ATASCOSA FM3175 (6481-15-001)

Items: 25

County: ATASCOSA
Length: 0.0100 MILES
Highway: FM3175
District: SAN ANTONIO
Control Number: 6481-15-001
DBE Goal: 0.0%
Project: BPM - A00214342
Guaranty: $0.00
Time: 41 WORKING DAYS
Engineer's Estimate: $103,319.51
Date: 03/18/2026 (2 months ago) Changed
Contract Number: 3261501
Type: EROSION REPAIR
Project ID: A00214342
Project Description: SCOUR REPAIR BY INSTALLING GABIONS AND CLEANING CHANNEL
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
4615 NW LOOP 410, SAN ANTONIO, TX 78229
HENRY FOJTIK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$103,319.51
$72,204.00
Over/Under Est: -30.12% -$31,115.51
$89,441.00
Over/Under Est: -13.43% -$13,878.51
Amt Left: 23.87% $17,237.00
Over/Under Est: -6.87% -$7,093.51
Amt Left: 33.27% $24,022.00
Delta: -7.59% -$6,785.00
Over/Under Est: 17.38% $17,959.49
Amt Left: 67.97% $49,075.00
Delta: -26.04% -$25,053.00
Over/Under Est: 70.01% $72,336.49
Amt Left: 143.28% $103,452.00
Delta: -44.84% -$54,377.00
Over/Under Est: 95.97% $99,153.31
Amt Left: 180.42% $130,268.82
Delta: -15.27% -$26,816.82
Over/Under Est: 226.23% $233,735.69
Amt Left: 366.81% $264,851.20
Delta: -66.47% -$134,582.38

Bid Items & Bid Tabulations

25 Total 0 of 25
ATASCOSA  |  FM3175  |  SAN ANTONIO  |  6481-15-001  |  03/18/2026  |  $103,319.51  |  BPM - A00214342  |  EROSION REPAIR  |  41 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DIAMOND R CONTRACTING, LLC
TAYLOR BRIDGE LLC
BK FIELD OPERATIONS LLC
TEXAS ROAD CONSTRUCTION, LLC
AAD CONTRACTING INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
SHALOM SERVICES CORPORATION
EXCAV (CHANNEL)
CY 60.000 $164.570 $50.000 $150.000 $60.000 $50.000 $25.000 $73.500 $134.900
COMPOST MANUF TOPSOIL (4")
SY 500.000 $1.000 $2.000 $1.000 $1.000 $4.000 $8.000 $8.530 $11.900
BROADCAST SEED (PERM_URBAN_CLAY)
SY 500.000 $1.500 $1.000 $1.000 $2.000 $4.000 $2.000 $0.870 $5.530
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
SY 500.000 $2.860 $1.000 $1.000 $4.000 $3.000 $2.000 $12.160 $7.100
FLOWABLE BACKFILL
CY 10.000 $56.880 $200.000 $200.000 $350.000 $350.000 $250.000 $298.630 $1,110.000
CONC STR REPAIR (EPOXY MORTAR)
SF 2.000 $69.320 $500.000 $500.000 $200.000 $100.000 $300.000 $358.800 $518.800
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $102.000 $50.000 $30.000 $140.000 $120.000 $275.000 $130.390 $512.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 5.000 $179.360 $1,000.000 $300.000 $60.000 $400.000 $140.000 $794.140 $728.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 62.000 $250.000 $125.000 $175.000 $170.000 $170.000 $220.000 $406.030 $518.800
GABION MATTRESSES (GALV)(12 IN)
SY 366.000 $95.490 $25.000 $105.000 $140.000 $100.000 $170.000 $100.030 $393.000
GABIONS (3' X 3')(GALV)
CY 10.000 $400.000 $500.000 $300.000 $240.000 $400.000 $180.000 $631.500 $740.000
GABION (1.5' X 3')(GALV)
CY 11.000 $386.960 $500.000 $300.000 $240.000 $300.000 $175.000 $610.460 $546.000
CLEAN EXIST CULVERTS
EA 1.000 $6,500.000 $5,000.000 $2,000.000 $3,000.000 $10,000.000 $1,500.000 $1,934.300 $9,540.000
MOBILIZATION
LS 1.000 $4,571.570 $1.000 $2,000.000 $4,000.000 $15,000.000 $25,000.000 $31,275.170 $20,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $1,437.880 $2,500.000 $1.000 $1.000 $1,000.000 $7,000.000 $1,175.460 $5,000.000
TMA (STATIONARY)
DAY 41.000 $50.000 $1.000 $1.000 $1.000 $100.000 $350.000 $362.140 $300.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 224.000 $1.710 $1.000 $10.000 $1.000 $25.000 $12.000 $33.430 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 224.000 $1.000 $1.000 $1.000 $1.000 $25.000 $2.000 $13.240 $5.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 157.000 $1.280 $1.000 $3.000 $1.000 $1.000 $4.000 $12.680 $17.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 157.000 $1.280 $1.000 $1.000 $1.000 $1.000 $1.000 $3.740 $10.000
DRIFTWOOD REMOVAL
LS 1.000 $4,500.000 $5,000.000 $500.000 $3,000.000 $1,000.000 $5,000.000 $5,143.080 $25,000.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.100 $30,000.000 $50,000.000 $50,000.000 $12,000.000 $10,000.000 $50,000.000 $40,455.320 $14,000.000
TREE REMOVAL (4" - 12" DIA)
EA 5.000 $300.000 $500.000 $250.000 $120.000 $300.000 $100.000 $1,996.930 $418.000
TREE REMOVAL (12" - 18" DIA)
EA 5.000 $100.000 $500.000 $500.000 $240.000 $500.000 $150.000 $2,436.730 $403.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 25.000 $18.840 $100.000 $75.000 $60.000 $25.000 $90.000 $248.520 $253.000
Totals: $103,319.510 $72,204.000 $89,441.000 $96,226.000 $121,279.000 $175,656.000 $202,472.822 $337,055.200