ARANSAS CS (0916-38-014)

Items: 62

County: ARANSAS
Length: N/A
Highway: CS
District: CORPUS CHRISTI
Control Number: 0916-38-014
DBE Goal: N/A
Project: BR 1902(249)
Guaranty: N/A
Time: 309 WORKING DAYS
Engineer's Estimate: $3,982,909.08
Date: 03/04/2021 (5 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$3,982,909.08
$4,582,972.16
Over/Under Est: 15.07% $600,063.08
$5,776,786.49
Over/Under Est: 45.04% $1,793,877.41
Amt Left: 26.05% $1,193,814.33
Over/Under Est: 49.05% $1,953,512.93
Amt Left: 29.53% $1,353,449.85
Delta: -2.76% -$159,635.52
$6,129,180.10
Over/Under Est: 53.89% $2,146,271.02
Amt Left: 33.74% $1,546,207.94
Delta: -3.25% -$192,758.09
Over/Under Est: 73.32% $2,920,190.31
Amt Left: 50.62% $2,320,127.23
Delta: -12.63% -$773,919.29

Bid Items & Bid Tabulations

62 Total 0 of 62
ARANSAS  |  CS  |  CORPUS CHRISTI  |  0916-38-014  |  03/04/2021  |  $3,982,909.08  |  BR 1902(249)  |  REPLACE BRIDGE AND APPROACHES  |  309 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LUCANIA CONSTRUCTION LLC
EARTH BUILDERS, L.P.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
BAY LTD.
KIEWIT INFRASTRUCTURE SOUTH CO.
PREPARING ROW
STA 5.100 $10,000.000 $2,558.000 $10,000.000 $9,519.730 $42,500.000 $50,000.000
EXCAVATION (ROADWAY)
CY 681.000 $10.000 $45.000 $30.000 $34.210 $43.000 $18.530
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,335.000 $20.000 $35.000 $100.000 $54.720 $32.000 $35.790
BLOCK SODDING
SY 1,641.000 $5.000 $6.000 $6.000 $9.440 $8.000 $6.010
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 501.000 $0.250 $2.000 $2.000 $3.040 $3.000 $1.910
DRILL SEEDING (TEMP) (WARM)
SY 501.000 $0.250 $2.000 $2.000 $3.040 $3.000 $1.910
FERTILIZER
AC 0.440 $500.000 $600.000 $1,000.000 $1,702.130 $1,800.000 $2,423.320
VEGETATIVE WATERING
MG 35.000 $20.000 $60.000 $55.000 $96.410 $73.000 $55.770
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 810.000 $75.000 $100.000 $90.000 $137.440 $150.000 $101.440
PRIME COAT (MC-30)
GAL 411.000 $5.000 $6.000 $10.000 $13.410 $10.000 $12.030
ASPH (MULTI OPTION)
GAL 708.000 $5.000 $7.000 $10.000 $8.490 $8.000 $14.220
AGGR (MULTI OPTION)
CY 18.000 $75.000 $25.000 $200.000 $979.600 $880.000 $1,312.320
D-GR HMA(SQ) TY-D SAC-B PG70-22
TON 208.000 $150.000 $145.000 $200.000 $251.480 $1,200.000 $437.440
TACK COAT
GAL 151.000 $3.080 $8.000 $10.000 $21.590 $20.000 $13.120
CEM STABIL BKFL
CY 97.000 $100.000 $200.000 $300.000 $211.490 $100.000 $157.580
TEMPORARY SPL SHORING
SF 1,538.000 $50.000 $130.000 $75.000 $101.530 $63.000 $300.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 2,821.000 $45.000 $145.000 $50.000 $100.130 $15.000 $300.000
SHEET PILING (PZC-26)
SF 31,682.930 $50.000 $52.000 $93.000 $72.200 $70.000 $70.000
PRESTR CONC PIL (24 IN SQ)
LF 512.000 $120.000 $275.000 $300.000 $477.590 $350.000 $400.000
CL C CONC (ABUT)(HPC)
CY 47.400 $1,000.000 $1,800.000 $1,500.000 $1,999.930 $3,400.000 $2,000.000
CL C CONC(COPING)(HPC)
LF 151.000 $150.000 $800.000 $250.000 $423.660 $420.000 $650.000
REINF CONC SLAB (BOX BEAM)(HPC)
SF 4,600.000 $15.000 $40.000 $25.000 $39.290 $53.000 $31.780
BRIDGE SIDEWALK (HPC)
SF 1,000.000 $10.000 $17.000 $20.000 $33.080 $35.000 $16.930
SHEAR KEY
CY 43.500 $420.000 $300.000 $1,000.000 $1,370.930 $990.000 $501.070
PRESTR CONC BOX BEAM (4B34)
LF 398.000 $200.000 $250.000 $275.000 $334.120 $270.000 $350.000
PRESTR CONC BOX BEAM (5B34)
LF 597.000 $210.000 $230.000 $275.000 $334.120 $260.000 $320.000
RIPRAP (CONC)(6 IN)
CY 45.000 $500.000 $650.000 $700.000 $1,423.070 $1,000.000 $462.040
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 12.000 $500.000 $600.000 $800.000 $1,395.090 $1,700.000 $1,492.980
RIPRAP (STONE PROTECTION) (36 IN)
CY 930.000 $200.000 $200.000 $200.000 $307.890 $200.000 $180.000
STR STEEL (MISC NON - BRIDGE)
LB 280.000 $15.000 $23.000 $20.000 $52.080 $43.000 $3.150
RAIL (TY C411) (MOD)
LF 680.000 $200.000 $275.000 $200.000 $258.140 $330.000 $279.230
ARMOR JOINT (SEALED)
LF 84.000 $100.000 $300.000 $100.000 $209.630 $180.000 $114.820
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $200,000.000 $100,000.000 $95,000.000 $149,522.750 $386,100.000 $148,784.000
MOBILIZATION
LS 1.000 $375,000.000 $335,000.000 $550,000.000 $548,000.000 $491,500.000 $685,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $6,000.000 $1,500.000 $2,000.000 $1,389.330 $20,500.000 $25,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $20.000 $22.000 $40.000 $31.720 $46.000 $51.730
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $10.000 $5.000 $25.000 $7.630 $34.000 $22.170
TEMP SEDMT CONT FENCE (INSTALL)
LF 820.000 $2.500 $5.000 $5.000 $4.030 $6.000 $2.130
TEMP SEDMT CONT FENCE (REMOVE)
LF 820.000 $1.000 $1.500 $1.500 $2.380 $2.000 $1.370
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 520.000 $15.000 $62.000 $75.000 $40.020 $41.000 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $30.000 $75.000 $75.000 $47.540 $41.000 $71.310
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 340.000 $5.000 $12.000 $10.000 $23.050 $8.000 $5.970
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $5.000 $20.000 $10.000 $25.270 $8.000 $6.350
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 520.000 $10.000 $12.000 $15.000 $25.960 $21.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $15.000 $40.000 $15.000 $33.240 $21.000 $3.040
CONC CURB (TY II)
LF 447.000 $10.000 $20.000 $35.000 $45.150 $100.000 $35.000
DRIVEWAYS (CONC)
SY 188.000 $100.000 $75.000 $100.000 $80.180 $230.000 $52.340
CONC SIDEWALK (SPECIAL)(RETAINING WALL)
SF 1,705.000 $200.000 $15.000 $15.000 $55.220 $30.000 $20.000
CONDT (PVC) (SCH 40) (2")
LF 710.000 $10.000 $12.000 $15.000 $16.700 $37.000 $8.750
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 210.000 $4.000 $8.000 $8.000 $5.360 $8.000 $6.560
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 4,200.000 $1.000 $2.000 $2.500 $1.900 $4.000 $0.950
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 600.000 $1.000 $2.000 $4.000 $2.440 $4.000 $2.730
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 1,206.000 $0.250 $2.000 $2.000 $1.990 $3.000 $2.410
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 1,206.000 $0.250 $2.000 $2.000 $1.990 $3.000 $2.410
REFL PAV MRKR TY II-A-A
EA 16.000 $4.000 $8.000 $20.000 $15.600 $22.000 $54.680
TEMP TRAF SIGNALS
EA 1.000 $20,000.000 $42,000.000 $50,000.000 $30,903.020 $22,000.000 $36,942.350
INSTL TIED CONCRETE EROSN CONTROL MATS
SF 4,515.000 $10.000 $6.000 $8.000 $20.490 $7.000 $11.210
FLOATING TURBIDITY BARRIER(FUR & INST)
LF 385.000 $50.000 $50.000 $45.000 $75.180 $59.000 $114.590
FLOATING TURBIDITY BARRIER (REMOVE)
LF 385.000 $15.000 $30.000 $5.000 $24.500 $37.000 $34.370
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $17,600.000 $15,000.000 $21,851.970 $24,200.000 $7,081.060
TMA (STATIONARY)
DAY 30.000 $180.000 $450.000 $200.000 $748.940 $340.000 $264.650
TMA (MOBILE OPERATION)
HR 80.000 $50.000 $870.000 $200.000 $258.070 $66.000 $87.760
Totals: $3,982,909.080 $4,582,972.160 $5,776,786.490 $5,936,422.033 $6,129,180.100 $6,903,099.396