Show Job Controls
Bid Cobra

ANGELINA US0059 (6442-72-001)

Items: 25

County: ANGELINA
Length: N/A
Highway: US0059
District: LUFKIN
Control Number: 6442-72-001
DBE Goal: N/A
Project: RMC - 644272001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $198,733.00
Date: 08/16/2023 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR - ANGELINA
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$198,733.00
Over/Under Est: -22.12% -$43,963.00
$289,370.00
Over/Under Est: 45.61% $90,637.00
Amt Left: 86.97% $134,600.00
Over/Under Est: 62.19% $123,587.00
Amt Left: 108.26% $167,550.00
Delta: -11.39% -$32,950.00

Bid Items & Bid Tabulations

25 Total 0 of 25
ANGELINA  |  US0059  |  LUFKIN  |  6442-72-001  |  08/16/2023  |  $198,733.00  |  RMC - 644272001  |  METAL BEAM GUARD FENCE REPAIR - ANGE...  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BARRICADE COMPANY, L.L.C.
CATOCON, INC.
SJ&J CONSTRUCTION, LLC
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $200.000 $50.000 $1.000 $175.000
CONC STR REPAIR (STANDARD)
SF 50.000 $302.000 $50.000 $40.000 $175.000
MOBILIZATION (CALLOUT)
EA 12.000 $250.000 $1.000 $1,000.000 $3,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $28.000 $30.000 $44.000 $34.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $500.000 $1,800.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $2.900 $10.000 $5.000 $4.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $255.000 $1.000 $50.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,250.000 $2,500.000 $5,000.000 $4,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $18.500 $50.000 $25.000 $40.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 50.000 $22.000 $100.000 $100.000 $25.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 50.000 $50.000 $150.000 $100.000 $70.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 20.000 $75.000 $150.000 $200.000 $100.000
REMOVE & REPLACE BLOCKOUT
EA 10.000 $25.000 $500.000 $100.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 25.000 $35.000 $400.000 $100.000 $48.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 2.000 $75.000 $350.000 $250.000 $75.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 7.000 $5,000.000 $4,750.000 $6,000.000 $4,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $110.000 $1.000 $900.000 $1,900.000
REM & RESET SGT IMPACT HEAD
EA 1.000 $200.000 $1,000.000 $250.000 $500.000
REMOVE AND REPLACE DAT
EA 5.000 $1,400.000 $1,000.000 $1,300.000 $2,000.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $20,000.000 $3,500.000 $17,000.000 $28,000.000
REPAIR (QUAD) (N) (BAY)
EA 15.000 $1,500.000 $100.000 $1,000.000 $2,000.000
REPAIR (TRACC) (BAY)
EA 26.000 $600.000 $50.000 $3,000.000 $1,700.000
REPAIR (TY T101RC)
LF 50.000 $50.000 $40.000 $100.000 $300.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 50.000 $500.000 $100.000 $50.000 $250.000
TMA (STATIONARY)
DAY 7.000 $200.000 $5,012.000 $3,000.000 $350.000
Totals: $198,733.000 $154,770.000 $289,370.000 $322,320.000