PREPARING ROW
|
STA
|
49.000
|
$2,286.440
|
$700.000
|
$500.000
|
$491.350
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
7,965.000
|
$8.000
|
$8.000
|
$10.000
|
$8.420
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,618.000
|
$13.000
|
$28.000
|
$17.000
|
$14.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,554.000
|
$8.100
|
$31.000
|
$17.000
|
$14.350
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
62,720.000
|
$0.120
|
$0.180
|
$0.050
|
$0.180
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
62,720.000
|
$0.110
|
$0.180
|
$0.060
|
$0.180
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
125,442.000
|
$0.150
|
$0.150
|
$0.070
|
$0.170
|
|
|
VEGETATIVE WATERING
|
MG
|
1,053.710
|
$25.000
|
$33.000
|
$15.000
|
$31.580
|
|
|
CEMENT
|
TON
|
467.000
|
$170.000
|
$185.000
|
$165.000
|
$192.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
42,250.000
|
$4.500
|
$2.850
|
$2.800
|
$4.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,568.000
|
$10.000
|
$4.250
|
$4.500
|
$6.300
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
834.000
|
$56.000
|
$38.000
|
$70.000
|
$35.950
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
135.000
|
$78.000
|
$50.000
|
$60.000
|
$81.490
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
152.000
|
$2.500
|
$10.000
|
$27.000
|
$26.320
|
|
|
TEMPORARY SPL SHORING
|
SF
|
175.000
|
$43.000
|
$60.000
|
$55.000
|
$52.640
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
56.000
|
$400.000
|
$500.000
|
$530.000
|
$293.810
|
|
|
CL C CONC (COLLAR)
|
EA
|
8.000
|
$1,346.000
|
$500.000
|
$1,600.000
|
$1,579.060
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
16.000
|
$400.000
|
$690.000
|
$600.000
|
$578.990
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
71.000
|
$417.000
|
$675.000
|
$640.000
|
$508.450
|
|
|
RIPRAP (STONE PROTECTION)(27 IN)
|
CY
|
250.000
|
$130.000
|
$220.000
|
$200.000
|
$156.190
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
637.000
|
$55.250
|
$40.000
|
$85.000
|
$84.220
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
101.000
|
$200.000
|
$290.000
|
$350.000
|
$342.130
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
94.000
|
$225.000
|
$375.000
|
$550.000
|
$547.410
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
15.000
|
$570.000
|
$600.000
|
$450.000
|
$447.400
|
|
|
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
|
LF
|
81.000
|
$630.000
|
$1,000.000
|
$1,000.000
|
$957.970
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
683.000
|
$66.000
|
$49.000
|
$85.000
|
$84.220
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
521.000
|
$114.000
|
$60.000
|
$125.000
|
$126.330
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
310.000
|
$95.000
|
$80.000
|
$165.000
|
$163.170
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$8,100.000
|
$10,000.000
|
$5,500.000
|
$5,474.090
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$6,686.000
|
$6,000.000
|
$9,200.000
|
$9,158.570
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$20,195.000
|
$28,000.000
|
$38,000.000
|
$37,897.530
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(3:1) (P)
|
EA
|
2.000
|
$8,200.000
|
$6,000.000
|
$6,900.000
|
$6,842.610
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(3:1) (C)
|
EA
|
3.000
|
$8,200.000
|
$8,200.000
|
$5,800.000
|
$5,789.900
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
42.000
|
$850.000
|
$875.000
|
$1,200.000
|
$1,157.980
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
42.000
|
$964.000
|
$825.000
|
$1,200.000
|
$1,157.980
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,125.000
|
$1,165.000
|
$1,300.000
|
$1,315.890
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
26.000
|
$1,134.000
|
$1,100.000
|
$1,300.000
|
$1,263.250
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,168.000
|
$1,100.000
|
$1,300.000
|
$1,315.890
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
22.000
|
$1,508.000
|
$1,275.000
|
$2,200.000
|
$2,105.420
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$2,500.000
|
$2,200.000
|
$2,600.000
|
$2,631.770
|
|
|
REMOV STR (SET)
|
EA
|
18.000
|
$400.000
|
$200.000
|
$550.000
|
$526.350
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$1,000.000
|
$800.000
|
$1,100.000
|
$1,052.710
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,045.000
|
$750.000
|
$1,100.000
|
$1,052.710
|
|
|
REMOV STR (PIPE)
|
LF
|
1,676.000
|
$15.000
|
$10.000
|
$13.000
|
$12.630
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
17.000
|
$37.000
|
$100.000
|
$70.000
|
$68.430
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$458,186.090
|
$450,000.000
|
$450,000.000
|
$490,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$10,000.000
|
$35,500.000
|
$10,000.000
|
$4,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,091.000
|
$25.000
|
$22.890
|
$22.000
|
$31.580
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,091.000
|
$10.000
|
$6.910
|
$10.500
|
$9.470
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$20.000
|
$24.700
|
$21.000
|
$31.580
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$8.000
|
$9.750
|
$5.250
|
$10.530
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,865.000
|
$2.500
|
$2.000
|
$2.050
|
$3.160
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,865.000
|
$1.000
|
$0.480
|
$0.650
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,750.000
|
$4.000
|
$3.940
|
$2.900
|
$5.260
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,750.000
|
$0.860
|
$0.890
|
$0.550
|
$1.050
|
|
|
CONSTRUCTING DETOURS
|
SY
|
995.000
|
$75.000
|
$51.000
|
$60.000
|
$51.390
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
120.000
|
$2,600.000
|
$121.000
|
$93.000
|
$129.570
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,760.000
|
$30.000
|
$32.000
|
$40.000
|
$41.030
|
|
|
TURNOUTS (ACP)
|
SY
|
316.000
|
$38.000
|
$50.000
|
$50.000
|
$43.970
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,573.000
|
$20.500
|
$20.000
|
$14.000
|
$32.210
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
234.000
|
$100.000
|
$129.000
|
$110.000
|
$87.370
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
49,073.000
|
$0.250
|
$0.250
|
$0.220
|
$0.230
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
22,343.000
|
$0.250
|
$0.310
|
$0.300
|
$0.470
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
167.000
|
$123.000
|
$125.000
|
$65.000
|
$91.470
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
800.000
|
$21.000
|
$20.250
|
$18.000
|
$17.370
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$1,850.000
|
$1,820.000
|
$1,650.000
|
$1,658.020
|
|
|
SHORT RADIUS
|
LF
|
188.000
|
$72.000
|
$38.000
|
$37.000
|
$36.840
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$1,050.000
|
$910.000
|
$1,100.000
|
$1,063.240
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$58.000
|
$2,780.000
|
$2,500.000
|
$2,473.870
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
23.000
|
$200.000
|
$280.000
|
$300.000
|
$378.980
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
2.000
|
$350.000
|
$300.000
|
$320.000
|
$447.400
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$740.000
|
$580.000
|
$610.000
|
$815.850
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$500.000
|
$550.000
|
$580.000
|
$851.660
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
87.000
|
$20.000
|
$35.000
|
$37.000
|
$15.540
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
505.000
|
$25.000
|
$45.000
|
$47.000
|
$24.290
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
1,918.000
|
$1.500
|
$1.250
|
$1.300
|
$1.510
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
592.000
|
$2.000
|
$1.750
|
$1.850
|
$1.290
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
102.000
|
$2.000
|
$3.750
|
$4.000
|
$1.960
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
4.000
|
$1,700.000
|
$1,650.000
|
$1,700.000
|
$1,263.610
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$7,000.000
|
$6,500.000
|
$6,900.000
|
$4,737.200
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$670.000
|
$520.000
|
$550.000
|
$842.170
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
14.000
|
$600.000
|
$610.000
|
$640.000
|
$947.440
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
8.000
|
$650.000
|
$680.000
|
$715.000
|
$947.440
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
4.000
|
$1,000.000
|
$860.000
|
$910.000
|
$1,210.620
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$775.000
|
$875.000
|
$920.000
|
$1,052.710
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
4.000
|
$800.000
|
$870.000
|
$920.000
|
$1,105.350
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
29.000
|
$350.000
|
$380.000
|
$400.000
|
$631.630
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
58.000
|
$100.000
|
$90.000
|
$95.000
|
$105.270
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
9.000
|
$28.000
|
$20.000
|
$37.000
|
$35.790
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
33.000
|
$82.000
|
$90.000
|
$95.000
|
$152.640
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
LF
|
15,697.000
|
$0.500
|
$0.880
|
$0.900
|
$0.930
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
154.000
|
$2.000
|
$2.000
|
$2.100
|
$2.110
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
13,136.000
|
$1.250
|
$0.700
|
$0.750
|
$0.740
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
203.000
|
$10.000
|
$17.250
|
$18.000
|
$18.160
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
14,881.000
|
$0.850
|
$0.700
|
$0.750
|
$0.740
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,015.000
|
$1.440
|
$1.250
|
$0.450
|
$1.010
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
811.000
|
$0.850
|
$0.900
|
$1.000
|
$0.950
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
190.000
|
$6.850
|
$22.500
|
$24.000
|
$23.690
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
49,073.000
|
$0.400
|
$0.450
|
$0.470
|
$0.470
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
7,932.000
|
$0.400
|
$0.450
|
$0.470
|
$0.470
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
11,439.000
|
$0.330
|
$0.450
|
$0.470
|
$0.470
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$228.500
|
$300.000
|
$315.000
|
$315.810
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$250.000
|
$400.000
|
$420.000
|
$421.080
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
13.000
|
$35.000
|
$60.000
|
$63.000
|
$63.160
|
|
REFL PAV MRKR TY I-C
|
EA
|
42.000
|
$5.000
|
$3.500
|
$3.700
|
$3.680
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
252.000
|
$4.000
|
$3.500
|
$3.700
|
$3.680
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
24,917.000
|
$0.750
|
$1.750
|
$0.400
|
$4.210
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
171.000
|
$3.000
|
$10.000
|
$1.000
|
$10.530
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
1.000
|
$7,500.000
|
$4,500.000
|
$4,800.000
|
$7,307.280
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
14.000
|
$500.000
|
$300.000
|
$320.000
|
$251.750
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
10.000
|
$500.000
|
$300.000
|
$320.000
|
$245.240
|
|
|
BACK PLATE (12")(2 SEC)
|
EA
|
12.000
|
$80.000
|
$75.000
|
$79.000
|
$86.740
|
|
|
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
|
LF
|
648.000
|
$3.500
|
$2.000
|
$2.200
|
$1.910
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
913.000
|
$4.000
|
$4.000
|
$4.300
|
$4.390
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
1.000
|
$11,000.000
|
$14,000.000
|
$15,000.000
|
$10,455.030
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$13,000.000
|
$14,250.000
|
$15,000.000
|
$9,506.560
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
2.000
|
$14,000.000
|
$16,000.000
|
$17,000.000
|
$10,453.680
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
12,631.000
|
$80.000
|
$70.000
|
$82.000
|
$74.250
|
|
|
D-GR HMA TY-D PG70-28
|
TON
|
10,046.000
|
$85.000
|
$75.000
|
$90.000
|
$81.000
|
|
|
D-GR HMA TY-D PG70-28 (LEVEL-UP)
|
TON
|
1,266.000
|
$90.000
|
$84.000
|
$103.000
|
$85.000
|
|
|
BONDING COURSE
|
GAL
|
10,189.000
|
$3.500
|
$3.500
|
$2.500
|
$3.960
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$19,800.000
|
$15,000.000
|
$10,000.000
|
$1,930.820
|
|
|
TMA (STATIONARY)
|
DAY
|
209.000
|
$272.000
|
$275.000
|
$200.000
|
$220.870
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
59.000
|
$314.000
|
$650.000
|
$50.000
|
$1,297.330
|
|
Totals: |
$5,174,156.870
|
$4,925,489.020
|
$4,971,994.330
|
$4,986,967.742
|