48"SAN SWR MANHOLE (FRP)(6'-10' DEPTH)
Engineer's Estimate
Average:
$10,000.00
Maximum:
$10,000.00
Minimum:
$10,000.00
Bid Information
Average Bid:
$16,292.14
