ANGELINA US0059 (6486-25-001)

Items: 31

County: ANGELINA
Length: 0.0100 MILES
Highway: US0059
District: LUFKIN
Control Number: 6486-25-001
DBE Goal: N/A
Project: RMC - A00216240
Guaranty: $4,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $282,300.00
Date: 07/23/2025 (10 months ago)
Contract Number: 7251103
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00216240
Project Description: REPAIR AND MAINTENANCE OF METAL BEAM GUARD FENCE
Mail/Deliver Bids To: N/A
LAUREN PERRY
TAMARA GIBSON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$282,300.00
$293,167.00
Over/Under Est: 3.85% $10,867.00
Over/Under Est: 6.93% $19,566.00
Amt Left: 2.97% $8,699.00
Over/Under Est: 37.96% $107,169.00
Amt Left: 32.85% $96,302.00
Delta: -29.02% -$87,603.00

Bid Items & Bid Tabulations

31 Total 0 of 31
ANGELINA  |  US0059  |  LUFKIN  |  6486-25-001  |  07/23/2025  |  $282,300.00  |  RMC - A00216240  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RHINO EQUITY, LLC
AUSTIN BARRICADE COMPANY, L.L.C.
ACE CONTRACTORS, INC.
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 10.000 $40.000 $40.000 $66.000 $250.000
CONC STR REPAIR (STANDARD)
SF 10.000 $100.000 $40.000 $65.000 $250.000
MOBILIZATION (CALLOUT)
EA 10.000 $250.000 $1.000 $1.000 $500.000
TMA (STATIONARY)
DAY 30.000 $250.000 $2,500.000 $500.000 $300.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,500.000 $30.000 $15.000 $15.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $1,250.000 $450.000 $1,500.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 2,000.000 $3.000 $3.000 $0.010 $2.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $100.000 $1.000 $1.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,105.000 $2,800.000 $2,500.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $150.000 $100.000 $100.000 $1.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $2,160.000 $500.000 $1,000.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $25,000.000 $25,500.000 $30,000.000 $32,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 2.000 $35.000 $10.000 $100.000 $25.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 500.000 $37.500 $30.000 $80.000 $40.000
REPLACE TIMBER POST W/O CONC FND
EA 15.000 $70.000 $50.000 $60.000 $75.000
REPLACE STEEL POST W/O CONC FND
EA 15.000 $1.000 $1.000 $50.000 $1.000
REPLACE TIMBER POST W/ CONC FND
EA 75.000 $75.000 $65.000 $100.000 $40.000
REPLACE STEEL POST W/ CONC FND
EA 75.000 $1.000 $1.000 $1.000 $1.000
REM OBSOLETE GET & REPL W/ SGT
EA 5.000 $6,000.000 $3,000.000 $6,000.000 $6,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 1.000 $750.000 $1.000 $2,000.000 $800.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 500.000 $45.000 $50.000 $20.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $150.000 $100.000 $800.000 $250.000
REPLACE BLOCKOUT
EA 75.000 $25.000 $25.000 $50.000 $20.000
RESET SGT IMPACT HEAD
EA 1.000 $200.000 $100.000 $200.000 $500.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $1,000.000 $800.000 $1,250.000 $1,750.000
REMOVE (WIDE TRACC)
EA 1.000 $3,500.000 $100.000 $100.000 $1,000.000
REPLACE (WIDE TRACC)
EA 1.000 $3,500.000 $2,500.000 $100.000 $30,000.000
REPAIR (WIDE TRACC BAY)
EA 30.000 $50.000 $50.000 $250.000 $2,000.000
REPAIR (QUAD)(N)(M)
LF 5.000 $500.000 $300.000 $1,500.000 $2,000.000
REPAIR (T101RC)
LF 8.000 $60.000 $40.000 $100.000 $50.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 25.000 $50.000 $75.000 $100.000 $50.000
Totals: $282,300.000 $293,167.000 $301,866.000 $389,469.000