FACILITY AND BUILDINGS AT RAIL CROSSING
Engineer's Estimate
Average:
$24,246,764.00
Maximum:
$24,246,764.00
Minimum:
$24,246,764.00
Bid Information
Average Bid:
$26,377,164.70
