Show Job Controls
Bid Cobra

ARMSTRONG US 287 (0042-04-043)

Items: 68

County: ARMSTRONG
Length: N/A
Highway: US 287
District: AMARILLO
Control Number: 0042-04-043
DBE Goal: N/A
Project: NH 2020(352)
Guaranty: N/A
Time: 91 WORKING DAYS
Engineer's Estimate: $8,316,512.91
Date: 12/04/2019 (6 years ago)
Contract Number: N/A
Type: 2" ACP OVERLAY, PAVEMENT REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$8,316,512.91
$8,973,976.38
Over/Under Est: 7.91% $657,463.47
$9,262,033.05
Over/Under Est: 11.37% $945,520.14
Amt Left: 3.21% $288,056.67
$10,554,061.76
Over/Under Est: 26.9% $2,237,548.85
Amt Left: 17.61% $1,580,085.38
Delta: -13.95% -$1,292,028.71
Over/Under Est: 27.82% $2,313,356.39
Amt Left: 18.45% $1,655,892.92
Delta: -0.72% -$75,807.54
$11,900,663.36
Over/Under Est: 43.1% $3,584,150.45
Amt Left: 32.61% $2,926,686.98
Delta: -11.95% -$1,270,794.06

Bid Items & Bid Tabulations

68 Total 0 of 68
ARMSTRONG  |  US 287  |  AMARILLO  |  0042-04-043  |  12/04/2019  |  $8,316,512.91  |  NH 2020(352)  |  2" ACP OVERLAY, PAVMT REPAIR  |  91 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KIEWIT INFRASTRUCTURE SOUTH CO.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
RK HALL, LLC
PREPARING ROW
AC 25.700 $275.000 $170.670 $400.000 $700.000 $31,100.000 $1,000.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 6.000 $1,000.000 $1,137.810 $925.000 $900.000 $750.000 $2,000.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 2.000 $1,800.000 $2,450.850 $1,900.000 $450.000 $900.000 $2,850.000
PREPARING ROW (TREE) (36" TO 48" DIA)
EA 1.000 $2,200.000 $4,036.960 $5,550.000 $500.000 $1,000.000 $3,000.000
REMOVING STAB BASE & ASPH PAV (12")
SY 500.000 $5.000 $11.500 $20.400 $32.000 $4.000 $28.750
EXCAVATION (CHANNEL)
CY 106.000 $50.000 $12.800 $32.850 $35.000 $15.000 $50.000
SUBGRADE WIDENING (DENS CONT)
STA 8.250 $1,500.000 $490.710 $1,065.000 $2,200.000 $1,200.000 $3,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 323.000 $25.000 $28.930 $55.400 $45.000 $12.000 $22.000
BACKFILL (TY A)
STA 1,120.000 $175.000 $201.920 $230.000 $175.000 $200.000 $240.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 25.350 $350.000 $392.540 $385.000 $345.000 $450.000 $400.000
FL BS (CMP IN PLC)(TY A OR B GR 4)(9")
SY 1,445.000 $18.000 $27.660 $24.350 $35.000 $18.000 $40.000
PRIME COAT (MC-30)
GAL 361.000 $10.000 $4.510 $5.900 $8.000 $3.500 $10.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 12,269.000 $3.500 $3.970 $4.100 $3.500 $3.500 $5.000
ASPH (MULTI OPTION)
GAL 549.000 $10.000 $6.340 $4.300 $8.000 $6.000 $10.000
AGGR(TY-B GR-4 SAC-B)
CY 13.000 $140.000 $711.170 $295.000 $700.000 $95.000 $1,300.000
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
TON 56,356.000 $95.000 $100.000 $100.500 $128.000 $118.000 $143.000
TACK COAT
GAL 65,733.000 $4.000 $3.860 $4.500 $0.010 $3.000 $7.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 31,106.000 $23.000 $25.610 $25.450 $24.000 $19.000 $30.000
PLANE ASPH CONC PAV(0" TO 2")
SY 3,380.000 $2.250 $8.140 $6.400 $22.000 $1.650 $8.050
PLANE ASPH CONC PAV (10")
SY 415.000 $4.500 $10.620 $29.550 $34.000 $14.500 $32.200
RC PIPE (CL III)(24 IN)
LF 39.000 $200.000 $123.530 $202.400 $185.000 $75.000 $220.000
INLET (COMPL)(TY A)
EA 2.000 $7,500.000 $6,599.310 $8,400.000 $15,000.000 $2,750.000 $9,500.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 1.000 $2,500.000 $3,527.220 $4,200.000 $3,000.000 $1,750.000 $4,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $3,641.000 $4,200.000 $3,100.000 $1,500.000 $4,000.000
REMOV STR (SET)
EA 5.000 $500.000 $1,137.810 $1,600.000 $1,000.000 $750.000 $1,500.000
MOBILIZATION
LS 1.000 $630,000.000 $897,222.560 $916,000.000 $1,000,000.000 $1,050,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $1,200.000 $20,000.000 $22,500.000 $25,000.000 $5,500.000 $20,300.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 200.000 $6.000 $5.920 $9.000 $10.000 $4.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $2.000 $1.140 $6.650 $2.000 $0.250 $2.000
RUMBLE STRIPS (SHOULDER)
LF 197,377.000 $0.130 $0.160 $0.150 $0.200 $0.150 $0.120
MTL W-BEAM GD FEN (STEEL POST)
LF 1,275.000 $28.000 $31.130 $28.250 $23.000 $25.000 $26.450
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,300.000 $1,382.440 $1,715.000 $1,295.000 $1,150.000 $1,489.250
REMOVE METAL BEAM GUARD FENCE
LF 1,125.000 $3.000 $8.530 $3.350 $4.000 $2.000 $4.600
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $275.000 $470.260 $335.000 $350.000 $125.000 $402.500
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,000.000 $2,483.840 $3,320.000 $2,725.000 $2,700.000 $3,133.750
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $315.000 $74.640 $330.000 $350.000 $200.000 $402.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 20.000 $900.000 $659.930 $920.000 $370.000 $450.000 $871.700
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 13.000 $1,000.000 $807.850 $1,085.000 $530.000 $585.000 $1,118.950
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,100.000 $773.710 $1,050.000 $1,000.000 $725.000 $1,070.650
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $1,000.000 $910.250 $1,080.000 $1,300.000 $520.000 $1,112.050
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 49.000 $1,300.000 $1,160.570 $1,290.000 $765.000 $725.000 $1,421.400
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,300.000 $1,160.570 $1,295.000 $835.000 $825.000 $1,368.500
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,200.000 $1,365.370 $1,350.000 $1,325.000 $785.000 $1,431.750
REMOVE SM RD SN SUP&AM
EA 110.000 $110.000 $113.780 $120.000 $65.000 $95.000 $172.500
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 100.000 $100.000 $113.780 $155.000 $120.000 $80.000 $143.750
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 44.000 $90.000 $113.780 $155.000 $115.000 $60.000 $143.750
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 122.000 $140.000 $113.780 $155.000 $120.000 $75.000 $143.750
REMOVE DELIN & OBJECT MARKER ASSMS
EA 362.000 $12.000 $17.070 $17.000 $15.000 $20.000 $23.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 21.000 $30.000 $45.510 $11.000 $40.000 $25.000 $44.850
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 38,737.000 $0.800 $0.170 $0.170 $0.150 $0.750 $0.170
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 114,819.000 $0.700 $0.170 $0.170 $0.150 $0.750 $0.170
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 5,492.000 $1.300 $0.300 $0.290 $0.260 $1.000 $0.300
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 114,819.000 $0.800 $0.170 $0.170 $0.150 $0.750 $0.170
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 14,521.000 $1.000 $2.280 $1.200 $1.000 $1.000 $2.900
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 5,741.000 $1.000 $2.280 $1.250 $1.000 $1.300 $2.900
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 5,492.000 $0.800 $0.730 $0.710 $0.640 $1.000 $0.740
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 267.000 $9.000 $8.530 $8.300 $7.500 $9.000 $8.630
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 18.000 $160.000 $199.120 $194.000 $175.000 $125.000 $201.250
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 18.000 $230.000 $256.010 $250.000 $225.000 $200.000 $258.750
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 473.000 $17.000 $22.760 $22.150 $20.000 $50.000 $23.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 28,210.000 $0.400 $0.360 $0.350 $0.320 $0.350 $0.370
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 110,404.000 $0.400 $0.360 $0.350 $0.320 $0.300 $0.370
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 96,550.000 $0.400 $0.360 $0.350 $0.320 $0.300 $0.370
REFL PAV MRKR TY II-C-R
EA 1,410.000 $3.300 $3.700 $3.600 $3.250 $4.000 $3.740
UNDERSEAL COURSE
GAL 80,875.000 $3.400 $2.750 $4.050 $5.550 $4.500 $5.360
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,500.000 $23,471.430 $24,700.000 $12,000.000 $7,500.000 $15,000.000
TMA (STATIONARY)
DAY 110.000 $350.000 $354.840 $675.000 $600.000 $175.000 $460.000
TMA (MOBILE OPERATION)
HR 768.000 $45.000 $83.390 $67.500 $5.000 $30.000 $100.000
Totals: $8,316,512.910 $8,973,976.406 $9,262,033.050 $10,554,061.760 $10,629,869.300 $11,900,663.360