Bid Cobra

NGP (LONG SVC) (NEW MAIN TO PROP LINE)

Engineer's Estimate

Average: $5,000.00
Maximum: $5,000.00
Minimum: $5,000.00

Bid Information

Average Bid: $27,320.00