Show Job Controls
Bid Cobra

ARANSAS PR 13B (0585-01-016)

Items: 37

County: ARANSAS
Length: N/A
Highway: PR 13B
District: CORPUS CHRISTI
Control Number: 0585-01-016
DBE Goal: N/A
Project: ER 1802(687)
Guaranty: N/A
Time: 102 WORKING DAYS
Engineer's Estimate: $351,312.10
Date: 01/09/2020 (6 years ago)
Contract Number: N/A
Type: REPAIR SEA WALL AND DAMAGED ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$351,312.10
$540,816.30
Over/Under Est: 53.94% $189,504.20
Over/Under Est: 67.97% $238,800.22
Amt Left: 9.12% $49,296.02
Over/Under Est: 128.6% $451,801.42
Amt Left: 48.5% $262,297.22
Delta: -36.10% -$213,001.20

Bid Items & Bid Tabulations

37 Total 0 of 37
ARANSAS  |  PR 13B  |  CORPUS CHRISTI  |  0585-01-016  |  01/09/2020  |  $351,312.10  |  ER 1802(687)  |  REPAIR SEA WALL AND DAMAGED ROADWAY  |  102 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONE STAR SITEWORK, LLC
ALTUS CONSTRUCTION LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 5.000 $2,000.000 $1,140.000 $5,387.050 $1,205.850
EXCAVATION (ROADWAY)
CY 213.000 $6.000 $15.000 $56.720 $53.550
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 924.000 $30.000 $80.000 $47.300 $58.890
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 181.000 $55.000 $159.000 $142.750 $158.460
REWORK BS MTL (TY B) (6") (ORD COMP)
SY 945.000 $2.000 $10.000 $5.330 $11.290
CEMENT
TON 14.000 $165.000 $240.000 $365.610 $300.150
CEM TRT(PLNT MX) (CL N)(TYA)(GR1-2)(6")
SY 1,133.000 $16.000 $26.000 $16.990 $22.830
PRIME COAT (MC-30)
GAL 208.000 $3.000 $8.800 $7.430 $15.040
ASPH (MULTI OPTION)
GAL 317.000 $3.000 $7.600 $5.130 $11.020
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 1,224.000 $3.000 $6.200 $5.230 $6.260
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 41.000 $125.000 $332.000 $165.310 $597.820
D-GR HMA(SQ) TY-D SAC-B PG64-22
TON 104.000 $175.000 $271.000 $118.980 $261.460
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 405.000 $200.000 $28.300 $74.570 $173.370
CL C CONC (COPING)(SRC)
CY 24.200 $1,000.000 $4,400.000 $1,413.140 $4,727.360
RIPRAP (CONC)(4 IN)
CY 56.900 $525.000 $848.000 $526.000 $740.450
RAIL (HANDRAIL)(TY A)
LF 80.000 $80.000 $35.000 $248.850 $174.950
REMOVE STR (BOLLARD)
EA 12.000 $250.000 $100.000 $306.080 $337.180
MOBILIZATION
LS 1.000 $23,500.000 $27,000.000 $58,487.930 $161,868.760
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $916.000 $15,391.560 $838.480
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 100.000 $16.000 $25.000 $27.910 $28.560
CONSTRUCTION EXITS (REMOVE)
SY 100.000 $5.000 $10.000 $11.790 $17.560
TEMP SEDMT CONT FENCE (INSTALL)
LF 910.000 $3.000 $6.000 $8.840 $5.180
TEMP SEDMT CONT FENCE (REMOVE)
LF 910.000 $1.000 $3.000 $0.940 $2.320
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 60.000 $5.000 $20.000 $8.650 $18.260
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $1.000 $6.000 $1.410 $12.760
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 134.000 $1.000 $6.000 $6.460 $6.150
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 252.000 $0.300 $2.100 $2.620 $2.340
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 2,650.000 $0.300 $2.000 $2.620 $1.690
PRE PM TY C (ACC PRK)(BLU)(SYMBL ONLY)
EA 2.000 $200.000 $270.000 $2,034.460 $300.370
REFL PAV MRKR TY II-A-A
EA 34.000 $3.000 $12.000 $23.010 $19.610
CRACK CLEANING AND SEALING (JCP)
LF 28.000 $10.000 $40.000 $538.700 $246.340
FLOATING TURBIDITY BARRIER(FUR & INST)
LF 750.000 $20.000 $80.000 $39.250 $101.970
FLOATING TURBIDITY BARRIER (REMOVE)
LF 750.000 $5.000 $20.000 $45.150 $50.060
WOODEN BOLLARDS
EA 12.000 $500.000 $400.000 $1,539.160 $370.540
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 90.000 $75.000 $103.000 $92.350 $113.240
TMA (STATIONARY)
DAY 30.000 $150.000 $294.000 $461.750 $509.790
TMA (MOBILE OPERATION)
HR 72.000 $50.000 $150.000 $123.130 $178.590
Totals: $351,312.100 $540,816.300 $590,112.328 $803,113.527