Bid Cobra

INS OH SN SUP(75 FT BRDG)(CIRC TUBE)

Engineer's Estimate

Average: $215,000.00
Maximum: $250,000.00
Minimum: $180,000.00

Bid Information

Average Bid: $176,560.64