Show Job Controls
Bid Cobra

ANGELINA VA (0911-00-081)

Items: 59

County: ANGELINA
Length: N/A
Highway: VA
District: LUFKIN
Control Number: 0911-00-081
DBE Goal: N/A
Project: STP 2020(175)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $1,315,318.10
Date: 01/10/2020 (6 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,315,318.10
$1,262,425.00
Over/Under Est: -4.02% -$52,893.10
$1,394,770.70
Over/Under Est: 6.04% $79,452.60
Amt Left: 10.48% $132,345.70
$1,604,401.20
Over/Under Est: 21.98% $289,083.10
Amt Left: 27.09% $341,976.20
Delta: -15.03% -$209,630.50
$1,663,667.41
Over/Under Est: 26.48% $348,349.31
Amt Left: 31.78% $401,242.41
Delta: -3.69% -$59,266.21
$1,673,171.00
Over/Under Est: 27.21% $357,852.90
Amt Left: 32.54% $410,746.00
Delta: -0.57% -$9,503.59

Bid Items & Bid Tabulations

59 Total 0 of 59
ANGELINA  |  VA  |  LUFKIN  |  0911-00-081  |  01/10/2020  |  $1,315,318.10  |  STP 2020(175)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
TI-ZACK CONCRETE, INC.
ENCINO LANDSCAPE, INC.
ALTUS CONSTRUCTION LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 68.500 $500.000 $1,000.000 $750.000 $3,000.000 $3,397.190 $2,200.000
REMOVING CONC (MEDIANS)
SY 126.000 $20.000 $25.000 $38.000 $20.000 $5.040 $30.000
REMOVING CONC (SIDEWALKS)
SY 288.000 $20.000 $25.000 $17.000 $20.000 $20.280 $30.000
REMOVING CONC (DRIVEWAYS)
SY 1,197.000 $20.000 $25.000 $24.000 $20.000 $16.390 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 10.000 $20.000 $10.000 $50.000 $20.000 $13.380 $30.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 972.000 $30.000 $30.000 $25.000 $25.000 $37.930 $35.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 41.000 $130.000 $50.000 $50.000 $200.000 $258.950 $150.000
FURNISHING AND PLACING TOPSOIL (4")
SY 6,918.000 $1.500 $5.000 $5.000 $1.000 $1.630 $8.000
BLOCK SODDING
SY 6,918.000 $4.500 $5.000 $5.000 $5.000 $6.280 $6.000
BROADCAST SEED (TEMP) (WARM)
SY 3,462.000 $0.150 $1.000 $0.250 $0.150 $0.350 $2.000
BROADCAST SEED (TEMP) (COOL)
SY 3,462.000 $0.150 $1.000 $0.250 $0.150 $0.340 $2.000
VEGETATIVE WATERING
MG 276.900 $25.000 $50.000 $1.000 $4.000 $20.420 $25.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 629.000 $2.000 $2.000 $3.000 $4.000 $3.000 $6.500
CEM STABIL BKFL
CY 212.000 $150.000 $180.000 $150.000 $200.000 $84.240 $300.000
CUT & RESTORE CONC PAVING
SY 8.000 $250.000 $3,550.000 $140.000 $300.000 $181.840 $200.000
CUT & RESTORE ASPH PAVING
SY 254.000 $150.000 $65.000 $52.000 $150.000 $141.250 $200.000
TRENCH EXCAVATION PROTECTION
LF 575.000 $6.000 $5.000 $16.000 $5.000 $9.510 $10.000
CL A CONC (COLLAR)
EA 3.000 $1,250.000 $1,000.000 $1,500.000 $1,500.000 $1,732.570 $2,500.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 22.000 $200.000 $250.000 $140.000 $200.000 $105.110 $185.000
RAIL (HANDRAIL)(TY E)
LF 703.000 $175.000 $100.000 $100.000 $220.000 $122.490 $125.000
RC PIPE (CL III)(18 IN)
LF 556.000 $60.000 $45.000 $150.000 $75.000 $53.190 $85.000
RC PIPE (CL III)(24 IN)
LF 252.000 $90.000 $54.000 $57.000 $85.000 $78.790 $105.000
RC PIPE (CL III)(30 IN)
LF 10.000 $150.000 $100.000 $81.000 $110.000 $113.570 $125.000
RC PIPE (CL III)(36 IN)
LF 348.000 $250.000 $110.000 $125.000 $140.000 $159.800 $180.000
MANH (COMPL)(PRM)(48IN)
EA 8.000 $3,500.000 $3,500.000 $4,500.000 $4,000.000 $4,212.510 $7,000.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 2.000 $4,500.000 $3,100.000 $5,000.000 $5,000.000 $5,639.330 $5,000.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 1.000 $5,000.000 $3,600.000 $6,000.000 $5,000.000 $6,916.670 $6,500.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 1.000 $5,000.000 $3,600.000 $6,000.000 $5,000.000 $6,916.670 $6,500.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 2.000 $5,500.000 $4,100.000 $6,000.000 $6,000.000 $8,194.020 $8,500.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $4,500.000 $3,500.000 $5,000.000 $5,000.000 $5,870.340 $8,500.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $5,500.000 $5,000.000 $7,000.000 $5,500.000 $9,512.130 $10,000.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 1.000 $3,500.000 $3,000.000 $2,500.000 $4,200.000 $4,979.060 $3,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $7,000.000 $5,500.000 $6,500.000 $8,000.000 $8,231.140 $6,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 15.000 $750.000 $600.000 $1,250.000 $800.000 $917.240 $1,850.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $4,500.000 $4,000.000 $5,000.000 $4,500.000 $7,490.120 $3,500.000
REMOV STR (INLET)
EA 11.000 $1,500.000 $500.000 $500.000 $1,000.000 $687.410 $2,500.000
REMOV STR (PIPE)
EA 12.000 $150.000 $300.000 $1,300.000 $400.000 $388.560 $500.000
MOBILIZATION
LS 1.000 $113,000.000 $150,000.000 $133,000.000 $120,000.000 $163,065.010 $160,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $7,500.000 $5,000.000 $1,500.000 $8,000.000 $10,191.560 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 143.000 $30.000 $55.000 $1.000 $40.000 $33.900 $18.000
ROCK FILTER DAMS (REMOVE)
LF 143.000 $10.000 $10.000 $1.000 $10.000 $10.650 $9.000
SANDBAGS FOR EROSION CONTROL (12")
LF 150.000 $10.000 $1.000 $1.000 $10.000 $13.660 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,484.000 $3.000 $1.000 $0.100 $2.500 $2.820 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,484.000 $1.000 $1.000 $0.100 $0.500 $0.830 $2.000
CONC CURB (TY II)
LF 313.000 $25.000 $25.000 $40.000 $20.000 $22.130 $35.000
CONC CURB & GUTTER (TY II)
LF 936.000 $30.000 $20.000 $40.000 $30.000 $27.610 $40.000
CONC CURB (TY F1)
LF 177.000 $180.000 $55.000 $92.000 $200.000 $161.740 $40.000
CONC CURB (TY F2)
LF 24.000 $180.000 $250.000 $185.000 $200.000 $175.380 $40.000
CONC CURB (TY F3)
LF 66.000 $180.000 $250.000 $350.000 $200.000 $171.550 $40.000
DRIVEWAYS (CONC)
SY 2,281.000 $80.000 $79.000 $105.000 $90.000 $88.330 $80.000
CONC SIDEWALKS (4")
SY 2,731.000 $60.000 $68.000 $95.000 $80.000 $74.740 $55.000
CURB RAMPS (TY 7)
EA 13.000 $1,500.000 $1,000.000 $1,850.000 $1,500.000 $2,166.080 $2,000.000
MAILBOX INSTALL-S (TIM-POST) TY 5
EA 4.000 $450.000 $500.000 $420.000 $400.000 $375.730 $650.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 5.000 $500.000 $500.000 $750.000 $500.000 $688.680 $650.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 6.000 $400.000 $500.000 $750.000 $400.000 $520.590 $1,550.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 42.000 $25.000 $30.000 $65.000 $20.000 $54.360 $50.000
PAV SURF PREP FOR MRK (24")
LF 42.000 $2.500 $10.000 $25.000 $2.000 $13.590 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,000.000 $5,000.000 $4,000.000 $9,500.000 $6,794.380 $16,000.000
TMA (STATIONARY)
DAY 120.000 $250.000 $250.000 $25.000 $300.000 $679.440 $350.000
Totals: $1,315,318.100 $1,262,425.000 $1,394,770.700 $1,604,401.200 $1,663,667.423 $1,673,171.000