|
|
MOBILIZATION (CALLOUT)
|
EA
|
6.000
|
$500.000
|
$4,000.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
20.000
|
$83.000
|
$185.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
150.000
|
$20.000
|
$20.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
300.000
|
$29.000
|
$20.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
150.000
|
$30.000
|
$20.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
300.000
|
$30.000
|
$20.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,500.000
|
$1.400
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,000.000
|
$1.400
|
$2.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
300.000
|
$2.500
|
$2.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$1,400.000
|
$2,000.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
5.000
|
$850.000
|
$525.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
|
EA
|
3.000
|
$8,500.000
|
$8,000.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(N)SP(O)
|
EA
|
3.000
|
$7,200.000
|
$7,000.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(N)TP(O)
|
EA
|
3.000
|
$3,500.000
|
$3,500.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
10.000
|
$750.000
|
$600.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
15.000
|
$150.000
|
$200.000
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)
|
EA
|
15.000
|
$200.000
|
$200.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
30.000
|
$130.000
|
$200.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
2,000.000
|
$1.450
|
$2.250
|
|
|
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
|
LF
|
1,000.000
|
$1.750
|
$2.250
|
|
|
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
|
LF
|
2,000.000
|
$2.750
|
$2.250
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
1,000.000
|
$3.480
|
$3.250
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$4,500.000
|
$6,000.000
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
5.000
|
$250.000
|
$300.000
|
|
|
INSTALL OF SPAN CABLE ASSM
|
LF
|
500.000
|
$9.900
|
$3.000
|
|
|
REPLACE OF SIGNAL HEAD ASSM
|
EA
|
50.000
|
$500.000
|
$250.000
|
|
|
REPLACE OF PEDESTRIAN PUSH BUTTONS
|
EA
|
8.000
|
$700.000
|
$130.000
|
|
|
INSTALL OF FND FOR GROUND MNT CABINETS
|
EA
|
2.000
|
$3,000.000
|
$2,500.000
|
|
|
REPLACE OF CONTROL CABINET(POLE MNT)
|
EA
|
1.000
|
$1,500.000
|
$2,000.000
|
|
|
REPLACE OF SIGNAL POLE ASSM
|
EA
|
2.000
|
$3,000.000
|
$12,000.000
|
|
|
REMOVAL OF CONCRETE FOUNDATIONS
|
EA
|
3.000
|
$700.000
|
$500.000
|
|
|
INS OF TRF SIG PL FND (30" DRIL SHFT)
|
LF
|
33.000
|
$400.000
|
$350.000
|
|
|
INS OF TRF SIG PL FND (36" DRIL SHFT)
|
LF
|
30.000
|
$500.000
|
$350.000
|
|
|
INSTL PED POLE ASSM
|
EA
|
3.000
|
$1,700.000
|
$2,000.000
|
|
|
VIVDS CABLE (INSTALL)
|
LF
|
1,500.000
|
$2.000
|
$1.500
|
|
|
REPLACE BREAKAWAY FUSE HOLDER
|
EA
|
50.000
|
$175.000
|
$75.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
2.000
|
$7,500.000
|
$7,500.000
|
|
|
REPLACE BBU BATTERIES
|
EA
|
6.000
|
$2,100.000
|
$2,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$300.000
|
$300.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 3)
|
EA
|
2.000
|
$500.000
|
$650.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 9)
|
EA
|
2.000
|
$350.000
|
$650.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 12)
|
EA
|
2.000
|
$500.000
|
$650.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 3)
|
HR
|
8.000
|
$50.000
|
$500.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 9)
|
HR
|
8.000
|
$50.000
|
$500.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 12)
|
HR
|
8.000
|
$50.000
|
$500.000
|
|
Totals: |
$269,890.000
|
$285,915.000
|