 IN)
LF 72.000 $65.000 $75.000 $60.000 $58.480
RC PIPE (CL III)(24 IN)
LF 190.000 $75.000 $125.000 $70.000 $73.400
RC PIPE (CL III)(36 IN)
LF 4.000 $150.000 $200.000 $240.000 $198.510
RC PIPE (CL III)(60 IN)
LF 4.000 $400.000 $400.000 $640.000 $496.160
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $4,500.000 $2,500.000 $4,200.000 $9,886.410
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $6,500.000 $2,500.000 $6,000.000 $11,050.040
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $8,000.000 $4,400.000 $7,200.000 $13,659.820
HEADWALL (CH - PW - 0) (DIA= 60 IN)
EA 2.000 $10,000.000 $5,400.000 $14,800.000 $16,744.170
WINGWALL (FW - 0) (HW=8 FT)
EA 1.000 $20,000.000 $10,000.000 $2,900.000 $18,841.140
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $15,000.000 $9,000.000 $8,800.000 $23,432.620
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $4,500.000 $6,000.000 $7,850.000 $2,449.350
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $5,500.000 $6,500.000 $9,600.000 $3,014.580
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 14.000 $1,000.000 $1,800.000 $610.000 $1,318.880
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 12.000 $1,200.000 $1,800.000 $600.000 $989.160
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 2.000 $1,400.000 $1,800.000 $1,200.000 $1,758.510
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 64.000 $800.000 $1,800.000 $1,100.000 $1,186.990
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 6.000 $1,200.000 $2,000.000 $1,400.000 $2,088.230
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,000.000 $2,000.000 $1,390.000 $1,507.290
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 25.000 $1,000.000 $2,000.000 $1,450.000 $1,271.780
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $1,800.000 $2,000.000 $1,500.000 $2,308.040
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 24.000 $1,200.000 $2,000.000 $1,480.000 $1,789.910
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $2,000.000 $2,200.000 $1,960.000 $2,253.090
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $2,200.000 $2,200.000 $2,500.000 $2,873.270
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $3,200.000 $3,400.000 $2,700.000 $3,728.970
CLEAN EXIST CULVERTS
EA 1.000 $1,500.000 $1,100.000 $5,200.000 $2,418.240
REMOV STR (SMALL)
EA 4.000 $800.000 $100.000 $3,200.000 $1,599.590
REMOVE STR (RAIL)
LF 50.000 $25.000 $20.000 $80.000 $100.910
MOBILIZATION
LS 1.000 $80,000.000 $105,000.000 $113,717.320 $125,607.580
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $3,500.000 $7,000.000 $3,426.300 $6,908.420
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 400.000 $25.000 $25.000 $58.180 $41.940
ROCK FILTER DAMS (REMOVE)
LF 400.000 $5.000 $6.000 $12.930 $11.700
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,275.000 $2.500 $2.000 $3.880 $3.030
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,275.000 $0.500 $1.000 $1.290 $0.930
TURNOUTS (SURF TREAT)
SY 2,645.000 $20.000 $15.000 $55.000 $60.290
DRIVEWAYS (BASE)
SY 85.000 $30.000 $100.000 $56.000 $43.720
MTL W-BEAM GD FEN (TIM POST)
LF 4,639.750 $18.000 $24.000 $29.780 $34.600
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,200.000 $2,600.000 $1,907.090 $2,106.250
SHORT RADIUS
LF 15.000 $50.000 $77.000 $129.290 $38.390
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $20.000 $25.000 $37.170 $30.650
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 101.250 $50.000 $80.000 $151.270 $75.950
REMOVE METAL BEAM GUARD FENCE
LF 3,050.000 $2.250 $1.500 $5.170 $3.600
REMOVE TERMINAL ANCHOR SECTION
EA 18.000 $200.000 $75.000 $155.150 $274.230
RM MTL BM GD FEN TRANS (T101)
EA 8.000 $150.000 $400.000 $355.560 $191.710
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $2,200.000 $2,500.000 $2,779.830 $2,831.360
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 36.000 $40.000 $40.000 $97.000 $89.910
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 128.000 $25.000 $14.000 $64.650 $38.910
Totals: $885,293.500 $1,049,635.300 $1,251,102.052 $1,348,976.980