Show Job Controls
Bid Cobra

ARANSAS BS0035L (6390-79-001)

Items: 20

County: ARANSAS
Length: N/A
Highway: BS0035L
District: CORPUS CHRISTI
Control Number: 6390-79-001
DBE Goal: N/A
Project: RMC - 639079001
Guaranty: N/A
Time: 150 CALENDAR DAYS
Engineer's Estimate: $274,465.00
Date: 10/19/2021 (4 years ago)
Contract Number: N/A
Type: ILLUMINATION MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$274,465.00
$293,775.00
Over/Under Est: 7.04% $19,310.00
Over/Under Est: 22.21% $60,950.00
Amt Left: 14.17% $41,640.00

Bid Items & Bid Tabulations

20 Total 0 of 20
ARANSAS  |  BS0035L  |  CORPUS CHRISTI  |  6390-79-001  |  10/19/2021  |  $274,465.00  |  RMC - 639079001  |  ILLUM MAINT  |  150 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VACA UNDERGROUND UTILITIES INC
THIRD COAST SERVICES LLC
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 270.000 $200.000 $175.000 $215.000
RIPRAP (CONC)(CL B)
CY 11.000 $675.000 $600.000 $350.000
MOBILIZATION
LS 1.000 $15,540.000 $25,000.000 $30,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $2,000.000 $500.000 $1,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $6.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.500 $1.000 $1.000
CONDT (PVC) (SCH 40) (2")
LF 100.000 $12.000 $11.750 $11.250
CONDT (PVC) (SCH 40) (2") (BORE)
LF 100.000 $18.000 $24.000 $16.000
ELEC CONDR (NO.12) INSULATED
LF 3,000.000 $1.000 $0.850 $1.400
ELEC CONDR (NO.8) INSULATED
LF 6,600.000 $1.250 $1.750 $1.900
GROUND BOX TY A (122311)W/APRON
EA 10.000 $900.000 $750.000 $815.000
REMOVE ELECTRICAL SERVICES
EA 30.000 $440.000 $300.000 $390.000
ELC SRV TY A 240/480 100(SS)SS(E)GC(O)
EA 20.000 $4,950.000 $6,000.000 $6,100.000
REPLACE ROADWAY ILLUM ASSEMBLY (LED)
EA 30.000 $500.000 $1,000.000 $900.000
REMOVE FOUNDATION
EA 30.000 $325.000 $500.000 $500.000
REPLACE BREAKAWAY FUSE HOLDER
EA 50.000 $165.000 $110.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $3,900.000 $50.000 $100.000
CONDUIT (PREPARE)
LF 100.000 $2.000 $0.750 $0.500
GROUND BOX (PREPARE)
EA 5.000 $110.000 $725.000 $80.000
TMA (STATIONARY)
DAY 150.000 $65.000 $25.000 $195.000
Totals: $274,465.000 $293,775.000 $335,415.000