AUSTIN SH 36 (0187-02-073)

Items: 83

County: AUSTIN
Length: 2.2780 MILES
Highway: SH 36
District: YOAKUM
Control Number: 0187-02-073
DBE Goal: 0.0%
Project: C 187-2-73
Guaranty: $100,000.00
Time: 173 WORKING DAYS
Engineer's Estimate: $6,997,406.60
Date: 05/02/2025 (1 year ago)
Contract Number: 5253209
Type: RECONSTRUCT EXISTING ROADWAY
Project ID: A00195577
Project Description: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$6,997,406.60
$6,157,668.01
Over/Under Est: -12% -$839,738.59
Over/Under Est: -1.54% -$108,045.27
Amt Left: 11.88% $731,693.32
Over/Under Est: -0.71% -$49,519.05
Amt Left: 12.83% $790,219.54
Delta: -0.85% -$58,526.22
Over/Under Est: 3.82% $267,140.45
Amt Left: 17.98% $1,106,879.04
Delta: -4.56% -$316,659.50
Over/Under Est: 5.19% $363,499.78
Amt Left: 19.54% $1,203,238.37
Delta: -1.33% -$96,359.33
Subcontractor Percentage Amount
STRIPE LINES, INC. 2.60% $160,099.37
CEN TEX HYDROSEED, INC. 0.36% $22,167.60
Total: 2.96% $182,266.97

Bid Items & Bid Tabulations

83 Total 0 of 83
AUSTIN  |  SH 36  |  YOAKUM  |  0187-02-073  |  05/02/2025  |  $6,997,406.60  |  C 187-2-73  |  RECON EXIST ROADWAY  |  173 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
PREPARING ROW
STA 24.000 $4,500.000 $1,300.000 $265.000 $10,000.000 $370.000 $595.000
REMOV CONC (PAV)
SY 13,336.000 $18.000 $5.750 $33.670 $15.000 $16.400 $11.400
REMOV CONC (DRIVEWAYS)
SY 1,859.000 $25.000 $21.000 $17.540 $15.000 $24.500 $9.720
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 161.000 $25.000 $31.000 $18.120 $15.000 $30.500 $25.000
REMOV CONC (CURB)
LF 1,898.000 $15.000 $7.400 $3.860 $15.000 $15.000 $10.000
REMOV CONC (CURB & GUTTER)
LF 215.000 $20.000 $17.000 $15.480 $15.000 $15.000 $10.000
RMV (8"-14") TRT/UNTRT BASE & ASPH PAV
SY 15,475.000 $15.000 $11.000 $18.350 $14.000 $17.500 $11.860
EXCAV (ROADWAY)
CY 4,387.000 $24.000 $41.000 $35.400 $50.000 $30.000 $48.000
EMBANK (FNL)(OC)(TY C)
CY 210.000 $30.000 $17.500 $25.000 $50.000 $12.000 $48.000
BLOCK SODDING
SY 2,108.000 $10.000 $8.000 $4.750 $5.000 $9.000 $4.750
DRILL SEED (PERM_RURAL_CLAY)
SY 3,048.000 $0.550 $0.400 $0.350 $0.400 $1.150 $0.350
DRILL SEED (TEMP_WARM_COOL)
SY 1,289.000 $0.500 $0.900 $0.300 $0.350 $1.150 $0.300
VEGETATIVE WATERING
TGL 43.000 $55.000 $40.000 $50.000 $40.000 $48.000 $38.000
FL BS (CMP IN PLC)(TY E GR 5)(FNAL POS)
CY 3,884.000 $130.000 $135.000 $159.340 $135.000 $162.500 $160.000
CEMENT
TON 311.000 $300.000 $243.000 $220.000 $250.000 $245.000 $210.100
CEMENT TRT (EXIST MATL)(8")
SY 25,513.000 $4.000 $3.600 $8.820 $10.000 $5.800 $6.250
ASPH (RC-250)
GAL 5,103.000 $6.000 $3.000 $10.610 $6.000 $7.800 $6.900
AGGR (TY-E, GR-5)(SAC-B)
CY 183.000 $375.000 $300.000 $577.220 $225.000 $449.000 $990.000
AGGR (TY-PE, GR-3)(SAC-B)
CY 301.000 $200.000 $355.000 $521.370 $235.000 $339.000 $643.250
AGGR (TY-PE, GR-4)(SAC-B)
CY 334.000 $300.000 $445.000 $633.400 $280.000 $317.000 $621.350
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 26,357.000 $7.000 $3.650 $6.520 $5.000 $7.400 $4.150
D-GR HMA TY-B SAC-B PG70-22
TON 9,960.000 $175.000 $130.000 $142.560 $125.000 $148.000 $120.000
D-GR HMA TY-D SAC-B PG70-22
TON 7,193.000 $130.000 $155.000 $160.500 $140.000 $152.000 $147.750
TACK COAT
GAL 2,326.000 $4.500 $4.250 $3.250 $7.500 $4.000 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 150.000 $150.000 $206.000 $145.000 $175.000 $146.000 $141.000
PLANE & TEXT ASPH CONC PAV(0" TO 6")
SY 28,811.000 $6.000 $3.250 $0.800 $8.000 $5.500 $2.150
PLANE ASPH CONC PAV(0" TO 2")
SY 15,212.000 $3.000 $2.750 $1.000 $3.300 $3.000 $1.750
RETAINING WALL (SPECIAL)
SF 28.000 $150.000 $381.000 $425.000 $275.000 $293.000 $400.000
RAIL (HANDRAIL)(TY F)
LF 24.000 $175.000 $225.000 $360.000 $325.000 $343.000 $517.000
GRATE
EA 17.000 $4,500.000 $2,200.000 $2,000.000 $2,500.000 $2,650.000 $2,500.000
ADJUSTING MANHOLES
EA 11.000 $2,500.000 $2,700.000 $750.000 $3,000.000 $1,148.000 $2,500.000
MOBILIZATION
LS 1.000 $610,000.000 $510,000.000 $485,000.000 $690,000.000 $438,000.000 $735,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,000.000 $2,075.000 $2,000.000 $6,000.000 $19,000.000 $27,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $7,500.000 $7,070.000 $16,000.000 $12,500.000 $18,000.000 $16,800.000
TMA (STATIONARY)
DAY 50.000 $400.000 $273.000 $50.000 $350.000 $604.000 $352.000
TMA (MOBILE OPERATION)
DAY 30.000 $400.000 $145.000 $175.000 $400.000 $969.000 $352.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 190.000 $4.000 $6.250 $4.250 $4.500 $8.000 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 190.000 $1.000 $1.700 $2.000 $2.500 $4.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 466.000 $8.000 $7.500 $12.000 $12.500 $9.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 466.000 $1.200 $2.250 $4.000 $4.500 $2.000 $4.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,000.000 $75.000 $67.000 $66.000 $65.000 $25.500 $64.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 480.000 $60.000 $87.000 $65.000 $65.000 $45.000 $75.250
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 11,480.000 $10.000 $8.700 $12.000 $12.000 $13.000 $12.600
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 3,400.000 $15.000 $12.000 $11.000 $12.000 $6.500 $12.150
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 4,000.000 $15.000 $14.000 $8.250 $18.000 $18.000 $31.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 480.000 $20.000 $22.000 $7.250 $18.000 $11.500 $32.250
CONC CURB (TY I)
LF 223.000 $35.000 $65.000 $15.670 $75.000 $45.000 $50.000
CONC CURB (TY II)
LF 88.000 $30.000 $83.000 $13.330 $95.000 $86.000 $50.000
CONC CURB & GUTTER (TY I)
LF 92.000 $40.000 $87.000 $35.740 $100.000 $83.000 $100.000
CONC CURB & GUTTER (TY II)
LF 178.000 $50.000 $92.000 $34.720 $100.000 $71.000 $100.000
CONCRETE C&G (VALLEY GUTTER)
LF 1,793.000 $100.000 $65.000 $50.000 $65.000 $153.000 $110.000
DRIVEWAYS (CONC)
SY 2,069.000 $115.000 $138.000 $95.920 $135.000 $253.000 $190.000
CONC SIDEWALKS (4")
SY 642.000 $80.000 $109.000 $79.520 $115.000 $167.000 $160.000
CONC SIDEWALKS (6")
SY 29.000 $130.000 $200.000 $98.500 $160.000 $179.000 $200.000
CURB RAMPS (TY 1)
SY 60.000 $200.000 $170.000 $1,036.770 $250.000 $123.000 $450.000
CURB RAMPS (TY 7)
SY 30.000 $200.000 $315.000 $196.000 $185.000 $178.000 $450.000
CURB RAMPS (TY 10)
SY 37.000 $200.000 $490.000 $170.510 $340.000 $186.000 $450.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 2.000 $300.000 $511.000 $300.000 $330.000 $510.000 $295.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $700.000 $800.000 $950.000 $1,050.000 $800.000 $715.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $900.000 $815.000 $1,175.000 $1,300.000 $812.000 $1,070.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $550.000 $815.000 $337.500 $375.000 $812.000 $565.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $500.000 $815.000 $475.000 $525.000 $812.000 $645.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 8.000 $80.000 $285.000 $50.000 $55.000 $284.000 $125.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 3.000 $65.000 $75.000 $125.000 $150.000 $74.000 $105.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 38,139.000 $1.200 $1.350 $0.400 $1.050 $1.350 $1.500
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,084.000 $1.300 $3.400 $0.750 $1.700 $3.400 $2.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 129.000 $12.000 $13.640 $20.000 $11.000 $13.600 $10.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 24,053.000 $1.200 $1.350 $0.400 $1.050 $1.350 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,971.000 $2.000 $1.150 $1.000 $1.500 $2.000 $0.450
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,180.000 $2.500 $1.150 $1.000 $1.500 $2.000 $0.450
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 17,099.000 $0.850 $1.000 $0.700 $1.100 $1.000 $1.350
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 2,210.000 $0.850 $1.000 $1.000 $1.350 $1.000 $1.350
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 18,325.000 $0.850 $1.000 $0.700 $1.100 $1.000 $1.350
PREFAB PM TY C (W)(8")(DOT)
LF 326.000 $8.000 $7.100 $15.000 $6.750 $7.000 $4.500
PREFAB PM TY C (W)(8")(SLD)
LF 1,158.000 $8.000 $7.100 $11.000 $6.350 $7.000 $4.500
PREFAB PM TY C (W)(12")(SLD)
LF 88.000 $8.000 $10.000 $15.000 $8.250 $9.750 $7.000
PREFAB PM TY C (W)(24")(SLD)
LF 612.000 $15.000 $18.500 $16.000 $15.000 $18.400 $14.000
PREFAB PM TY C (W)(ARROW)
EA 19.000 $250.000 $267.000 $250.000 $325.000 $267.000 $200.000
PREFAB PM TY C (W)(WORD)
EA 6.000 $300.000 $279.000 $400.000 $425.000 $278.000 $250.000
PREFAB PM TY C (W)(RR XING)
EA 2.000 $550.000 $569.000 $900.000 $700.000 $568.000 $475.000
PREFAB PM TY C (W)(18")(YLD TRI)
EA 5.000 $40.000 $63.000 $55.000 $50.000 $62.500 $20.000
REFL PAV MRKR TY I-C
EA 58.000 $5.000 $7.250 $5.000 $6.500 $7.000 $5.000
REFL PAV MRKR TY II-A-A
EA 622.000 $5.000 $7.250 $4.000 $6.500 $7.000 $5.000
Totals: $6,997,406.600 $6,157,668.010 $6,889,361.330 $6,947,887.550 $7,264,547.050 $7,360,906.380
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $65,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $37,440.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $500.00
Total: $103,940.00