ARCHER FM 1954 (1837-01-014)

Items: 114

County: ARCHER
Length: N/A
Highway: FM 1954
District: WICHITA FALLS
Control Number: 1837-01-014
DBE Goal: N/A
Project: F 2021(651)
Guaranty: N/A
Time: 187 WORKING DAYS
Engineer's Estimate: $5,023,076.55
Date: 06/03/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$5,023,076.55
$5,282,463.13
Over/Under Est: 5.16% $259,386.58
$5,595,379.29
Over/Under Est: 11.39% $572,302.74
Amt Left: 5.92% $312,916.16
Over/Under Est: 12.49% $627,526.90
Amt Left: 6.97% $368,140.32
Delta: -0.99% -$55,224.16
Over/Under Est: 30.8% $1,546,912.78
Amt Left: 24.37% $1,287,526.20
Delta: -16.27% -$919,385.88

Bid Items & Bid Tabulations

114 Total 0 of 114
ARCHER  |  FM 1954  |  WICHITA FALLS  |  1837-01-014  |  06/03/2021  |  $5,023,076.55  |  F 2021(651)  |  BRIDGE REPL  |  187 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
JAGOE-PUBLIC COMPANY
EUROVIA ATLANTIC COAST LLC
STATELINE CONSTRUCTION, LLC
PREPARING ROW
STA 14.000 $500.000 $5,000.000 $2,500.000 $6,000.000 $1,000.000
REMOVING CONC (RIPRAP)
SY 56.000 $8.000 $18.000 $12.000 $53.000 $65.000
REMOVING CONC (DRIVEWAYS)
SY 2,052.000 $15.000 $18.000 $14.000 $18.000 $40.000
REMOVING STAB BASE AND ASPH PAV(6"-9")
SY 6,696.000 $6.000 $4.000 $2.500 $5.000 $6.250
EXCAVATION (ROADWAY)
CY 12,586.000 $12.000 $11.000 $5.000 $19.500 $12.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 7,817.000 $15.000 $11.000 $20.000 $22.000 $16.250
BROADCAST SEED (TEMP) (WARM)
SY 63,366.000 $0.150 $0.110 $0.070 $0.180 $0.250
BROADCAST SEED (TEMP) (COOL)
SY 63,366.000 $0.150 $0.120 $0.070 $0.180 $0.250
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 126,725.000 $0.150 $0.110 $0.200 $0.150 $0.250
VEGETATIVE WATERING
MG 1,063.000 $10.000 $10.000 $45.000 $30.000 $12.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 2,020.000 $2.200 $1.400 $1.500 $0.940 $2.250
CEMENT
TON 363.000 $175.000 $184.000 $180.000 $198.000 $300.000
CEMENT TREAT (SUBGRADE) (8")
SY 33,635.000 $2.750 $4.200 $4.000 $3.200 $7.250
PRIME COAT (MC-30)
GAL 8,409.000 $4.000 $4.500 $2.500 $4.750 $7.250
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 960.000 $45.000 $65.000 $55.000 $43.000 $52.500
CEM STABIL BKFL
CY 153.000 $105.000 $260.000 $275.000 $178.000 $225.000
CUT & RESTORING PAV
SY 92.000 $320.000 $60.000 $55.000 $150.000 $100.000
TRENCH EXCAVATION PROTECTION
LF 26.000 $5.000 $53.000 $2.000 $10.000 $200.000
TEMPORARY SPL SHORING
SF 160.000 $20.000 $53.000 $100.000 $60.000 $65.000
DRILL SHAFT (24 IN)
LF 594.000 $200.000 $210.000 $235.000 $215.000 $225.000
DRILL SHAFT (30 IN)
LF 8.000 $200.000 $500.000 $440.000 $500.000 $1,600.000
CL C CONC (ABUT)
CY 43.200 $1,000.000 $1,260.000 $2,000.000 $960.000 $875.000
CL C CONC (CAP)
CY 24.000 $950.000 $1,600.000 $1,900.000 $980.000 $925.000
CL C CONC (COLUMN)
CY 26.300 $950.000 $1,700.000 $1,600.000 $980.000 $1,400.000
REINF CONC SLAB (SLAB BEAM)
SF 4,980.000 $18.000 $21.000 $23.000 $19.000 $17.000
APPROACH SLAB
CY 103.200 $550.000 $580.000 $820.000 $610.000 $800.000
PRESTR CONC SLAB BEAM (4SB15)
LF 628.000 $180.000 $200.000 $250.000 $220.000 $305.000
PRESTR CONC SLAB BEAM (5SB15)
LF 592.000 $180.000 $200.000 $250.000 $220.000 $125.000
CONC STR REPAIR (STANDARD)
SF 27.000 $110.000 $100.000 $30.000 $225.000 $500.000
RIPRAP (CONC)(4 IN)
CY 2.000 $490.000 $530.000 $750.000 $1,065.000 $2,000.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 15.000 $130.000 $110.000 $200.000 $275.000 $250.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 29.000 $135.000 $110.000 $200.000 $276.000 $325.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 326.000 $125.000 $120.000 $130.000 $196.000 $152.500
RIPRAP (MOW STRIP)(4 IN)
CY 84.000 $500.000 $550.000 $550.000 $595.000 $300.000
RAIL (TY T631)
LF 358.000 $85.000 $78.000 $62.000 $87.800 $125.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 128.000 $110.000 $170.000 $175.000 $115.000 $109.000
CMP (GAL STL 18 IN)
LF 1,142.000 $43.000 $60.000 $50.000 $45.000 $48.000
CMP (GAL STL 24 IN)
LF 680.000 $50.000 $69.000 $60.000 $55.000 $62.000
CMP (GAL STL 30 IN)
LF 48.000 $75.000 $90.000 $75.000 $69.000 $74.670
CMP (GAL STL 36 IN)
LF 48.000 $100.000 $110.000 $88.000 $80.000 $99.990
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 186.000 $560.000 $580.000 $550.000 $500.000 $300.000
RC PIPE (CL III)(21 IN)
LF 48.000 $155.000 $90.000 $90.000 $82.000 $125.000
RC PIPE (CL III)(24 IN)
LF 111.000 $80.000 $110.000 $110.000 $101.000 $79.000
RC PIPE (CL III)(30 IN)
LF 199.000 $120.000 $140.000 $140.000 $130.000 $88.000
WINGWALL (PW - 2) (HW=4 FT)
EA 4.000 $8,000.000 $13,000.000 $10,000.000 $7,000.000 $14,000.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 107.000 $800.000 $1,100.000 $1,000.000 $825.000 $1,200.000
SET (TY II) (21 IN) (CMP) (6: 1) (P)
EA 2.000 $900.000 $1,300.000 $1,200.000 $1,100.000 $2,000.000
SET (TY II) (21 IN) (RCP) (6: 1) (P)
EA 2.000 $1,100.000 $1,300.000 $1,200.000 $1,100.000 $2,000.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 56.000 $1,200.000 $1,300.000 $1,250.000 $1,250.000 $1,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,450.000 $1,200.000 $1,150.000 $1,060.000 $2,000.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 4.000 $2,500.000 $3,000.000 $2,100.000 $1,900.000 $2,400.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 5.000 $1,530.000 $1,600.000 $1,400.000 $1,300.000 $3,000.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 5.000 $1,870.000 $2,300.000 $1,600.000 $1,500.000 $3,100.000
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 4.000 $4,500.000 $5,800.000 $3,500.000 $3,200.000 $4,800.000
CLEAN EXIST CULVERTS
EA 2.000 $2,200.000 $3,200.000 $1,100.000 $1,000.000 $1,900.000
REMOV STR (SET)
EA 34.000 $460.000 $260.000 $220.000 $150.000 $625.000
REMOV STR (WINGWALL)
EA 1.000 $1,040.000 $780.000 $1,000.000 $900.000 $5,000.000
REMOV STR (PIPE)
LF 264.000 $15.000 $11.000 $11.000 $10.000 $46.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $19,000.000 $31,600.000 $28,000.000 $22,500.000 $24,500.000
REMOV STR (PIPE)
EA 73.000 $100.000 $260.000 $220.000 $200.000 $225.000
MOBILIZATION
LS 1.000 $372,012.000 $394,000.000 $545,000.000 $550,000.000 $225,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $6,000.000 $8,200.000 $31,000.000 $30,000.000 $3,250.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 226.000 $35.000 $26.000 $27.000 $26.390 $38.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 188.000 $60.000 $32.000 $32.000 $54.420 $49.000
ROCK FILTER DAMS (REMOVE)
LF 414.000 $10.000 $11.000 $10.000 $8.910 $12.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 500.000 $30.000 $10.000 $15.000 $26.320 $18.000
CONSTRUCTION EXITS (REMOVE)
SY 500.000 $10.000 $2.000 $5.000 $9.750 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,755.000 $2.500 $2.000 $2.000 $2.200 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,755.000 $0.700 $0.700 $0.700 $0.480 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,890.000 $4.000 $3.000 $3.000 $4.080 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,890.000 $1.000 $0.650 $0.650 $0.890 $8.000
INTERSECTIONS (ACP)
SY 1,868.000 $55.000 $23.000 $15.000 $21.000 $47.500
DRIVEWAYS (CONC)
SY 1,980.000 $100.000 $95.000 $75.000 $77.250 $78.000
DRIVEWAYS (ACP)
SY 5,515.000 $50.000 $20.000 $17.000 $21.000 $44.250
TURNOUTS (ACP)
SY 1,314.000 $55.000 $30.000 $50.000 $55.000 $51.150
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 60,190.000 $0.100 $0.170 $0.250 $0.190 $0.700
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 29,940.000 $0.090 $0.170 $0.400 $0.190 $0.800
MTL W-BEAM GD FEN (TIM POST)
LF 900.000 $20.000 $23.000 $24.000 $24.800 $32.500
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $3.000 $5.500 $1.750 $3.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $200.000 $370.000 $130.000 $300.000 $400.000
RM MTL BM GD FEN TRANS (T101)
EA 8.000 $100.000 $320.000 $110.000 $300.000 $225.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,450.000 $2,700.000 $2,500.000 $3,180.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $250.000 $320.000 $130.000 $300.000 $315.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 77.000 $250.000 $220.000 $150.000 $375.000 $300.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 1.000 $300.000 $250.000 $165.000 $235.000 $400.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $500.000 $310.000 $350.000 $295.000 $400.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 1.000 $3,500.000 $7,900.000 $3,300.000 $7,500.000 $8,000.000
ELEC CONDR (NO.8) BARE
LF 10.000 $2.000 $2.800 $1.500 $2.600 $50.000
ELEC CONDR (NO.8) INSULATED
LF 60.000 $2.000 $3.800 $1.550 $3.600 $15.000
ELC SRV TY A 240/480 060(NS)SS(E)EX(O)
EA 1.000 $6,500.000 $9,000.000 $2,200.000 $8,500.000 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 21.000 $525.000 $470.000 $450.000 $450.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 14.000 $650.000 $540.000 $650.000 $510.000 $500.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 3.000 $975.000 $890.000 $1,000.000 $850.000 $500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 60.000 $400.000 $370.000 $450.000 $350.000 $425.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 8.000 $500.000 $430.000 $450.000 $400.000 $500.000
REMOVE SM RD SN SUP&AM
EA 56.000 $85.000 $85.000 $80.000 $80.000 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $24.000 $22.000 $20.000 $20.000 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 32.000 $28.000 $31.000 $20.000 $30.000 $40.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 90.000 $50.000 $48.000 $35.000 $45.000 $45.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,511.000 $1.500 $1.000 $1.250 $1.300 $5.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 210.000 $1.000 $1.100 $1.100 $0.800 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 114.000 $7.000 $16.000 $16.500 $10.000 $8.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 60,458.000 $0.400 $0.400 $0.400 $0.350 $0.650
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,580.000 $0.400 $0.400 $0.400 $0.400 $0.650
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 24,284.000 $0.400 $0.400 $0.400 $0.350 $0.650
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 6.000 $38.000 $53.000 $55.000 $70.000 $75.000
REFL PAV MRKR TY II-A-A
EA 745.000 $3.000 $3.500 $3.500 $4.500 $5.250
ELIM EXT PAV MRK & MRKS (24")
LF 25.000 $5.000 $16.000 $16.500 $32.000 $12.000
PAV SURF PREP FOR MRK (4")
LF 940.000 $0.200 $1.100 $1.100 $0.500 $2.200
D-GR HMA TY-B PG64-22
TON 10,007.000 $85.000 $80.900 $80.000 $72.000 $125.000
D-GR HMA TY-D PG70-28
TON 10,543.000 $75.000 $95.000 $90.000 $90.000 $137.000
BONDING COURSE
GAL 5,751.000 $3.350 $3.000 $3.000 $3.750 $7.000
TMA (STATIONARY)
DAY 270.000 $230.000 $210.000 $125.000 $230.000 $225.000
TMA (MOBILE OPERATION)
DAY 12.000 $100.000 $200.000 $100.000 $525.000 $500.000
Totals: $5,023,076.550 $5,282,463.130 $5,595,379.290 $5,650,603.450 $6,569,989.330