ANGELINA VA (0911-00-136)

Items: 65

County: ANGELINA
Length: N/A
Highway: VA
District: LUFKIN
Control Number: 0911-00-136
DBE Goal: 300.0%
Project: F 2024(104)
Guaranty: N/A
Time: 142 WORKING DAYS
Engineer's Estimate: $2,533,632.00
Date: 07/10/2024 (1 year ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,533,632.00
$2,561,303.75
Over/Under Est: 1.09% $27,671.75
$2,644,727.00
Over/Under Est: 4.38% $111,095.00
Amt Left: 3.26% $83,423.25
Over/Under Est: 5.99% $151,705.00
Amt Left: 4.84% $124,033.25
Delta: -1.54% -$40,610.00
Subcontractor Percentage Amount
ROBIN STEEL LLC 1.04% $26,814.85
CONCRETE CUTTING & BREAKING COMPANY 0.89% $22,947.32
PBJ CONSTRUCTION 0.78% $20,111.13
LONESTAR TRAFFIC SAFETY, LLC 0.53% $13,665.26
LUF-NAC TREE SERVICE 0.29% $7,477.22
STRIPE-A-ZONE, LLC 0.25% $6,445.88
Total: 3.78% $97,461.66

Bid Items & Bid Tabulations

65 Total 0 of 65
ANGELINA  |  VA  |  LUFKIN  |  0911-00-136  |  07/10/2024  |  $2,533,632.00  |  F 2024(104)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  142 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, LLC
FNH CONSTRUCTION, LLC
GARRET SHIELDS INFRASTRUCTURE
PREPARING ROW
STA 165.000 $500.000 $1,000.000 $1,500.000 $1,000.000
REMOVING CONC (RIPRAP)
SY 40.000 $115.000 $19.950 $100.000 $40.000
REMOVING CONC (DRIVEWAYS)
SY 3,211.000 $15.000 $24.850 $22.000 $50.000
REMOVING CONC (CURB)
LF 1,407.000 $10.000 $11.340 $20.000 $20.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 125.000 $100.000 $12.770 $50.000 $40.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 926.000 $10.000 $21.540 $50.000 $10.000
EXCAVATION (ROADWAY)
CY 1,175.000 $35.000 $64.030 $30.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 671.000 $50.000 $67.280 $50.000 $40.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 2.000 $200.000 $110.000 $150.000 $120.000
FURNISHING AND PLACING TOPSOIL (4")
SY 3,988.000 $5.500 $3.770 $10.000 $4.000
BLOCK SODDING
SY 3,988.000 $10.000 $6.600 $10.000 $12.000
VEGETATIVE WATERING
MG 159.000 $30.000 $1.100 $50.000 $40.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 15.000 $200.000 $115.500 $100.000 $120.000
CEM STABIL BKFL
CY 10.000 $400.000 $582.450 $350.000 $300.000
CL C CONC (RAIL FOUNDATION)
CY 14.000 $600.000 $1,100.000 $2,000.000 $600.000
RIPRAP (CONC)(4 IN)
CY 4.000 $650.000 $738.760 $1,000.000 $1,000.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 5.000 $700.000 $1,100.000 $1,000.000 $1,000.000
RIPRAP (CONC)(FLUME)
CY 2.000 $1,500.000 $738.760 $1,000.000 $1,000.000
RAIL (TY C221)
LF 99.000 $200.000 $137.500 $250.000 $100.000
RAIL (HANDRAIL)(TY E)
LF 30.000 $210.000 $357.500 $200.000 $300.000
RAIL (TY PR11)
LF 15.000 $210.000 $411.950 $200.000 $300.000
RETROFIT RAIL (TY C221)
LF 56.000 $600.000 $137.500 $500.000 $200.000
RETROFIT RAIL (TY C223)
LF 36.000 $600.000 $165.000 $500.000 $200.000
RC PIPE (CL III)(24 IN)
LF 16.000 $150.000 $165.000 $200.000 $200.000
INLET (COMPL)(PSL)(RC)(5FTX5FT)
EA 1.000 $8,000.000 $11,000.000 $15,000.000 $10,000.000
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
EA 2.000 $8,000.000 $11,000.000 $13,500.000 $5,000.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 15.000 $20,000.000 $6,156.480 $20,000.000 $15,000.000
ADJUSTING MANHOLES
EA 1.000 $2,500.000 $1,504.800 $2,500.000 $1,000.000
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 9.000 $1,750.000 $418.000 $650.000 $1,000.000
REMOV STR (PIPE)
LF 16.000 $80.000 $165.000 $50.000 $100.000
REMOV STR (MASONARY)
LF 10.000 $50.000 $75.240 $150.000 $100.000
MOBILIZATION
LS 1.000 $235,000.000 $247,518.000 $270,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $3,500.000 $2,750.000 $8,500.000 $4,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 12,460.000 $5.000 $0.110 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 12,460.000 $1.500 $0.110 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 200.000 $15.000 $0.110 $18.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $3.000 $0.110 $9.000 $2.000
CONC CURB (TY I)
LF 1,372.000 $40.000 $50.320 $45.000 $40.000
CONC CURB & GUTTER (TY II)
LF 273.000 $180.000 $50.320 $55.000 $40.000
CONC CURB (TY C1)
LF 64.000 $100.000 $166.040 $85.000 $40.000
CONC CURB (TY F2)
LF 53.000 $100.000 $166.040 $105.000 $40.000
DRIVEWAYS (CONC)
SY 2,988.000 $175.000 $111.840 $85.000 $120.000
DRIVEWAYS (ACP)
SY 1,191.000 $50.000 $99.000 $65.000 $80.000
CONC SIDEWALKS (5")
SY 7,351.000 $70.000 $131.920 $70.000 $110.000
CONC SIDEWALKS (6")
SY 21.000 $100.000 $155.610 $85.000 $90.000
CURB RAMPS (TY 3)
EA 1.000 $3,000.000 $1,828.440 $3,250.000 $3,000.000
CURB RAMPS (TY 5)
EA 5.000 $3,500.000 $1,828.440 $3,250.000 $3,000.000
CURB RAMPS (TY 7)
EA 4.000 $2,800.000 $1,828.440 $3,250.000 $3,000.000
CURB RAMPS (TY 10)
EA 16.000 $3,200.000 $1,828.440 $3,250.000 $3,000.000
CONC MEDIAN
SY 33.000 $250.000 $131.920 $250.000 $120.000
REMOVE METAL BEAM GUARD FENCE
LF 157.000 $10.000 $27.500 $5.000 $10.000
MAILBOX INSTALL-S (TIM-POST) TY 5
EA 20.000 $350.000 $495.000 $1,000.000 $400.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,200.000 $495.000 $1,500.000 $1,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 15.000 $600.000 $495.000 $1,500.000 $500.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 1.000 $550.000 $495.000 $1,100.000 $500.000
REMOVE SM RD SN SUP&AM
EA 16.000 $125.000 $27.500 $100.000 $100.000
PREFAB PAV MRK TY C (W) (8") (SLD)
LF 15.000 $5.000 $110.000 $20.000 $15.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 108.000 $20.000 $82.500 $20.000 $25.000
ELIM EXT PAV MRK & MRKS (4")
LF 12.000 $1.500 $22.000 $10.000 $4.000
ELIM EXT PAV MRK & MRKS (6")
LF 41.000 $1.000 $22.000 $10.000 $5.000
ELIM EXT PAV MRK & MRKS (24")
LF 39.000 $6.000 $22.000 $20.000 $6.000
PAV SURF PREP FOR MRK (8")
LF 15.000 $2.000 $11.000 $10.000 $3.000
PAV SURF PREP FOR MRK (24")
LF 108.000 $5.000 $11.000 $20.000 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $1.100 $16,500.000 $1,000.000
TMA (STATIONARY)
DAY 120.000 $250.000 $1.100 $250.000 $300.000
Totals: $2,533,632.000 $2,561,303.750 $2,644,727.000 $2,685,337.000