ATASCOSA FM 2790 (1741-01-013)

Items: 63

County: ATASCOSA
Length: 0.0000 MILES
Highway: FM 2790
District: SAN ANTONIO
Control Number: 1741-01-013
DBE Goal: 3.0%
Project: STP 2B24(333)TAPS
Guaranty: $38,000.00
Time: 112 WORKING DAYS
Engineer's Estimate: $1,904,135.00
Date: 06/04/2025 (1 year ago)
Contract Number: 6253034
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00206865
Contract Type: Federal
Project Description: CONSTRUCT 6' SIDEWALKS ALONG FM 2790 FROM SH 132/MAIN STREET TO IH-35 WESTBOUND FRONTAGE ROAD AND ON THE SOUTH SIDE OF IH-35 EBFR.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
FRANCES MERECKA
ENRIQUE GONZALEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$1,904,135.00
$1,236,296.25
Over/Under Est: -35.07% -$667,838.75
$1,724,746.45
Over/Under Est: -9.42% -$179,388.55
Amt Left: 39.51% $488,450.20
$1,748,693.50
Over/Under Est: -8.16% -$155,441.50
Amt Left: 41.45% $512,397.25
Delta: -1.39% -$23,947.05
Over/Under Est: -6.93% -$132,012.20
Amt Left: 43.34% $535,826.55
Delta: -1.34% -$23,429.30
Over/Under Est: 0.01% $95.30
Amt Left: 54.03% $667,934.05
Delta: -7.45% -$132,107.50
Over/Under Est: 14.33% $272,866.27
Amt Left: 76.09% $940,705.02
Delta: -14.32% -$272,770.97
Over/Under Est: 29.21% $556,203.00
Amt Left: 99.01% $1,224,041.75
Delta: -13.02% -$283,336.73

Bid Items & Bid Tabulations

63 Total 0 of 63
ATASCOSA  |  FM 2790  |  SAN ANTONIO  |  1741-01-013  |  06/04/2025  |  $1,904,135.00  |  STP 2B24(333)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  112 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACEE CONSTRUCTION LLC.
TI-ZACK CONCRETE, LLC
STX CIVIL
GARRET SHIELDS INFRASTRUCTURE
PRESIDIO CONTRACTING, LLC
E-Z BEL CONSTRUCTION, LLC
GREY SKY CONSTRUCTION LLC
PREPARING ROW
AC 1.000 $10,000.000 $2,500.000 $11,000.000 $17,500.000 $1,000.000 $10,000.000 $30,000.000 $100,000.000
REMOV CONC (RIPRAP)
SY 129.000 $35.000 $8.600 $30.930 $15.000 $40.000 $9.500 $24.000 $100.000
REMOV CONC (DRIVEWAYS)
SY 2,841.000 $26.000 $5.150 $28.090 $20.000 $30.000 $8.100 $13.000 $20.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 17.000 $30.000 $23.050 $46.940 $20.000 $40.000 $18.000 $26.000 $20.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 1,244.000 $15.000 $2.750 $12.830 $6.000 $10.000 $2.700 $3.000 $20.000
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 38.000 $15.000 $25.000 $42.000 $20.000 $20.000 $16.000 $15.000 $100.000
EXCAV (CHANNEL)
CY 256.000 $60.000 $15.000 $93.520 $25.000 $40.000 $48.000 $33.000 $100.000
EMBANK (FNL)(OC)(TY A)
CY 146.000 $60.000 $15.000 $109.320 $85.000 $100.000 $145.000 $118.000 $100.000
FURN & PLACE TOPSOIL (4")
SY 7,901.000 $5.000 $3.250 $3.030 $4.000 $4.000 $5.000 $3.000 $10.000
BLOCK SODDING
SY 7,901.000 $7.000 $6.200 $5.500 $6.500 $10.000 $6.500 $5.000 $10.000
VEGETATIVE WATERING
TGL 124.500 $50.000 $32.000 $1.100 $50.000 $50.000 $50.000 $79.000 $50.000
D-GR HMA TY-D SAC-A PG76-22 (EXEMPT)
TON 20.000 $140.000 $173.600 $385.000 $380.000 $250.000 $550.000 $267.000 $1,000.000
TACK COAT
GAL 17.000 $12.000 $30.000 $5.500 $25.000 $5.000 $25.000 $5.000 $10.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 170.000 $150.000 $110.000 $115.500 $150.000 $100.000 $115.000 $45.000 $200.000
CL A CONC (COLLAR)
EA 3.000 $1,700.000 $398.150 $825.000 $750.000 $1,000.000 $250.000 $213.000 $1,500.000
CL C CONC (MISC)
CY 16.100 $1,500.000 $520.000 $924.480 $1,000.000 $1,000.000 $855.000 $213.000 $2,500.000
RIPRAP (CONC)(6 IN)
CY 34.100 $900.000 $515.000 $924.480 $700.000 $600.000 $850.000 $510.000 $850.000
RAIL (HANDRAIL)(TY B)
LF 517.000 $200.000 $114.750 $129.800 $285.000 $125.000 $165.000 $145.000 $185.000
CMP (GAL STL 18 IN)
LF 97.000 $120.000 $50.700 $137.500 $100.000 $100.000 $85.000 $90.000 $125.000
CMP AR (GAL STL DES 4)
LF 40.000 $300.000 $103.750 $137.500 $260.000 $100.000 $145.000 $396.000 $150.000
HEADWALL (CH - PW - A - 0) (DES= 4)
EA 1.000 $15,000.000 $5,093.200 $22,000.000 $17,000.000 $5,000.000 $6,350.000 $19,000.000 $12,500.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 1.000 $1,725.000 $1,094.100 $2,750.000 $1,600.000 $2,000.000 $4,200.000 $3,330.000 $6,500.000
GRATE & FRAME
EA 48.000 $2,000.000 $3,250.000 $1,093.500 $1,300.000 $2,000.000 $3,550.000 $3,990.000 $8,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 8.000 $2,000.000 $150.000 $498.750 $350.000 $500.000 $420.000 $476.000 $850.000
ADJUSTING MANHOLES (WATER METER)
EA 1.000 $1,000.000 $206.500 $798.000 $350.000 $500.000 $1,400.000 $540.070 $850.000
CLEAN EXIST CULVERTS
EA 1.000 $5,000.000 $1,281.000 $137.500 $3,500.000 $5,000.000 $2,750.000 $1,500.000 $5,000.000
REMOV STR (SET)
EA 8.000 $600.000 $221.900 $275.000 $250.000 $500.000 $200.000 $300.000 $1,000.000
REMOV STR (PIPE)
LF 55.000 $150.000 $11.450 $60.500 $15.000 $50.000 $25.000 $10.000 $50.000
MOBILIZATION
LS 1.000 $168,000.000 $105,000.000 $190,803.600 $145,000.000 $150,000.000 $190,000.000 $180,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $5,000.000 $2,750.000 $2,750.000 $2,200.000 $5,000.000 $7,500.000 $1,000.000 $8,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 216.000 $155.000 $60.000 $1.100 $25.000 $10.000 $165.000 $45.000 $150.000
TMA (STATIONARY)
DAY 108.000 $200.000 $210.000 $1.100 $25.000 $300.000 $385.000 $500.000 $250.000
TMA (MOBILE OPERATION)
DAY 3.000 $250.000 $60.000 $1.100 $50.000 $300.000 $535.000 $500.000 $550.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 92.000 $50.000 $33.600 $1.100 $50.000 $25.000 $41.000 $35.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 92.000 $20.000 $15.750 $1.100 $20.000 $10.000 $14.000 $9.000 $20.000
SANDBAGS FOR EROSION CONTROL
EA 6.000 $13.000 $26.250 $1.100 $10.000 $10.000 $10.000 $12.000 $200.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,089.000 $9.000 $4.750 $0.110 $10.000 $6.000 $5.250 $3.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,089.000 $3.000 $0.550 $0.110 $3.000 $1.000 $1.000 $1.000 $9.000
CONC CURB (TY I)
LF 25.000 $30.000 $20.700 $62.110 $40.000 $50.000 $20.500 $115.000 $100.000
CONC CURB (TY II)
LF 1,921.000 $45.000 $12.400 $62.110 $40.000 $50.000 $19.900 $37.000 $85.000
CONC CURB (SLOTTED)
LF 33.000 $45.000 $15.700 $62.110 $100.000 $50.000 $25.000 $111.000 $150.000
CONC CURB & GUTTER (ARMOR CURB)
LF 28.000 $400.000 $528.100 $287.070 $300.000 $100.000 $580.000 $310.000 $1,000.000
DRIVEWAYS (CONC)
SY 2,921.000 $115.000 $94.850 $124.600 $110.000 $100.000 $112.000 $194.000 $100.000
CONC SIDEWALKS (4")
SY 4,194.000 $100.000 $62.450 $98.290 $90.000 $100.000 $86.250 $84.000 $55.000
CURB RAMPS (TY 1)
SY 36.000 $165.000 $138.000 $147.950 $160.000 $500.000 $111.000 $250.000 $850.000
CURB RAMPS (TY 5)
SY 14.000 $165.000 $164.000 $147.950 $160.000 $500.000 $218.000 $235.000 $850.000
CURB RAMPS (TY 7)
SY 72.000 $165.000 $104.800 $147.950 $160.000 $500.000 $127.000 $230.000 $850.000
CONC SIDEWALKS (SPECIAL)
SY 488.000 $200.000 $61.550 $147.950 $320.000 $200.000 $430.000 $627.000 $150.000
RELOCATE EXISTING MAILBOX
EA 5.000 $380.000 $445.200 $605.000 $450.000 $500.000 $300.000 $650.000 $1,100.000
GROUND BOX TY D (162922)
EA 4.000 $1,700.000 $2,100.000 $1,650.000 $1,400.000 $3,000.000 $2,200.000 $2,000.000 $1,500.000
REMOVE GROUND BOX
EA 4.000 $500.000 $1,050.000 $2,255.000 $200.000 $1,000.000 $825.000 $300.000 $150.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 19.000 $700.000 $316.950 $495.000 $800.000 $500.000 $710.000 $500.000 $1,150.000
REMOVE SM RD SN SUP&AM
EA 3.000 $150.000 $67.200 $165.000 $100.000 $500.000 $145.000 $250.000 $150.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 1.000 $550.000 $420.000 $440.000 $3,000.000 $500.000 $3,850.000 $400.000 $1,500.000
PAVEMENT SLER 24"
LF 515.000 $4.000 $7.350 $3.300 $2.500 $5.000 $2.200 $4.000 $20.000
PREFAB PM TY C (W)(24")(SLD)
LF 515.000 $18.000 $21.000 $16.280 $16.500 $15.000 $17.600 $20.000 $20.000
ELIM EXT PM & MRKS (4")
LF 10.000 $1.000 $1.600 $1.760 $52.000 $0.500 $55.000 $1.000 $10.000
ELIM EXT PM & MRKS (8")
LF 66.000 $2.000 $2.100 $3.080 $32.000 $1.800 $22.000 $4.400 $20.000
ELIM EXT PM & MRKS (24")
LF 148.000 $5.000 $8.400 $5.500 $30.000 $4.000 $27.500 $6.500 $20.000
ELIM EXT PM & MRKS (MED NOSE)
EA 1.000 $500.000 $210.000 $110.000 $1,450.000 $150.000 $1,485.000 $160.000 $1,500.000
PAV SURF PREP FOR MRK (24")
LF 515.000 $3.000 $4.200 $2.200 $4.000 $5.000 $3.850 $2.000 $20.000
PED DETECT PUSH BUTTON (STANDARD)
EA 4.000 $1,100.000 $840.000 $880.000 $2,000.000 $2,500.000 $1,980.000 $900.000 $1,850.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 4.000 $150.000 $157.500 $220.000 $100.000 $500.000 $165.000 $123.000 $500.000
Totals: $1,904,135.000 $1,236,296.250 $1,724,746.446 $1,748,693.500 $1,772,122.800 $1,904,230.300 $2,177,001.270 $2,460,338.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
Total: $4,000.00