Bid Cobra

TIE-IN (COMPLETE) (12" PVC TO 12" PVC)

Engineer's Estimate

Average: $5,000.00
Maximum: $5,000.00
Minimum: $5,000.00

Bid Information

Average Bid: $4,887.98